<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/georgia_state_opportunities/posts/116850976799636818" -->

---
title: Terrell Street Resurfacing and Water Line Replacement | Closed - MatchAwards
description: Terrell Street Resurfacing and Water Line Replacement. Georgia State Opportunities. NAICS 237310 - Highway, Street, and Bridge Construction. Deadline 2026-07-21. Sealed proposals will be received by the City of Greenville, Georgia at the Greenville City Hall 101 North Depot Street, Greenville,...
canonical: https://matchawards.com/georgia_state_opportunities/posts/116850976799636818
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Terrell Street Resurfacing and Water Line Replacement | Closed
og:url: https://matchawards.com/georgia_state_opportunities/posts/116850976799636818
og:description: Terrell Street Resurfacing and Water Line Replacement. Georgia State Opportunities. NAICS 237310 - Highway, Street, and Bridge Construction. Deadline 2026-07-21. Sealed proposals will be received by the City of Greenville, Georgia at the Greenville City Hall 101 North Depot Street, Greenville,...
og:image: https://matchawards.com/system/accounts/avatars/000/091/022/original/f2a363db35b2b0db.jpg?1756328425
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Terrell Street Resurfacing and Water Line Replacement

Agency

Georgia State Opportunities

NAICS

237310 - Highway, Street, and Bridge Construction

Deadline

2026-07-21

Place of performance

Georgia, United States

## Description

Sealed proposals will be received by the City of Greenville, Georgia at the Greenville City Hall 101 North Depot Street, Greenville, Georgia 30222 until 3:00 p.m. local time, Tuesday, July 21s 2026 at which time and place they will be publicly opened and read. No submitted bid may be withdrawn after the scheduled closing time for receipt of bids for a period of sixty (60) days. The work to be done consists of furnishing all materials, equipment and labor for the construction of: Approximately 1,000 linear feet of pavement repair by full depth reclamation and installation of approximately 700 linear feet of 6-inch water line, all work complete with appurtenances, including traffic control, striping, and erosion control. Time allotted for construction is 90 consecutive calendar days for substantial completion and 120 days for final completion. Proposals for the complete work in one general contract shall be made on the proposal form provided and shall contain prices in words and figures for the work bid on. All proposals shall be accompanied by a Bid Bond drawn in favor of the City of Greenville, Georgia, in the amount of at least 5% of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the Attorney for the City of Greenville, Georgia. Each bond shall be equal to 100% of the contract amount. The Bid Bond shall be forfeited to the City of Greenville, Georgia as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within 10 days after being notified that he has been awarded the contract. Drawings and Specifications are open to public inspection at the office of the City of Greenville, Georgia and at the offices of Turnipseed Engineers in Atlanta and Augusta, Georgia. Plans and specifications must be obtained at https://turnipseed.com/current-proje 

[Source notice](https://ssl.doas.state.ga.us/gpr/eventDetails?eSourceNumber=PE-66980-NONST-2027-000000001&sourceSystemType=gpr20)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Terrell Street Resurfacing and Water Line Replacement","description":"Sealed proposals will be received by the City of Greenville, Georgia at the Greenville City Hall 101 North Depot Street, Greenville, Georgia 30222 until 3:00 p.m. local time, Tuesday, July 21s 2026 at which time and place they will be publicly opened and read. No submitted bid may be withdrawn after the scheduled closing time for receipt of bids for a period of sixty (60) days. The work to be done consists of furnishing all materials, equipment and labor for the construction of: Approximately 1,000 linear feet of pavement repair by full depth reclamation and installation of approximately 700 linear feet of 6-inch water line, all work complete with appurtenances, including traffic control, striping, and erosion control. Time allotted for construction is 90 consecutive calendar days for substantial completion and 120 days for final completion. Proposals for the complete work in one general contract shall be made on the proposal form provided and shall contain prices in words and figures for the work bid on. All proposals shall be accompanied by a Bid Bond drawn in favor of the City of Greenville, Georgia, in the amount of at least 5% of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the Attorney for the City of Greenville, Georgia. Each bond shall be equal to 100% of the contract amount. The Bid Bond shall be forfeited to the City of Greenville, Georgia as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within 10 days after being notified that he has been awarded the contract. Drawings and Specifications are open to public inspection at the office of the City of Greenville, Georgia and at the offices of Turnipseed Engineers in Atlanta and Augusta, Georgia. Plans and specifications must be obtained at https://turnipseed.com/current-proje","url":"https://matchawards.com/georgia_state_opportunities/posts/116850976799636818","category":"237310 - Highway, Street, and Bridge Construction","availabilityEnds":"2026-07-21T00:00:00.000Z","areaServed":"Georgia, United States","sameAs":"https://ssl.doas.state.ga.us/gpr/eventDetails?eSourceNumber=PE-66980-NONST-2027-000000001\u0026sourceSystemType=gpr20"}
```

