DOOR,BREECH ASSEMBL
- Status
- Closed, the response deadline passed on Feb 9, 2026
- Agency
- United States Department of the Navy
- Office
- MECHANICSBURG, USA
- Notice type
- Solicitation
- Solicitation number
- N0010426QFA74
- NAICS
- 336612 - Boat Building
- PSC
- 2040 - MARINE HARDWARE AND HULL ITEMS
- Posted
- 2026-01-28
- Deadline
- 2026-02-09
Description
CONTACT INFORMATION|4|N743.25|WVE|771-229-1462|JORDAN.D.NEELY2.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specification sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report- Certifications Combo- Receiving Report & Invoice- Material|N/A|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material |N50286|TBD|133.2|N/A|N/A|N39040 - Certifications|N/A|N/A| SEE DD FORM 1423|PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL (L1) JORDAN.D.NEELY2.CIV@US.NAVY.MIL| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery|one year from date of delivery||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|336612|1000|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| Files may include NOFORN or CLASSIFIED, please be aware you may need to take additional steps to obtain restricted drawings. \ DD1423 Data Item A001 may be waived if already on file at NAVSUP WSS Mechanicsburg. Submission of Certification Data CDRLs will be on or before 20days prior to scheduled delivery. PNSY review/acceptance ofCertification CDRLs 6 working days after receipt of Certification DD 1423 CDRLs. Final delivery of material will beon or before 20 days after effective date of the resulting contract. Any contract awarded as a result of this solicitation will be"DO" rated order certified fornational defense use under the Defense Priorities andAllocations System (DPAS). If drawings are included in the solicitation, access needs to be requested on the individual solicitation page on Contracts Opportunities on the Government'sbeta.SAM website. After requesting access, send an email to the Primary POC listed on the solicitation. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Identification of Classified Documents - This contract/purchase order requires the Contractor to have authorized access to classified documents in accordance with the attached Contract Security Classification Specification (DD Form 254). The classified documents and security level are: ;845-4456141 - CONFIDENTIAL; 2.3 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.3.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.3.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.3.3 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. DRAWING DATA=4456141 |80064| A| |X|0001 | A|00026|0000000 DRAWING DATA=4457348 |53711| T| |D|0001 | T|49998|2874807 DRAWING DATA=4457349 |43689| J| |D|0001 | J|49998|0379007 DRAWING DATA=4457350 |53711| J| |D|0001 | J|49998|1112839 DRAWING DATA=4457351 |53711| N| |D|0001 | N|49998|1028236 DRAWING DATA=4457354 |53711| J| |D|0001 | J|49998|2419046 DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-B148 | | | |181001|A| | | DOCUMENT REF DATA=ASTM-B150 | | | |190401|A| | | DOCUMENT REF DATA=ASTM-B283 | | | |200401|A| | | DOCUMENT REF DATA=ASTM-A744 | | | |201101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-B-24480 | | |A |850620|A| | | DOCUMENT REF DATA=MIL-C-24707 | | | |890127|A| | | DOCUMENT REF DATA=MIL-C-24707 |0003| | |890127|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=A-A-59004 | | |B |081118|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 ;The Breech Door Assembly, Assy 98, must be in accordance with NAVSHIPS Drawing 505-4457348 consisting of Items 52, 60, 91-94, 100-112, 126-138, 141-146, 149, 156, and 157, except as amplified or modified herein.; 3.2 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Breech Door, Item 91 on Drawing 4457349; Material - ;MIL-B-24480 with the applicable requirements of ASTM-B148. Chrome Plated in accordance with General Note 6.; Part - ;Valve Stem, Item 102 on Drawing 4457349; Material - ;ASTM-B150, Alloy C63200, Temper TQ50; Part - ;Locking Ring, Item 126 on Drawing 4457350; Material - ;Forged ASTM-B283, Alloy C63200, Temper TQ50 with the following minimum mechanical properties: Tensile Strength: 90,000 PSI Yield Strength: 40,000 PSI (0.5% extension under load) Elongation in 4D: 15% (minimum gage length of at least 1 in must be used) Chrome Plated in accordance with General Note 8; Part - ;Breech, Item 14901 on Drawing 4457351; Material - ;MIL-C-24707/3 and ASTM-A744, Grade CF-8M, Carbon content not to exceed .03% MAX; 3.3 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Test - Non-Destructive Tests Item - ;Weld Repair (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification Test - ;5x Visual Magnification or Dye Penetrant Inspection (root layer); Item - ;Weld Joints on Handle, Item 60 on Drawing 4457354; Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - ;Visual and Dye Penetrant Inspection (final layer); Item - ;Weld Joints on Handle, Item 60 on Drawing 4457354; Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - ;Dye Penetrant Inspection (root and final layer); Item - ;Weld Joints on Breech, Item 14901 on Drawing 4457351; Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - ;Dye Penetrant Inspection (after final machining); Item - ;Hard facing on Breech, Item 14901 on Drawing 4457351; Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - ;Dye Penetrant Inspection; Item - ;Breech Door, Item 91 on Drawing 4457349, and Breech, Item 14901 on Drawing 4457351; Performance - T9074-AS-GIB-010/271 Acceptance - S9074-AR-GIB-010A/278 Test - Hydrostatic Test Item - Each Assembly Performance - ;General Note 2 on Drawing 4457348; (for a minimum of 3 minutes) Acceptance - ;General Note 2 on Drawing 4457348; 3.4 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.5 Confidential Hydrostatic Test Pressures - When test pressures are confidential, certification must reference ;845-4456141 Rev. A; and the item number to which the item was tested in lieu of the actual pressures. Any drawing requirement to mark the working pressure on the item does not apply and is strictly prohibited. 3.6 ;Dye Penetrant Inspections are to be performed prior to chrome plating.; 3.7 ;Note: The description of the Cotter Pin, Item 138 of Drawing 4457350, should be "5/32 DIA X 3.000 LG".; 3.8 Radiography is required on ;Breech Door, Item 91 on Drawing 4457349, and Breech, Item 14901 on Drawing 4457351; . 3.9 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.10 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.11 Thread Lubricant - Thread lubricants containing molybdenum disulfide must not be used on this material. Bacteria in water, especially seawater, causes molybdenum disulfide to break down. The by-products of the breakdown form compounds which attack the fasteners. Anti-galling compound A-A-59004 must be used as a replacement when thread lubricant is required for assembly. 3.12 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.12.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.12.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.12.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.13 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.13.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. 3.14 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.14.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.14.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.14.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.15 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.16 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.17 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.18 See CDRLs DI-MISC-80875 (welding procedures) and DI-MISC-80876 (weld procedure qualification data) - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as part of the certification OQE package submitted by the Contractor. Note: These requirements do not apply to tack/spot welds when the conditions of Section 4.2.1.1 of S9074-AR-GIB-010A/278 are met. 3.18.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.18.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. "WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC." WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ.") 3.18.3 The PCO's authorization for tAttachments
More from United States Department of the Navy posted in November 2025