BAR,METAL
- Status
- Closed, the response deadline passed on Sep 11, 2025
- Agency
- United States Department of the Navy
- Office
- MECHANICSBURG, USA
- Notice type
- Solicitation
- Solicitation number
- N0010425QFE67
- NAICS
- 331221 - Rolled Steel Shape Manufacturing
- PSC
- 9510 - BARS AND RODS
- Category
- Basic Materials (5.6)
- Posted
- 2025-08-27
- Deadline
- 2025-09-11
Description
CONTACT INFORMATION|4|N743.4|WVB|1 771-229-0743|amanda.l.bailey50.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specification sections C and E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8||x||x||||| VARIATION IN QUANTITY (APR 1984)|3|0%|-5%|total contract quantity| TIME OF DELIVERY (JUNE 1997)|20|0001|1,000|365|||||||||||||||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo-Receiving Report & Invoice - Material|N/A|TBD|N00104|TBD|N39040|N50286|TBD|133.2|N/A|N/A|S4306A - Material|N/A|N/A|See DD1423|PORT_PTNH_WAWF_NOTIFICATION@NAVY .MIL| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|365 days after acceptance of material|365 days after acceptance of material||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|331221|1,000|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2|x|| 1. Data Item A001 (inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mech. 2. NAVSUP WSS Mech will be considering past performance in the evaluation of offers. See Clause 252.213-7000. 3. The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS after receipt Final delivery of material (365 days) Please quote actual delivery days Early and incremental delivery is acceptable at no additional cost to the Government. 4. A variation in quantity of -5% of the total contract quantity is allowed. See FAR 52.211-16 for further details. 5. FAR 52.232-25(a)(5), entitled Prompt Payment, Constructive Acceptance ischanged from 7 days to 45 days after delivery of the supplies in accordancewith the terms and conditions of the contract. 6. This requirement has no Government source inspection. Inspection and Acceptance will occur at destination/destination. 7. This procurement is issued pursuant to Emergency Acquisition Flexibilities. 8. Any contract awarded as a result of this solicitation will be "DX" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-A193 | | |A |241015|A| | | DOCUMENT REF DATA=ASTM-B666 | | | |201101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |230223|A| |01| DOCUMENT REF DATA=ASTM-A962 | | | |240515|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=SAE AMS 2806 | | |C |080301|A| | | DOCUMENT REF DATA=SAE AMS 2807 | | |A |000901|A| | | DOCUMENT REF DATA=SAE AMS 2809 | | |A |070801|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=SAE AMS-STD-185 | | | |000901|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | 3. REQUIREMENTS 3.1 Manufacture and Design - The item furnished under this contract/purchase order must meet the requirements as specified in ASTM-A193 and ASTM-A962, except as amplified or modified herein. ASTM-A193 and ASTM-A962 ordering data information is provided below: A. Alloy steel and stainless steel bolting materials for high temperature service; ASTM-A193, Grade B16. B. Quenched and Tempered. C. Quantity must be as specified elsewhere in the contract/purchase order. D. Description of item required - ;Round Bar; E. Diameter - ;3 Inches; Length - Under 5" dia. = 8 feet min / 12 feet max (plus or minus 10%) 5" dia & over = 5 feet min / 12 feet max (plus or minus 10%) OR as specified elsewhere in the contract/purchase order. Finish - Centerless ground - tolerances for round bars, 2 inch and under must be in accordance with ASTM-A962. Tolerances for round bars larger than 2 inch must be plus 1/64 inch / minus 0 for outside diameter and 0.023 inch maxumum for out-of-roundness. F. Nuts are not applicable. G. Supplementary requirement S7 (magnetic particle inspection) of ASTM-A193 is required. H. Supplementary requirement S53 (sequential or continuous strand casting) ASTMof ASTM-A962 is applicable only when continuously cast material is supplied. No other special requirements apply. Order of Precedence - In the event of a conflict between the requirements of ASTM-A193 AND ASTM-A962, ASTM-A193 must take precedence. 3.2 Tensile Properties - ASTM-A193 Grades B7 and B16 bar must have a maximum tensile strength of 150 ksi. 3.3 Bar, Pipe, and Tube Quantities - When this order results in supplying fewer than 5 pieces as defined in the "Length" paragraph above, all material must be from a single heat of material. 3.4 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing (if any) per applicable specifications is still required, but certifications are only required as listed below. Test - ;Magnetic Particle Inspection; Item - Each bar/rod Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035, and the following requirements: Maximum depth of surface discontinuities must not exceed: .006 inch for diameters below 1/2 inch .008 inch for diameters 1/2 inch through 1 inch .012 inch for diameters over 1 through 1 1/2 inch .016 inch for diameters over 1 1/2 inch Confirmation of the depth of surface discontinuities may be accomplished by grinding, machining, or filing. Test - Macroetch Test Item - One Bar per Heat Performance - ASTM-A193 Acceptance - ASTM-A193 3.5 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.6 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government inelectronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.6.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to theoperational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.6.2 Requests for Waivers/Deviations for NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic Contractor Data Submission) system at https://register.nslc.navy.mil/ 3.6.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of theproduct. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineeringchange. 3.7 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.8 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.9 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.9.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.9.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the Contracting Officer or his authorized representative. 3.9.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.9.4 This contract provides for the performance of Government Quality Assurance at destination. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. 3.9.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO. 3.10 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.10.1 The supplier's gages, measuring and test equipment must be made available for use by the Government when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.10.2 All documents and reference data applicable to this contract must be available for review by the Government. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government. 3.11 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Prime Contractor who will notify the PCO so that appropriate planning for Government inspection can be accomplished. 3.11.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document. 3.11.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.11.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract. 3.11.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government. 3.11.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier. 3.12 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.12.1 Visual examination upon receipt to detect damage during transit. 3.12.2 Inspection for completeness and proper type. 3.12.3 Verification of material quality received. 3.12.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.12.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.12.6 Identification and protection from improper use or disposition. 3.12.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.12.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.12.9 Material returned to the contractor must be handled as GFM. 3.13 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accuraMore from United States Department of the Navy posted in August 2025