title: Shipyard Infrastructure Optimization Program Multi-Mission Dry… | Due Dec 1, 2026 - MatchAwards
description: Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract. United States Department of the Navy. Solicitation N4425526R0005. NAICS 236220 - Commercial and Institutional Building Construction. Deadline 2026-12-01. Title: Shipyard Infrastructure...
canonical: https://matchawards.com/dept_of_the_navy/posts/116756804315013194
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Shipyard Infrastructure Optimization Program Multi-Mission Dry… | Due Dec 1, 2026
og:url: https://matchawards.com/dept_of_the_navy/posts/116756804315013194
og:description: Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract. United States Department of the Navy. Solicitation N4425526R0005. NAICS 236220 - Commercial and Institutional Building Construction. Deadline 2026-12-01. Title: Shipyard Infrastructure...
og:image: https://matchawards.com/system/accounts/avatars/000/000/085/original/a0262fe00d6c038b.png?1638992122
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract 

Status

Open, responses due Dec 1, 2026

Agency

[United States Department of the Navy](/dept%5Fof%5Fthe%5Fnavy)

Office

SILVERDALE, USA

Notice type

Solicitation

Solicitation number

N4425526R0005

NAICS

[236220 - Commercial and Institutional Building Construction](/groups/212)

PSC

Y1ED - CONSTRUCTION OF SHIP CONSTRUCTION AND REPAIR FACILITIES

Category

[Construction Related Services (4.2)](/categories/facilities-and-construction/construction-related-services)

Posted

2026-11-19

Deadline

2026-12-01

Place of performance

98314

## Description

**Title: Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract** 

**Type:** Preliminary Pre-Solicitation Notice

**Location:** Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF), Pearl Harbor Naval Shipyard (PHNSY & IMF), and other areas under the cognizance of Naval Facilities Engineering Systems Command (NAVFAC).

<!-- mobian-agent-ad sponsored="true" id="d718ad18-b86a-4663-9c95-4bf489c4159d" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/construction-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


The Navy intends to issue an indefinite delivery indefinite quantity (IDIQ) multiple award construction contract (MACC) request for proposal (RFP) in September 2026.

**Period of Performance/Maximum Value:** The period of performance will be a base period of 60 months and up to five 12-month option periods for a maximum possible duration of ten (10) years; or an aggregate maximum estimated value of $30 billion for all task orders, whichever occurs first.

**Contract Type:** The Navy intends task orders issued for construction projects to be firm-fixed-price (FFP) in accordance with 10 U.S.C. 3323 and DFARS 216.301-3\. Where authorized cost reimbursement task orders may be issued to allow the Government the maximum flexibility in determining the best contract type for the specific task order after consideration of the risks to the Government and contractors.

**Task Order Range:** The typical size of major construction task orders will range from $2,000,000,000 to $6,000,000,000\. However, smaller task orders may be issued to support smaller efforts like Early Contractor Involvement (ECI) and/or Alternative Technical Concepts (ATC). The Navy anticipates that most work under the MACC will be initiated by task order(s) that are competed amongst all the MACC holders. Additionally, all MACC holders may be issued task orders for the same scope of work for ECI and/or ATC. And where justified, task order award may be issued to a single MACC holder. The Navy makes no representation as to the number of task orders or actual amount of work to be ordered; however, each MACC holder will receive a minimum guarantee of $2,000,000\. To qualify for this MACC, Offerors will need to demonstrate single project bonding capacity of $2,000,000,000\. 

The anticipated acquisition timeline includes:

1. Industry Day: August 2026
2. Issue MACC Solicitation: September 2026
3. MACC Phase I proposals due: October 2026
4. MACC Phase II proposals due: January 2027
5. MACC Award: May 2027
6. Issue Alternative Technical Concept (ATC) Task Order: June 2027
7. ATC due: October 2027
8. RFP Task Order Marine Package #1: November 2027
9. Planned task order award of Marine Package #1: June 2028

**Purpose and Scope:** 

The solicitation may result in the award of approximately five (5) multiple award construction contracts; however, if determined to be in the best interest of the Government, fewer than five (5) contracts may be awarded.

The purpose of the MACC is to support waterfront and marine mega-construction projects supporting the shipyard infrastructure optimization program (SIOP) and specifically construction of the new Multi-Mission Dry Dock.

This MACC will encompass a wide range of Design Build (DB) and Design Bid Build (DBB) type projects. The focus of this MACC will be the construction of a new proposed Multi-Mission Dry Dock at PSNS & IMF, located at Naval Base Kitsap (NBK) Bremerton, Washington. The Multi-Mission Dry Dock preferred location is within the existing Dry Dock 3 footprint, existing Pier 6, and existing Pier 7; and will include dry dock drainage, dewatering, and flooding systems; a caisson and caisson gate; roadways and rail networks; portal crane track; access and egress elements; mechanical, electrical, and communications systems; and utility routing tunnels. The proposed project also includes demolition of facilities and utilities.

The Multi-Mission Dry Dock is a fully pressure-relieved dry dock capable of accommodating shipyard repair services for the newest Ford-class aircraft carrier, Nimitz-class carriers, and other surface and subsurface ships served by PSNS & IMF.

Dredging south of Multi-Mission Dry Dock is proposed for the Double-Wall Cofferdams, which provides means to support construction of Multi-Mission Dry Dock in the dry, and provides hydraulic cutoff in the permanent condition. The bath symmetry in Sinclair Inlet provides adequate water depths to support the drafts of the respective design vessels at berth and during docking/undocking evolutions.

Site access is anticipated to be a combination of a temporary fixed pier southeast of existing Building 460, a contractor access road at Bremerton Gate, existing Piers 6 & 7, Dry Dock 3, and the South Gate vehicle inspection building. Prior to establishing the above-described entry points the Navy plans to install a temporary Controlled Industrial Area (CIA) fence that will encompass the project site. 

For more information on the proposed Multi-Mission Dry Dock project see:

 https://bremertonwaterfrontimprovementseis.com/

 https://multimissiondrydock.com/ 

It is anticipated the construction project will be contracted via individual task order packages that may include the following:

Task Order Package #1 – Marine (est. $2-3B)

* Pier, Building, Upland Utility Demo
* Dredging
* Construction of upland shoring and cutoff wall
* Construction of double-wall cofferdam
* Upland ground Improvements

Task Order Package #2 – Dry Dock (est. $3.5-4.5B)

* Construction dewatering
* Installation of upland shoring wall tie-backs
* Dry Dock 3 demolitation
* Upland excavation
* Construction of pressure relief system
* Construction of dry dock including entrance and quay walls
* Pumpwell installations

Task Order Package #3 – Infrastructure (est $3.5-4.5B)

* Support buildings
* Electrical substations
* Utility tunnels
* Partial Farragut Avenue tunnel replacement
* Procure and install process equipment
* Installation of permanent upland utilities
* Paving and crane rail installation
* Fabrication and installation of fendering system
* Temporary double-wall cofferdam demolition
* Caisson installation
* Testing and Commissioning

Task Order Package #4 – Caisson (est. $200-$300M)

* Fabrication and delivery of caisson

**Potential Risk Mitigations:** The Navy is considering the risk mitigation measures including:

* Early Contractor Involvement (ECI)
* Limiting task order performance bonds to a maximum of $2 billion
* Economic Price Adjustment (EPA)
* Award Fee Incentive
* Reduced small business subcontracting goals

**Competition Description:** This notice does NOT constitute a request for proposal (RFP), request for quote (RFQ), or invitation for bid (IFB). As a method for conducting market research, a sources sought for this requirement will be issued on SAM.gov approximately 25 June 2026.

The Navy will be establishing a website to provide additional information and education on varying related topics.

**Contracting POC:** Jodus Hortin, jodus.d.hortin.civ@us.navy.mil

**Secondary POC:** Nancy Coffee, nancy.m.coffee.civ@us.navy.mil

## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/24502d436453445dbf958ff38133b424/download)

## Contacts

* Jodus Hortin
* Nancy Coffee

Email and phone are in the source notice.

[Source notice](https://sam.gov/workspace/contract/opp/71528b9c0a8a4da9ae4585718a666cd0/view)

[More from United States Department of the Navy posted in June 2026](/dept%5Fof%5Fthe%5Fnavy/archive/2026-06)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Construction Government Contracts Available Now](/contracts/construction)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract  ","description":"Title: Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract Type: Preliminary Pre-Solicitation Notice Location: Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS \u0026 IMF), Pearl Harbor Naval Shipyard (PHNSY \u0026 IMF), and other areas under the cognizance of Naval Facilities Engineering Systems Command (NAVFAC). The Navy intends to issue an indefinite delivery indefinite quantity (IDIQ) multiple award construction contract (MACC) request for proposal (RFP) in September 2026. Period of Performance/Maximum Value: The period of performance will be a base period of 60 months and up to five 12-month option periods for a maximum possible duration of ten (10) years; or an aggregate maximum estimated value of $30 billion for all task orders, whichever occurs first. Contract Type: The Navy intends task orders issued for construction projects to be firm-fixed-price (FFP) in accordance with 10 U.S.C. 3323 and DFARS 216.301-3. Where authorized cost reimbursement task orders may be issued to allow the Government the maximum flexibility in determining the best contract type for the specific task order after consideration of the risks to the Government and contractors. Task Order Range: The typical size of major construction task orders will range from $2,000,000,000 to $6,000,000,000. However, smaller task orders may be issued to support smaller efforts like Early Contractor Involvement (ECI) and/or Alternative Technical Concepts (ATC). The Navy anticipates that most work under the MACC will be initiated by task order(s) that are competed amongst all the MACC holders. Additionally, all MACC holders may be issued task orders for the same scope of work for ECI and/or ATC. And where justified, task order award may be issued to a single MACC holder. The Navy makes no representation as to the number of task orders or actual amount of work to be ordered; however, each MACC holder will receive a minimum guarantee of $2,000,000. To qualify for this MACC, Offerors will need to demonstrate single project bonding capacity of $2,000,000,000. The anticipated acquisition timeline includes: Industry Day: August 2026 Issue MACC Solicitation: September 2026 MACC Phase I proposals due: October 2026 MACC Phase II proposals due: January 2027 MACC Award: May 2027 Issue Alternative Technical Concept (ATC) Task Order: June 2027 ATC due: October 2027 RFP Task Order Marine Package #1: November 2027 Planned task order award of Marine Package #1: June 2028 Purpose and Scope: The solicitation may result in the award of approximately five (5) multiple award construction contracts; however, if determined to be in the best interest of the Government, fewer than five (5) contracts may be awarded. The purpose of the MACC is to support waterfront and marine mega-construction projects supporting the shipyard infrastructure optimization program (SIOP) and specifically construction of the new Multi-Mission Dry Dock. This MACC will encompass a wide range of Design Build (DB) and Design Bid Build (DBB) type projects. The focus of this MACC will be the construction of a new proposed Multi-Mission Dry Dock at PSNS \u0026 IMF, located at Naval Base Kitsap (NBK) Bremerton, Washington. The Multi-Mission Dry Dock preferred location is within the existing Dry Dock 3 footprint, existing Pier 6, and existing Pier 7; and will include dry dock drainage, dewatering, and flooding systems; a caisson and caisson gate; roadways and rail networks; portal crane track; access and egress elements; mechanical, electrical, and communications systems; and utility routing tunnels. The proposed project also includes demolition of facilities and utilities. The Multi-Mission Dry Dock is a fully pressure-relieved dry dock capable of accommodating shipyard repair services for the newest Ford-class aircraft carrier, Nimitz-class carriers, and other surface and subsurface ships served by PSNS \u0026 IMF. Dredging south of Multi-Mission Dry Dock is proposed for the Double-Wall Cofferdams, which provides means to support construction of Multi-Mission Dry Dock in the dry, and provides hydraulic cutoff in the permanent condition. The bath symmetry in Sinclair Inlet provides adequate water depths to support the drafts of the respective design vessels at berth and during docking/undocking evolutions. Site access is anticipated to be a combination of a temporary fixed pier southeast of existing Building 460, a contractor access road at Bremerton Gate, existing Piers 6 \u0026 7, Dry Dock 3, and the South Gate vehicle inspection building. Prior to establishing the above-described entry points the Navy plans to install a temporary Controlled Industrial Area (CIA) fence that will encompass the project site. For more information on the proposed Multi-Mission Dry Dock project see: https://bremertonwaterfrontimprovementseis.com/ https://multimissiondrydock.com/ It is anticipated the construction project will be contracted via individual task order...","url":"https://matchawards.com/dept_of_the_navy/posts/116756804315013194","identifier":"N4425526R0005","category":"236220 - Commercial and Institutional Building Construction","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Open"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"Y1ED - CONSTRUCTION OF SHIP CONSTRUCTION AND REPAIR FACILITIES"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.2 Construction Related Services","url":"https://matchawards.com/categories/facilities-and-construction/construction-related-services"}],"availabilityStarts":"2026-11-19","availabilityEnds":"2026-12-01","validThrough":"2026-12-01T23:59:59-05:00","areaServed":"98314","sameAs":"https://sam.gov/workspace/contract/opp/71528b9c0a8a4da9ae4585718a666cd0/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Construction","item":"https://matchawards.com/contracts/construction"}]}
```