ClickCease AN/WSN-12 Navigation Processor Module (NPM) Low-Rate Initial… | Closed - MatchAwards

AN/WSN-12 Navigation Processor Module (NPM) Low-Rate Initial Production (LRIP)

Status
Closed, the response deadline passed on Jul 17, 2025
Agency
United States Department of the Navy
Office
WASHINGTON NAVY YARD, USA
Notice type
Presolicitation
Solicitation number
N00024-25-R-5207
NAICS
334511 - Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
PSC
6605 - NAVIGATIONAL INSTRUMENTS
Category
Test & Measurement Supplies (5.4)
Posted
2025-07-02
Deadline
2025-07-17
Place of performance
Charlottesville, Virginia 22901, UNITED STATES

Description

The Government intends to Sole Source this requirement to Northrop Grumman Systems Corporation (NGSC). 

The Naval Sea Systems Command (NAVSEA), on behalf of Program Executive Office Integrated Warfare Systems (PEO IWS 6.0), intends to utilize other than full and open competition to award an AN/WSN-12 Navigation Processor Module (NPM) Low-Rate Initial Production (LRIP) contract to Northrop Grumman Systems Corporation (NGSC). The AN/WSN-12 NPM LRIP contract will be a follow-on contract to the existing AN/WSN-7/7A Ring Laser Gyro Navigators (RLGN) and AN/WSN-7B Ring Laser Gyrocompasses (RLG) production contract (N00024-20-D-5230). The N00024-20-D-5230 contract was awarded to NGSC for WSN-7 Inertial Navigation Systems (INS) production.

The AN/WSN-12 Inertial Navigation System (INS) has two main components, the Inertial Sensor Module (ISM) and the Navigation Processor Module (NPM). The AN/WSN-12 ISM production contract (N00024-23-C-5234) was awarded to NGSC for the ISM component full rate production in December of 2022. The planned AN/WSN-12 NPM LRIP contract will provide the necessary engineering support, production, and testing of the AN/WSN-12 NPM and includes integration with the ISM (from N00024-23-C-5234) resulting in the complete INS. Additionally, this effort will include retrofitting one AN/WSN-7X Engineering Development Model (EDM) shipset, developed under contract N00024-20-D-5230, into the AN/WSN-12 INS configuration. This contract will address the Navy’s INS requirements by satisfying new construction ship deliveries from FY 2028 through FY 2030.

Source notice

More from United States Department of the Navy posted in July 2025

More lists