<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/texas_state_opportunities/posts/116686533748161673" -->

---
title: DB-RFQ 26-16 Building C1 Rotunda – Texas State Opportunities | Closed - MatchAwards
description: DB-RFQ 26-16 Building C1 Rotunda. Texas State Opportunities. NAICS 236220 - Commercial and Institutional Building Construction. Deadline 2026-06-25. Building C1, the Central Campus Interactive Learning Center, wascompleted in 2004. In preparation for the twentieth-year roof renewal,...
canonical: https://matchawards.com/texas_state_opportunities/posts/116686533748161673
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: DB-RFQ 26-16 Building C1 Rotunda – Texas State Opportunities | Closed
og:url: https://matchawards.com/texas_state_opportunities/posts/116686533748161673
og:description: DB-RFQ 26-16 Building C1 Rotunda. Texas State Opportunities. NAICS 236220 - Commercial and Institutional Building Construction. Deadline 2026-06-25. Building C1, the Central Campus Interactive Learning Center, wascompleted in 2004. In preparation for the twentieth-year roof renewal,...
og:image: https://matchawards.com/system/accounts/avatars/000/090/979/original/ef6c8a6597aa524c.jpeg?1756409468
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# DB-RFQ 26-16 Building C1 Rotunda

Agency

Texas State Opportunities

NAICS

236220 - Commercial and Institutional Building Construction

Deadline

2026-06-25

Place of performance

Texas, United States

## Description

Building C1, the Central Campus Interactive Learning Center, wascompleted in 2004\. In preparation for the twentieth-year roof renewal, acomprehensive inspection revealed significant on-going issues with thebuilding’s metal panel system. The College’s ultimate conclusion was that thelong-term health of the building would be enhanced by converting the existingsingle barrier ACM system to a rain-screen design.

[Source notice](https://www.txsmartbuy.gov/esbd/DB%5FRFQ%5F26-16)

```json
{"@context":"https://schema.org","@type":"Demand","name":"DB-RFQ 26-16 Building C1 Rotunda","description":"Building C1, the Central Campus Interactive Learning Center, wascompleted in 2004. In preparation for the twentieth-year roof renewal, acomprehensive inspection revealed significant on-going issues with thebuilding’s metal panel system. The College’s ultimate conclusion was that thelong-term health of the building would be enhanced by converting the existingsingle barrier ACM system to a rain-screen design.","url":"https://matchawards.com/texas_state_opportunities/posts/116686533748161673","category":"236220 - Commercial and Institutional Building Construction","availabilityEnds":"2026-06-25T00:00:00.000Z","areaServed":"Texas, United States","sameAs":"https://www.txsmartbuy.gov/esbd/DB_RFQ_26-16"}
```

