<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/national_institute_of_standards_and_technology/posts/116766714528410485" -->

---
title: Steam Tunnel Ventilation Replacement | Closed - MatchAwards
description: Steam Tunnel Ventilation Replacement. National Institute of Standards and Technology. NAICS 236220 - Commercial and Institutional Building Construction. Deadline 2026-08-05. SEE ATTACHMENTS FOR FULL PROJECT DETAILS Project: Construction Services/Steam Tunnel Ventilation System Replacement, NIST,...
canonical: https://matchawards.com/national_institute_of_standards_and_technology/posts/116766714528410485
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Steam Tunnel Ventilation Replacement | Closed
og:url: https://matchawards.com/national_institute_of_standards_and_technology/posts/116766714528410485
og:description: Steam Tunnel Ventilation Replacement. National Institute of Standards and Technology. NAICS 236220 - Commercial and Institutional Building Construction. Deadline 2026-08-05. SEE ATTACHMENTS FOR FULL PROJECT DETAILS Project: Construction Services/Steam Tunnel Ventilation System Replacement, NIST,...
og:image: https://matchawards.com/system/accounts/avatars/000/000/079/original/f99c7bf4a5a27713.jpg?1638989275
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Steam Tunnel Ventilation Replacement

Agency

National Institute of Standards and Technology

Office

GAITHERSBURG, USA

Solicitation number

1333ND26RNB190032

NAICS

236220 - Commercial and Institutional Building Construction

Set-aside

Total Small Business Set-Aside (FAR 19.5)

Posted

2026-07-29

Deadline

2026-08-05

Place of performance

Boulder, Colorado 80305, UNITED STATES

## Description

SEE ATTACHMENTS FOR FULL PROJECT DETAILS

Project: Construction Services/Steam Tunnel Ventilation System Replacement, NIST, Boulder, CO  
  
This acquisition is a 100% Small Business Set-Aside.

The NAICS for this acquisition is 236220; the Small Business Size Standard is $45.0 Million.

The purpose of this project is to replace the existing tunnel ventilation system with steam heating coils with (2) natural gas indirect fired make up air units (MAU’s).

This construction effort will procure and deliver a complete, operational tunnel ventilation system, including removal of existing equipment, installation MAU’s, and all associated systems required for safe, reliable, and continuous ventilation system. Work will be planned and phased to be performed between the months of May 1 through October 31, mitigating the chances for pipes to freeze.

## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/25897302eee546849c7a558a2eee6fb9/download)
* [Attachment 2](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5161e9a39a644288a46ff81f3889df58/download)
* [Attachment 3](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/617cecc163cb4ae2b0d343f0ed6ba2a6/download)
* [Attachment 4](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/70fe9671ddcf45dd941a795efef46793/download)

## Contacts

* Shawn Borisow

Email and phone are in the source notice.

[Source notice](https://sam.gov/workspace/contract/opp/80449fdd63044c7d83e485683f86d17d/view)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Steam Tunnel Ventilation Replacement","description":"SEE ATTACHMENTS FOR FULL PROJECT DETAILS Project: Construction Services/Steam Tunnel Ventilation System Replacement, NIST, Boulder, CO This acquisition is a 100% Small Business Set-Aside. The NAICS for this acquisition is 236220; the Small Business Size Standard is $45.0 Million. The purpose of this project is to replace the existing tunnel ventilation system with steam heating coils with (2) natural gas indirect fired make up air units (MAU’s). This construction effort will procure and deliver a complete, operational tunnel ventilation system, including removal of existing equipment, installation MAU’s, and all associated systems required for safe, reliable, and continuous ventilation system. Work will be planned and phased to be performed between the months of May 1 through October 31, mitigating the chances for pipes to freeze.","url":"https://matchawards.com/national_institute_of_standards_and_technology/posts/116766714528410485","identifier":"1333ND26RNB190032","category":"236220 - Commercial and Institutional Building Construction","availabilityStarts":"2026-07-29","availabilityEnds":"2026-08-05","areaServed":"Boulder, Colorado 80305, UNITED STATES","sameAs":"https://sam.gov/workspace/contract/opp/80449fdd63044c7d83e485683f86d17d/view"}
```

