<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/federal_aviation_administration/posts/refurbish-repaint-antenna-towers" -->

---
title: Refurbish/Repaint Antenna Towers | Closed - MatchAwards
description: Refurbish/Repaint Antenna Towers. Federal Aviation Administration. Solicitation 697DCK-26-R-00351. NAICS 238320 - Painting and Wall Covering Contractors. Total small business set-aside. Deadline 2026-07-20. SCOPE OF WORK: 1. Surface preparation: i. Remove any visible oil, grease or salt...
canonical: https://matchawards.com/federal_aviation_administration/posts/116836082211958677
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Refurbish/Repaint Antenna Towers | Closed
og:url: https://matchawards.com/federal_aviation_administration/posts/116836082211958677
og:description: Refurbish/Repaint Antenna Towers. Federal Aviation Administration. Solicitation 697DCK-26-R-00351. NAICS 238320 - Painting and Wall Covering Contractors. Total small business set-aside. Deadline 2026-07-20. SCOPE OF WORK: 1. Surface preparation: i. Remove any visible oil, grease or salt...
og:image: https://matchawards.com/system/accounts/avatars/000/000/100/original/77308ddc9b319555.png?1639057525
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Refurbish/Repaint Antenna Towers

Status

Closed, the response deadline passed on Jul 20, 2026

Agency

[Federal Aviation Administration](/federal%5Faviation%5Fadministration)

Office

FORT WORTH, USA

Notice type

Solicitation

Solicitation number

697DCK-26-R-00351

NAICS

[238320 - Painting and Wall Covering Contractors](/groups/231)

PSC

Z1BG - MAINTENANCE OF ELECTRONIC AND COMMUNICATIONS FACILITIES

Category

[Facility Related Services (4.4)](/categories/facilities-and-construction/facility-related-services)

Set-aside

[Total Small Business Set-Aside (FAR 19.5)](/contracts/small-business)

Posted

2026-07-16

Deadline

2026-07-20

Place of performance

Shelton, Connecticut, UNITED STATES

## Description

**SCOPE OF WORK:**  
**1\. Surface preparation:**  
i. Remove any visible oil, grease or salt contaminants.  
  
ii. All steel surfaces must be prepared in accordance with SSPC-SP 2 (Hand Tool Cleaning), SSPC-SP 3 (Power  
Tool Cleaning) and SSPC-SP 11 (Power-Tool Cleaning to Bare Metal) Standards. SP11 must only take place when  
necessary. Following hand and power tool cleaning, all surfaces must be brushed, blown clean with compressed air  
or vacuumed to remove all dust, and debris before the application of any coating. The Contractor must prevent the  
migration of debris, paint chips and dust to adjacent properties. All debris must be collected at the end of each  
workday. No debris must be left on-site overnight, and the premises must be returned to a clean condition upon  
completion of work.  

<!-- mobian-agent-ad sponsored="true" id="f6a54058-90cc-42a6-9d7f-f6aefad62138" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/facility-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->

  
iii. Hazardous Materials Requirements: The FAA completed lead, heavy metal (chromium and cadmium) and  
polychlorinated biphenyl (PCB) sampling on the 75’ towers which were found to be detected. The contractor must  
review the attached sampling report to ensure awareness of the presence of hazardous materials and must ensure that  
all surface preparation work must comply with all local, state and federal requirements.  
  
1\. Summarized Results:

* Tower A: Detected lead-based paint, polychlorinated biphenyls, chromium and cadmium.
* Tower B: Detected lead-based paint, chromium and cadmium. PCBs were found to be not detected but Contractor must assume PCBs are present.
* Tower C: Detected lead-based paint, polychlorinated biphenyls, chromium and cadmium.
* Tower references are shown in a diagram in the last page of the sampling report.

a. Contractor must submit on a project specific Health and Safety Plan mitigating all hazard identified in the tower sampling report. All work must be completed in accordance with OSHA, EPA, SSPC/AMPP Standards and all other relevant standards. The Contractor must have a class 3P containment to prevent debris from spreading outside the worksite. See submittal section for all required submittals.  
b. All waste must be disposed according to Connecticut Department of Energy and Environmental Protection and EPA regulations and disposed at waste facilities that accept the associated hazardous materials.  
c. Contractor must provide a manifest in accordance with all federal, state and local standards.

  
2\. Spot Prime Coat: All bare steel surfaces must receive one spot prime coat of Tnemec Series 135 Chembuild epoxy, or approved equal, in color 1243 Metallic Aluminum at 4-6 mil Dry Film Thickness (DFT). Follow all manufacturer requirements.

  
3\. Full coat: Apply full coat of Tnemec Series 135 Chembuild epoxy, or approved equal, in color DC74 Off-White at 4-6 mil DFT on all exterior surfaces. Follow all manufacturer requirements.

  
4\. Full Finish Coat: Apply one full finish coat of Tnemec Series 1095 Endura-Shield polyurethane, or approved equal, at 2.5-3.5 mils DFT on all exterior surfaces. Follow all manufacturer requirements.

  
5\. The towers are equipped with a ladder and rail combination MSA dynaglide ladder safety system. The ladder safety system is hot dip galvanized, approximately 15 years old and in good condition. The contractor must only prepare and coat the ladder where it mounts to the tower. The Contractor must remove any paint that is mistakenly placed inside the fall arrestor channel, so it does not affect the performance of the system.

  
6\. Remove rust at the conduit threads at the base of each tower. Coat with above coating system.

  
7\. Measure thickness of coatings according to SSPC-PA 2\. Take 4 sets of 3 individual readings per tower for each coat. Provide to the FAA copies of these results.

  
8\. Apply new silane concrete sealer to existing exposed concrete foundation surfaces.

  
9\. At the base of each tower is a bare #6 ground, partially in rigid conduit, that is clamped to a tower leg with a washer and structural bolt. Remove the #6 and associated rigid conduit to 1.5’ below grade. Remove the existing bolt that was used to clamp the #6 and replace with an ASTM A325 bolted connection to include bolt, hardened washer, nut and palnut. Bolted connection must be  
hot dip galvanized. Contractor to verify dimensions on site.

  
10\. Contractor must install a new hot dip galvanized 1/4” thick A36 steel plate in the middle of the platform on each  
tower. Plate dimension is approximately 2.5’x2.5’. The purpose of the steel plate is to cover an existing hole in the  
platform where a piece of equipment was removed. Redrill the existing six 3/8” bolt holes to ½” and install new ASTM A325 bolted connection. Contractor must verify and review all dimensions with the FAA. Contractor must remove the existing 3 metal strips  
and six bolts that currently cover the platform opening.

  
11\. The Contractor must review the provided as builts to ensure construction operations do not impact any existing equipment. The Contractor must protect the underground communication cables that travel from each tower to the stub ups at the building from heavy equipment.

  
12\. The Contractor must be aware and plan for project phasing requirements that are listed below in the SOW.

  
13\. **Potential Additional Work (Contract Option #1):** The Contractor must provide separate line-item pricing as part of their base bid proposal to coat the 200’ hot dip galvanized steel lattice tower. Based on funding, this option may or may not be added to the contract.

## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/051026ecb96845339b3d1ed1d87573c0/download)
* [Attachment 2](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/115d9e8e1ca24835891b80ea5e5ef7fa/download)
* [Attachment 3](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/32022f79ba93436983b3417acb633b4f/download)
* [Attachment 4](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/47912cfb782f4804b2b8b2ce0d4e94e7/download)
* [Attachment 5](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e598e64526224a1fa15fd18570bdcfc9/download)

## Contacts

* Ms. Joni Haynes

Email and phone are in the source notice.

[Source notice](https://sam.gov/workspace/contract/opp/03ea0add4651447da9bae08c8ed6ea58/view)

[More from Federal Aviation Administration posted in June 2026](/federal%5Faviation%5Fadministration/archive/2026-06)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Small Business Set-Aside Government Contracts Available Now](/contracts/small-business)
* [Construction Government Contracts Available Now](/contracts/construction)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Refurbish/Repaint Antenna Towers","description":"SCOPE OF WORK: 1. Surface preparation: i. Remove any visible oil, grease or salt contaminants. ii. All steel surfaces must be prepared in accordance with SSPC-SP 2 (Hand Tool Cleaning), SSPC-SP 3 (Power Tool Cleaning) and SSPC-SP 11 (Power-Tool Cleaning to Bare Metal) Standards. SP11 must only take place when necessary. Following hand and power tool cleaning, all surfaces must be brushed, blown clean with compressed air or vacuumed to remove all dust, and debris before the application of any coating. The Contractor must prevent the migration of debris, paint chips and dust to adjacent properties. All debris must be collected at the end of each workday. No debris must be left on-site overnight, and the premises must be returned to a clean condition upon completion of work. iii. Hazardous Materials Requirements: The FAA completed lead, heavy metal (chromium and cadmium) and polychlorinated biphenyl (PCB) sampling on the 75’ towers which were found to be detected. The contractor must review the attached sampling report to ensure awareness of the presence of hazardous materials and must ensure that all surface preparation work must comply with all local, state and federal requirements. 1. Summarized Results: Tower A: Detected lead-based paint, polychlorinated biphenyls, chromium and cadmium. Tower B: Detected lead-based paint, chromium and cadmium. PCBs were found to be not detected but Contractor must assume PCBs are present. Tower C: Detected lead-based paint, polychlorinated biphenyls, chromium and cadmium. Tower references are shown in a diagram in the last page of the sampling report. a. Contractor must submit on a project specific Health and Safety Plan mitigating all hazard identified in the tower sampling report. All work must be completed in accordance with OSHA, EPA, SSPC/AMPP Standards and all other relevant standards. The Contractor must have a class 3P containment to prevent debris from spreading outside the worksite. See submittal section for all required submittals. b. All waste must be disposed according to Connecticut Department of Energy and Environmental Protection and EPA regulations and disposed at waste facilities that accept the associated hazardous materials. c. Contractor must provide a manifest in accordance with all federal, state and local standards. 2. Spot Prime Coat: All bare steel surfaces must receive one spot prime coat of Tnemec Series 135 Chembuild epoxy, or approved equal, in color 1243 Metallic Aluminum at 4-6 mil Dry Film Thickness (DFT). Follow all manufacturer requirements. 3. Full coat: Apply full coat of Tnemec Series 135 Chembuild epoxy, or approved equal, in color DC74 Off-White at 4-6 mil DFT on all exterior surfaces. Follow all manufacturer requirements. 4. Full Finish Coat: Apply one full finish coat of Tnemec Series 1095 Endura-Shield polyurethane, or approved equal, at 2.5-3.5 mils DFT on all exterior surfaces. Follow all manufacturer requirements. 5. The towers are equipped with a ladder and rail combination MSA dynaglide ladder safety system. The ladder safety system is hot dip galvanized, approximately 15 years old and in good condition. The contractor must only prepare and coat the ladder where it mounts to the tower. The Contractor must remove any paint that is mistakenly placed inside the fall arrestor channel, so it does not affect the performance of the system. 6. Remove rust at the conduit threads at the base of each tower. Coat with above coating system. 7. Measure thickness of coatings according to SSPC-PA 2. Take 4 sets of 3 individual readings per tower for each coat. Provide to the FAA copies of these results. 8. Apply new silane concrete sealer to existing exposed concrete foundation surfaces. 9. At the base of each tower is a bare #6 ground, partially in rigid conduit, that is clamped to a tower leg with a washer and structural bolt. Remove the #6 and associated rigid conduit to 1.5’ below grade. Remove the existing bolt that was used to clamp the #6 and replace with an ASTM A325 bolted connection to include bolt, hardened washer, nut and palnut. Bolted connection must be hot dip galvanized. Contractor to verify dimensions on site. 10. Contractor must install a new hot dip galvanized 1/4” thick A36 steel plate in the middle of the platform on each tower. Plate dimension is approximately 2.5’x2.5’. The purpose of the steel plate is to cover an existing hole in the platform where a piece of equipment was removed. Redrill the existing six 3/8” bolt holes to ½” and install new ASTM A325 bolted connection. Contractor must verify and review all dimensions with the FAA. Contractor must remove the existing 3 metal strips and six bolts that currently cover the platform opening. 11. The Contractor must review the provided as builts to ensure construction operations do not impact any existing equipment. The Contractor must protect the underground communication cables that travel from each tower to the stub ups at the building from heavy equipment. 12....","url":"https://matchawards.com/federal_aviation_administration/posts/116836082211958677","identifier":"697DCK-26-R-00351","category":"238320 - Painting and Wall Covering Contractors","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"Z1BG - MAINTENANCE OF ELECTRONIC AND COMMUNICATIONS FACILITIES"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.4 Facility Related Services","url":"https://matchawards.com/categories/facilities-and-construction/facility-related-services"}],"availabilityStarts":"2026-07-16","availabilityEnds":"2026-07-20","validThrough":"2026-07-20T23:59:59-04:00","areaServed":"Shelton, Connecticut, UNITED STATES","sameAs":"https://sam.gov/workspace/contract/opp/03ea0add4651447da9bae08c8ed6ea58/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Small business","item":"https://matchawards.com/contracts/small-business"}]}
```

