CHLORINATOR, ECG
- Status
- Closed, the response deadline passed on Feb 25, 2026
- Agency
- United States Department of the Navy
- Office
- MECHANICSBURG, USA
- Notice type
- Solicitation
- Solicitation number
- N0010426QFB17
- NAICS
- 333998 - All Other Miscellaneous General Purpose Machinery Manufacturing
- PSC
- 3655 - GAS GENERATING AND DISPENSING SYSTEMS, FIXED OR MOBILE
- Category
- Machinery & Components (5.1)
- Posted
- 2026-01-16
- Deadline
- 2026-02-25
Description
CONTACT INFORMATION|4|N743.30|N/A|717-605-2379|SCOTT.R.YOUNGBLOOD2.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|ee specification sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report- Certifications Combo- Receiving Report & Invoice- Material|N/A|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material |N50286|TBD|133.6|N/A|N/A|N39040 - Certifications |N/A|N/A |SEE DD FORM 1423 |PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery|one year from date of delivery||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|33398|700|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||| 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.2 ;ECG Refurbish kit, NSN 1H 3655-01-633-0242 will be supplied to HAMILTON SUNDSTRAND CORP.; 1.3 ;ECG Refurbish kit, NSN 1H 3655-01-633-0242 will be supplied to HAMILTON SUNDSTRAND CORP.; 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Identification of Classified Documents - This contract/purchase order requires the Contractor to have authorized access to classified documents in accordance with the attached Contract Security Classification Specification (DD Form 254). The classified documents and security level are: ;EB-3204 - CONFIDENTIAL; 2.3 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.3.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.3.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.3.3 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;SV799150 73030 V B SV799119 73030 N B SV799133 73030 P B SV799124 73030 H B SV799128 73030 E B SV799129 73030 K B SV799130 73030 H B SV799125 73030 J B SV799127 73030 N B SVS799124 73030 F B SVS799125 73030 F B SVS799127 73030 F B SVS799128 73030 G B SVS799129 73030 G B SVS799130 73030 H B SVHS13255 73030 C B; 2.3.4 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=EB-3204 |96169| -|SP |D|0001 | -|00026|0000000 DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-B150 | | | |190401|A| | | DOCUMENT REF DATA=ASTM-B348 | | | |211101|A| | | DOCUMENT REF DATA=ASTM-B381 | | | |130701|A| | | DOCUMENT REF DATA=ASTM-B446 | | | |190401|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=SAE AMS 2380 | | |F |080401|A| | | DOCUMENT REF DATA=SAE AMS 2643 | | |C |020101|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=MIL-DTL-15024 | | |G |180303|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-24231 | | |E |130426|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=A-A-59004 | | |B |081118|A| | | DOCUMENT REF DATA=SAE AMS-STD-2154 | | |D |200401|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 REFURBISHED MATERIAL STATEMENT OF WORK (REPAIR SOW) - 3.1.1 INSPECTION - Clean and determine if refurbishment is possible. At disassembly, the Contractor must record all identifying markings found on the parts of each assembly. The Contractor must maintain traceability of these markingsto each unit throughout refurbishment. 3.1.2 RE-USEABLE PARTS - Any parts of the original assembly that are useable (replacement is not necessary), may be utilized as initially supplied. 3.1.3 NON-USEABLE PARTS - Any parts of the original assembly that are not usable (replacement is necessary) must be in accordance with this TDP (Technical Data Package). 3.1.4 REFURBISHMENT - Upon completion of inspection, this item must be refurbished to be in accordance with ;Hamilton Standard Drawing SV799150; , except as amplified or modified herein. This applies to all "Parts Requiring Certification" as identified elsewhere in this Contract/Purchase Order. 3.1.5 Additional SOW Requirements - ;N/A; 3.2 ;The primer called out in Hamilton Standard drawings SV799125 and SV799127 drawing note 4 must be Loctite Primer N or equal. Primers containing Methanol may not be used.; 3.3 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Receptacle Bodies for Part Numbers SV799119-1 and SV799119-2; Material - ;ASTM B446, Alloy UNS N06625, Grade 1 and meeting the requirements of Note 9 of Drawing SV799119; Part - ;Locknuts and Spacers for Part Numbers SV799119-1 and SV799119-2; Material - ;ASTM B150, UNS C63200; Part - ;Receptacle Body for Part Number SV799133-1; Material - ;ASTM B446, Alloy UNS N06625, Grade 1 and meeting the requirements of Note 9 of Drawing SV799133; Part - ;Locknut and Spacer for Part Number SV799133-1; Material - ;ASTM B150, UNS C63200; Part - ;Anode, Find 2 on Drawing SV799129; Material - ;ASTM-B348, Grade 2, Annealed and meeting the requirements of Notes 3 and 5 of Drawing SVS799129; ;Chemical and mechanical certification is not required for the Anode, Find 2 on Drawing SV799129, when supplied as Government furnished material.; Part - ;Generator Cover, Find 7 on Drawing SV799150; Material - ;ASTM-B348, Grade 2, Annealed and meeting the requirements of Notes 3 and 5 of Drawing SVS799128; Part - ;Cathode, Find 2 on Drawing SV799130; Material - ;ASTM-B348, Grade 2, Annealed and meeting the requirements of Notes 3 and 5 of Drawing SVS799130; Part - ;Base, Find 2 on Drawing SV799127; Material - ;ASTM-B381, Grade F2, Annealed and meeting the requirements of Notes 4 and 6 of Drawing SVS799127; Part - ;Cover, Find 2 on Drawing SV799124; Material - ;ASTM B381, Grade F2, Annealed and meeting the requirements of Notes 4 and 6 of Drawing SVS799124; Part - ;Containment Vessel Body, Find 2 on Drawing SV799125; Material - ;ASTM B381, Grade F2, Annealed and meeting the requirements of Notes 3 and 5 of Drawing SVS799125; Part - ;Stud, Find 3 on Drawing SV799127; Stud, Find 3 on Drawing SV799125; Hex Head Bolts, Find 43 and Find 47 on Drawing SV799150; and Hex Nuts, Find 42 and Find 45 on Drawing SV799150; Material - ;ASTM-B446, Grade 1; 3.4 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Test - Non-Destructive Tests Item - ;Weld Repair and/or Production Weld (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification Test - ;Hydrostatic Test; Item - ;Receptacle and Cable-Power, Finds 51 and 61 on Drawing SV799150; Performance - ;Notes 18 and 23 on Drawing SV799119; Acceptance - ;Notes 18 and 23 on Drawing SV799119; Test - ;Hydrostatic Test; Item - ;Receptacle and Cable-Liquid Sensor, Find 62 on Drawing SV799150; Performance - ;Notes 18 and 23 on Drawing SV799133; Acceptance - ;Notes 18 and 23 on Drawing SV799133; Test - ;Dielectric-Strength Test; Item - ;Receptacle and Cable-Power, Find 51 and Find 61 on Drawing SV799150; Performance - ;Note 24 on Drawing SV799119; Acceptance - ;Note 24 on Drawing SV799119; Test - ;Dielectric-Strength Test; Item - ;Receptacle and Cable-Liquid Sensor, Find 62 on Drawing SV799150; Performance - ;Note 24 on Drawing SV799133; Acceptance - ;Note 24 on Drawing SV799133; Test - ;Non-Destructive Bonding Test; Item - ;Receptacle and Cable-Power, Find 51 and Find 61 and Receptacle and Cable-Liquid Sensor, Find 62 on Drawing SV799150; Performance - ;Figure 1 of MIL-DTL-24231; Acceptance - ;Figure 1 of MIL-DTL-24231; Test - ;100% Ultrasonic Inspection; Item - ;Starting material for Anode, Find 2 on Drawing SV799129; Generator Cover, Find 7 on Drawing SV799150; Cathode, Find 2 on Drawing SV799130; Base, Find 2 on Drawing SV799127; Cover, Find 2 on Drawing SV799124; and Containment Vessel Body, Find 2 on Drawing SV799125; Performance - ;T9074-AS-GIB-010/271, except that zone testing, front half, with one half material plus .500 inch standard must be allowed; Acceptance - ;SAE AMS-STD-2154, Table 6, Class A; ;Ultrasonic Inspection is not required for the Anode, Find 2 on Drawing SV799129, when supplied as Government furnished material.; Test - ;Macrostructure Inspection; Item - ;Starting material for Anode, Find 2 on Drawing SV799129; Generator Cover, Find 7 on Drawing SV799150; Cathode, Find 2 on Drawing SV799130; Base, Find 2 on Drawing SV799127; Cover, Find 2 on Drawing SV799124; and Containment Vessel Body, Find 2 on Drawing SV799125; Performance - ;SAE-AMS-2643; Acceptance - ;SAE-AMS-2380, and the macro-grain structure must be equal to or better than level 30; ;Macrostructure Inspection is not required for the Anode, Find 2 on Drawing SV799129, when supplied as Government furnished material.; Test - ;Liquid Penetrant Inspection; Item - ;Stud, Find 3 on Drawing SV799127; Stud; Find 3 on Drawing SV799125; Hex Head Bolts, Find 43 and Find 47 on Drawing SV799150; and Hex Nuts, Find 42 and Find 45 on Drawing SV799150; Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222 Acceptance - MIL-DTL-1222 Test - ;100% Dye Penetrant Inspection; Item - ;Receptacle Bodies for Part Numbers SV799119-1, SV799119-2, and SV799133-1; Anode, Find 2 on Drawing SV799129; Generator Cover, Find 7 on Drawing SV799150; Cathode, Find 2 on Drawing SV799130; Base, Find 2 on Drawing SV799127; Cover, Find 2 on Drawing SV7991 24; Containment Vessel Body, Find 2 on Drawing SV799125; Performance - ;T9074-AS-GIB-010/271; Acceptance - ;MIL-STD-2035; Test - ;Hydrostatic Test; Item - ;Each Assembly; Performance - ;Paragraph 4.1 and 4.4 of Specification SVHS13255; Acceptance - ;Paragraph 4.1 and 4.4 of Specification SVHS13255; Test - ;Leak Test; Item - ;Each Assembly; Performance - ;Paragraph 4.2 and 4.5 of Specification SVHS13255; Acceptance - ;Paragraph 4.2 and 4.5 of Specification SVHS13255; 3.5 ;Contactor must perform a low pressure flow test on each assembly to verify that there are no flow path obstructions.; 3.6 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.7 Confidential Hydrostatic Test Pressures - When test pressures are confidential, certification must reference ;SVHS13255 Rev C (EB-3204 Rev -); and the item number to which the item was tested in lieu of the actual pressures. Any drawing requirement to mark the working pressure on the item does not apply and is strictly prohibited. 3.8 Thread Lubricant - Thread lubricants containing molybdenum disulfide must not be used on this material. Bacteria in water, especially seawater, causes molybdenum disulfide to break down. The by-products of the breakdown form compounds which attack the fasteners. Anti-galling compound A-A-59004 must be used as a replacement when thread lubricant is required for assembly. 3.9 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria. The GAC document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/ 3.10 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.10.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.10.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.10.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.11 Thread Forming - The following provides the official interpretation of paragraph 4.5.2.7 of MIL-DTL-1222. 3.11.1 In order to qualify for "Alternate Mechanical Testing" found in MIL-DTL-1222J paragraph 4.5.2.7 and utilize the mechanical properties for the starting bar stock in lieu of performing yield strength or proof stress testing on finished fasteners, all of the subsequent provisions found in MIL-DTL-1222J paragraphs 4.5.2.7 a through e must be met. If any single provision is not met, all required mechanical testing must be performed on the finished full sized fasteners. These provisions are explained as follows: a. Proper product lot control and traceability must be in place. b. No heat treatmMore from United States Department of the Navy posted in January 2026