ClickCease HEAD,FLUID FILTER (N0010426QZA31) | Closed - MatchAwards

HEAD,FLUID FILTER

Status
Closed, the response deadline passed on Dec 29, 2025
Agency
United States Department of the Navy
Office
MECHANICSBURG, USA
Notice type
Solicitation
Solicitation number
N0010426QZA31
NAICS
333998 - All Other Miscellaneous General Purpose Machinery Manufacturing
PSC
4330 - CENTRIFUGALS, SEPARATORS, AND PRESSURE AND VACUUM FILTERS
Category
Machinery & Components (5.1)
Posted
2025-12-03
Deadline
2025-12-29

Description

CONTACT INFORMATION|4|N742.7|WVE|771-229-0420|jeffrey.a.dietrich5.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See sections C and E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION/ACCEPTANCE POINT|6|TBD|TBD|||TBD|TBD| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material|NA|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material;|N50286|TBD|133.2|NA|NA|N39040 - Certifications|NA|NA|See DD 1423|-| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS Mechanicsburg| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery|one year from date of delivery||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|||||||||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|333998|700|x|x|||||x||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| 1. The resultant award of this solicitation will be issued bilaterally,requiring the contractor's written acceptance prior to execution. 2. This requirement requires the mandatory use of Additive Manufacturing for specific piece part components as outline within the technical data package for this end item. As such, the vendor shall conform to all specifications of meeting both the piece part conformance and the total end item specifications material, marking, testing and acceptance requirements. 3. Any contract/order awarded as a result of this solicitation will be a "DO"rated order certified for national defense use under the Defense Priorities andAllocations System (DPAS). See clause FAR 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use. 4. As referenced on Technical Data Package paragraph 2.2.2, the following drawing number revisions are approved for use on this requirement: DRAWING NO CAGE REV DISTR CD 601491 25204 K B 204452 25204 F B 5. The following proposed delivery schedule applies: SUBMISSION OF ALL CERTIFICATION DATA CDRLs 20 DAYS PRIOR TO DELIVERY. PNSY REVIEW/ACCEPTANCE OF CERTIFICATION CDRLs 18 WORKING DAYS AFTER RECEIPT FINAL DELIVERY OF MATERIAL (450 days) 6. DD1423 Data Item A001 may be waived if already on file at NAVSUP WSS Mechanicsburg. 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;601491 25204 K B 204452 25204 F B; 2.2.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DOCUMENT REF DATA=802-8979760 | | | |240229|A| | | DOCUMENT REF DATA=802-8999910 | | | |241003|A| | | DOCUMENT REF DATA=FED-STD-H28 | | |B |190224|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |230223|A| |01| DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-21562 | | |F |241126|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | DOCUMENT REF DATA=S9074-A4-GIB-010/AM-WIRE-DED | | |1 |240708|A| | | 3. REQUIREMENTS 3.1 ;Closure, Machining must be in accordance with Admiral Filter Company Drawing 601491 item 1, except as amplified or modified herein.; 3.2 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Closure, Machining; Material - ;PPD 802-8979760 Class 1 Grade B, MIL-DTL-21562, MIL-EN67 CuNi; ;Interpass temperatures shall be controlled per the limits of Table 3-4 of S9074-A4-GIB-010/AM-WIRE-DED for S-34 material.; ;For PPD 802-8979760 Grade B material, the Contractor must submit the applicable Additive Manufacturing manufacturer or industry standard(s) intended to determine material compliance, and a record of approval from the appropriate Technical Authority or authorized representative thereof, to the NAVSUP WSS Contracting Officer for approval prior to production. See CDRL DI-MISC-80678 (AM STD).; ;PPD 802-8979760 paragraph 3.2.1 is clarified as follows: feedstock lots from separate heats shall not be used in the same manufacturing lot.; ;Replace paragraph 3.4 of PPD 802-8979760 with the following: 3.4 Heat treatment. Material shall be heat treated at 1200�25 �F for 1 hour per inch of thickness up to a maximum of 5 hours. For material less than 1 inch thick, the material shall be heat treated for a minimum of 30 minutes. Material shall be furnace cooled to 500 �F, then air cooled to room temperature. Heat treatment shall be in accordance with MIL-STD-1684.Note: The section thickness is the minimum dimension of the heaviest section of the material determined by the diameter of an inscribed sphere.; ;Build requirements must be IAW NAVSEA Tech Man AM-WIRE DED (Table 3-2). A sacrificial build platform per PPD 802-8979760 para 3.2.3 is mandatory, however, quantitative chemical and mechanical analysis certifications are not required for the build platform.; ;A duplicate set of prepared test specimens from the same manufacturing lot of printed material per PPD 802-8979760 paragraph 4.4 - 4.6, which are identified to show the lot from which they were drawn, must be provided at the same time of shipment for Level 1 Receipt Inspection testing and acceptance.; ;In addition to all markings required by drawing(s) and/or specifications, and the traceability markings specified elsewhere herein, each additively manufactured component must be marked with "AM-DED". Marking must be permanently applied in accordance with MIL-STD-792, must be legible and located as to not affect the form, fit or function of the material as specified elsewhere herein.; 3.3 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Test - ;Volumetric Test via Ultrasonic Inspection; Item - ;Each Additively Manufactured Part; Performance - ;T9074-AS-GIB-010/271; Acceptance - ;Per CSD708; Test - ;Visual Inspection; Item - ;Each Additively Manufactured Part; Performance - ;T9074-AS-GIB-010/271; Acceptance - ;Per CSD708; Test - Quality Conformance/Compliance Inspection Item - ;Each Additively Manufactured Part; Performance - ;Per Table III of PPD 802-8979760 Para 4.2; Acceptance - ;Per Table III of PPD 802-8979760 Para 4.2; ;NOTE: Table III Conformance Inspection for Feedstock and DED Build requirements must be in accordance with Para 4.7 in lieu of Para 4.8.; Test - ;Heat Treatment; Item - ;Each Additively Manufactured Part; Performance - ;PPD 802-8979760 as modified herein; Acceptance - ;PPD 802-8979760 as modified herein; ;Complete record of all heat treatments, including time, temperatures, atmosphere, and heating and cooling rates must be provided.; Test - Non-Destructive Tests Item - ;Weld Repair (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification ;Complete record of all weld repaired defects including location, weld repair inspection results, post-weld heat treatment if required and the associated weld procedure approvals must be provided.; Test - Hydrostatic Test Item - Each Assembly Performance - ;In accordance with Note 3 on Admiral Filter Drawing 204452; (for a minimum of 3 minutes) Acceptance - ;In accordance with Note 3 on Admiral Filter Drawing 204452; 3.4 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.5 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD708; in ECDS at https://register.nslc.navy.mil/ 3.6 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.7 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.7.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.7.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.7.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.8 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria. The GAC document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/ 3.9 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.10 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.11 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.11.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.11.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.11.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.12 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.13 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.13.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.14 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Te

Source notice

More from United States Department of the Navy posted in December 2025

More lists