<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_navy/posts/115072736024667314" -->

---
title: 16--CONTROL BOX ASS, IN REPAIR/MODIFICATION OF (N0038325RC581) | Closed - MatchAwards
description: 16--CONTROL BOX ASS, IN REPAIR/MODIFICATION OF. United States Department of the Navy. Solicitation N0038325RC581. NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing. Deadline 2026-08-28. ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| TIME OF...
canonical: https://matchawards.com/dept_of_the_navy/posts/115072736024667314
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: 16--CONTROL BOX ASS, IN REPAIR/MODIFICATION OF (N0038325RC581) | Closed
og:url: https://matchawards.com/dept_of_the_navy/posts/115072736024667314
og:description: 16--CONTROL BOX ASS, IN REPAIR/MODIFICATION OF. United States Department of the Navy. Solicitation N0038325RC581. NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing. Deadline 2026-08-28. ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| TIME OF...
og:image: https://matchawards.com/system/accounts/avatars/000/000/085/original/a0262fe00d6c038b.png?1638992122
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# 16--CONTROL BOX ASS, IN REPAIR/MODIFICATION OF

Status

Closed, the response deadline passed on Aug 28, 2026

Agency

[United States Department of the Navy](/dept%5Fof%5Fthe%5Fnavy)

Office

PHILADELPHIA, USA

Notice type

Solicitation

Solicitation number

N0038325RC581

NAICS

[336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing](/groups/560)

PSC

1680 - MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS

Posted

2026-05-07

Deadline

2026-08-28

## Description

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| TIME OF DELIVERY (JUNE 1997)|20||||||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and receiving reports (combo)||TBD|N00383|TBD|TBD|TBD|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (NOV 2023)|9|||||||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|336413|1250||||||||||| TYPE OF CONTRACT (APR 1984)|1|Firm-fixed price| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| This is a sole source repair solicitation. Award will be placed against BOA N00383-23-G-SX01\. All terms and conditions of the BOA shall apply and take precedence over any conflicting terms and conditions contained in this solicitation. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 1\. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130, revision level "L" or latest revison, and IAW the drawing requirements. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995\. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.4 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.4.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: CONTROL BOX ASS ;1680-01-621-6695; NSN , ;3890AS003548-02; Part Number, Shall be performed IAW: CONTROL BOX ASS ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS. LATEST REVISION.; Publication (s). 1.4.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998\. 1.5 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.6 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.7 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.8 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.9 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.10 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.11 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;30003; ) ;3890AS003548-02; , Revision ;LATEST REVISION; and all details and specifications referenced therein. 1.12 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.13 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2\. APPLICABLE DOCUMENTS DRAWING DATA=3890AS000915 |30003| E| |D| | | | DRAWING DATA=3890AS002670 |30003| E| |D| | | | DRAWING DATA=3890AS002672 |30003| C| |D| | | | DRAWING DATA=3890AS002673 |30003| C| |D| | | | DRAWING DATA=3890AS002674 |30003| C| |D| | | | DRAWING DATA=3890AS002675 |30003| C| |D| | | | DRAWING DATA=3890AS002676 |30003| C| |D| | | | DRAWING DATA=3890AS002677 |30003| C| |D| | | | DRAWING DATA=3890AS002678 |30003| C| |D| | | | DRAWING DATA=3890AS002680 |30003| B| |D| | | | DRAWING DATA=3890AS002681 |30003| B| |D| | | | DRAWING DATA=3890AS002682 |30003| B| |D| | | | DRAWING DATA=3890AS002683 |30003| B| |D| | | | DRAWING DATA=3890AS002684 |30003| A| |D| | | | DRAWING DATA=3890AS002685 |30003| A| |D| | | | DRAWING DATA=3890AS002686 |30003| A| |D| | | | DRAWING DATA=3890AS002726 |30003| B| |D| | | | DRAWING DATA=3890AS003308 |30003| A| |D| | | | DRAWING DATA=3890AS003548 |30003| L| |D| | | | DRAWING DATA=3890AS003757 |30003| E| |D| | | | DRAWING DATA=3890AS003758 |30003| E| |D| | | | DRAWING DATA=3890AS003759 |30003| E| |D| | | | DRAWING DATA=3890AS003764 |30003| E| |D| | | | DRAWING DATA=3890AS003767 |30003| G| |D| | | | DRAWING DATA=3890AS004366 |30003| E| |D| | | | DRAWING DATA=3890AS004367 |30003| E| |D| | | | DRAWING DATA=3890AS004368 |30003| E| |D| | | | DRAWING DATA=3890AS004369 |30003| E| |D| | | | DRAWING DATA=3890AS004377 |30003| D| |D| | | | DRAWING DATA=3890AS004378 |30003| B| |D| | | | DRAWING DATA=3890AS004380 |30003| B| |D| | | | DRAWING DATA=3890AS004439 |30003| C| |D| | | | DRAWING DATA=3890AS004440 |30003| B| |D| | | | DRAWING DATA=3890AS004441 |30003| C| |D| | | | DRAWING DATA=3890AS004442 |30003| C| |D| | | | DRAWING DATA=3890AS004455 |30003| D| |D| | | | DRAWING DATA=3890AS004456 |30003| A| |D| | | | DRAWING DATA=3890AS004457 |30003| C| |D| | | | DRAWING DATA=3890AS004458 |30003| B| |D| | | | 3\. REQUIREMENTS 1\. Unique Requirements: a. See Official Remarks. b. See Official Remarks. c. The contractor/overhaul activity shall provide the repair procedure they will follow to NAWCADLKE engineering for review and approval prior to commencing repairs. The repair procedure shall be forwarded per the Overhaul/RepairProcedure CDRL provided in this document. NAWCADLKE engineering POC is katherine.a.flast.civ@us.navy.mil. 2\. Interim Inspection Requirements: N/A 3\. ALRE CSI parts require certification. a. When certified, an ALRE part is marked with a Material Identification Code (MIC). NAWCADLKE QA will providethe MIC to DCMA if the component is source accepted, and after receipt of all associated data. Application of MIC shall be in the same methodology as the drawing note for part marking, and in same area as part marking (next to, above, orbelow). 4\. Receipt inspection and Certification of Sub-Components: a. P/Ns 3890AS003757-01, 3890AS003764-01, 3890AS003767-01, 3890AS004366-01, 3890AS004377-01, 3890AS004439-01, and 3890AS004455-01 will be certified and marked as directed by NAWCADLKE. 5\. Receipt Inspection and Certification of the Top Assembly: a. The receipt Inspection and Certification of the Top Assembly, P/N 3890AS003548-02, shall occur during the final inspection. 6\. Contractor Assist and Part Marking: a. The contractor shall assist on the conduct of the inspections (both final and interim) required that are necessary to certify the critical items specified herein. The contractor shall provide adequate facilities, inspection equipment, and skilled personnel, to support the NAWCADLKE Inspector in the conduct of the interim inspection(s). The contractor shall provide gauges, tools, fixtures, and jigs necessary to perform the inspections. The contractor shall also provide sufficient rigging/material handling services and manpower to setup/configure/operate equipment & machines used to accomplish the inspection task. This contractor assist requirement shall be applicable to 100% of the production quantities. As part of the MRI process, the NAWCADLKE QA representative will provide, in writing, a certification number along with direction for marking the Critical Safety Items (CSI). 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: CONTROL BOX ASS ;3890AS003548-01; P/N, ;1680-01-621-6695; NSN, ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS. LASTEST REVISION.; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures an 

<!-- mobian-agent-ad sponsored="true" id="ba24c8ae-e645-44ec-8825-d09a65443850" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


[Source notice](https://sam.gov/workspace/contract/opp/2bf37e6c130b4a948413c94e9e1ccd59/view)

[More from United States Department of the Navy posted in August 2025](/dept%5Fof%5Fthe%5Fnavy/archive/2025-08)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"16--CONTROL BOX ASS, IN REPAIR/MODIFICATION OF","description":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| TIME OF DELIVERY (JUNE 1997)|20||||||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and receiving reports (combo)||TBD|N00383|TBD|TBD|TBD|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (NOV 2023)|9|||||||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|336413|1250||||||||||| TYPE OF CONTRACT (APR 1984)|1|Firm-fixed price| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| This is a sole source repair solicitation. Award will be placed against BOA N00383-23-G-SX01. All terms and conditions of the BOA shall apply and take precedence over any conflicting terms and conditions contained in this solicitation. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be \"issued\" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to \"issue\" contractual documents as detailed herein. 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130, revision level \"L\" or latest revison, and IAW the drawing requirements. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the...","url":"https://matchawards.com/dept_of_the_navy/posts/115072736024667314","identifier":"N0038325RC581","category":"336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"1680 - MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS"}],"availabilityStarts":"2026-05-07","availabilityEnds":"2026-08-28","validThrough":"2026-08-28T23:59:59-04:00","sameAs":"https://sam.gov/workspace/contract/opp/2bf37e6c130b4a948413c94e9e1ccd59/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Manufacturing","item":"https://matchawards.com/contracts/manufacturing"}]}
```

