ClickCease 63--CONTROL UNIT,ALARM, IN REPAIR/MODIFICATION OF (N0038325QC487) | Closed - MatchAwards

63--CONTROL UNIT,ALARM, IN REPAIR/MODIFICATION OF

Status
Closed, the response deadline passed on Dec 1, 2025
Agency
United States Department of the Navy
Office
PHILADELPHIA, USA
Notice type
Solicitation
Solicitation number
N0038325QC487
NAICS
335311 - Power, Distribution, and Specialty Transformer Manufacturing
PSC
6350 - MISCELLANEOUS ALARM, SIGNAL, AND SECURITY DETECTION SYSTEMS
Category
Security Systems (3.2)
Posted
2025-11-14
Deadline
2025-12-01

Description

CONTACT INFORMATION|4|N792.08|T2N|808-603-7406|Alexis.k.healy.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (combo) Type||Cognizant DFAS|N00383|Cognizant DCMA|Cognizant DCMA|See Schedule|Source||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|335311|800||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| 1. The purpose of this modification is to state NAVAIR's concurrence to move forward with the ECA repairs using INDAL's drawing package. 2. All other terms and conditions remain the same. NIIN 012458061 part number 212602-2 maybe be upgraded to NIIN 014891481 part number 212602-3 please give straight pricingfor the overhaul 012458061 to upgrade 014891481. The quanity has increased from 2 to 6. No other terms have changed. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be ?issued? by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government?s acceptance of the contractor?s proposal constitutes bilateral agreement to ?issue? contractual documents as detailed herein. This solicitation is for repair. This is a sole source requirement. The Government physically does not have in its possession sufficient, accurate, or legible data to contract with other than the current source. These items require Government Source Approval prior to award. If you are not an approved source, you must submit, together with your proposal, the information detailed in the NAVSUP WSS Source Approval Brochure which can be obtained on the internet at https://public.navsup.navy.mil/public/ops$public.business_vendor_form_new Offers received which fail to provide all data required by the source approval brochure will not be considered for award under this solicitation. For information or questions regarding this notice, please contact Alexis Healy at the email address: alexis.k.healy.civ@us.navy.mil. NAVSUP WSS Requests proposals submitted in response to this solicitation remain valid for a minimum of 120 days following submission. All contractual documents related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.3 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.3.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: CONTROL UNIT,ALARM ;6350-01-489-1481; NSN , ;212602-3; Part Number, Shall be performed IAW: CONTROL UNIT,ALARM ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS. REV AB.; Publication (s). 1.3.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 1.4 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.5 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.6 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.8 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.9 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST DRAWING; drawing number ( ;(80020); ) ;212602-3; , Revision ;REV AB; and all details and specifications referenced therein. 1.11 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.12 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS DRAWING DATA=212602 |80020|AB| |D| | | | DRAWING DATA=212604 |80020| V| |D| | | | DRAWING DATA=212605 |80020|AE| |D| | | | DRAWING DATA=212606 |80020|AD| |D| | | | DRAWING DATA=212608 |80020| C| |D| | | | DRAWING DATA=212609 |80020| B| |D| | | | DRAWING DATA=212613 |80020| C| |D| | | | DRAWING DATA=212620 |80020| B| |D| | | | DRAWING DATA=212647 |80020| C| |D| | | | DRAWING DATA=212649 |80020| H| |D| | | | DRAWING DATA=212651 |80020| G| |D| | | | DRAWING DATA=212652 |80020| G| |D| | | | DRAWING DATA=212654 |80020| J| |D| | | | DRAWING DATA=212655 |80020| K| |D| | | | DRAWING DATA=212666 |80020| J| |D| | | | DRAWING DATA=212667 |80020| E| |D| | | | DRAWING DATA=212668 |80020|AG| |D| | | | DRAWING DATA=212669 |80020| D| |D| | | | DRAWING DATA=212670 |80020| E| |D| | | | DRAWING DATA=212671 |80020| E| |D| | | | DRAWING DATA=212672 |80020| L| |D| | | | DRAWING DATA=212673 |80020| L| |D| | | | DRAWING DATA=212674 |80020| G| |D| | | | DRAWING DATA=212675 |80020| G| |D| | | | DRAWING DATA=212676 |80020| U| |D| | | | DRAWING DATA=212677 |80020| C| |D| | | | DRAWING DATA=212678 |80020| D| |D| | | | DRAWING DATA=212679 |80020| C| |D| | | | DRAWING DATA=212680 |80020| E| |D| | | | DRAWING DATA=212682 |80020| W| |D| | | | DRAWING DATA=212683 |80020| L| |D| | | | DRAWING DATA=212686 |80020| G| |D| | | | DRAWING DATA=212705 |80020| E| |D| | | | DRAWING DATA=212706 |80020| K| |D| | | | DRAWING DATA=212707 |80020| J| |D| | | | DRAWING DATA=212707 W/L |80020| P| |D| | | | DRAWING DATA=212708 |80020| L| |D| | | | DRAWING DATA=212709 |80020| D| |D| | | | DRAWING DATA=212710 |80020| G| |D| | | | DRAWING DATA=212725 |80020| H| |D| | | | DRAWING DATA=212726 |80020| J| |D| | | | DRAWING DATA=212726 W/L |80020| E| |D| | | | DRAWING DATA=212733 |80020| F| |D| | | | DRAWING DATA=212734 |80020| P| |D| | | | DRAWING DATA=212735 |80020| G| |C| | | | DRAWING DATA=212737 |80020| G| |D| | | | DRAWING DATA=212738 |80020| D| |D| | | | DRAWING DATA=212740 |80020| E| |D| | | | DRAWING DATA=212741 |80020| D| |D| | | | DRAWING DATA=212742 |80020| E| |D| | | | DRAWING DATA=212748 |80020| B| |D| | | | DRAWING DATA=212749 |80020| C| |D| | | | DRAWING DATA=212750 |80020| G| |D| | | | DRAWING DATA=212753 |80020| C| |D| | | | DRAWING DATA=212762 |80020| C| |D| | | | DRAWING DATA=212763 |80020| C| |D| | | | DRAWING DATA=212764 |80020| F| |D| | | | DRAWING DATA=212768 |80020|AA| |D| | | | DRAWING DATA=212775 |80020| Y| |D| | | | DRAWING DATA=212775 W/L |80020| M| |D| | | | DRAWING DATA=212776 |80020| D| |D| | | | DRAWING DATA=212777 |80020| E| |D| | | | DRAWING DATA=212778 |80020| D| |D| | | | DRAWING DATA=212779 |80020| D| |D| | | | DRAWING DATA=212780 |80020| G| |D| | | | DRAWING DATA=212781 |80020| F| |D| | | | DRAWING DATA=212782 |80020| G| |D| | | | DRAWING DATA=212785 |80020| B| |D| | | | DRAWING DATA=212791 |80020| F| |D| | | | DRAWING DATA=212793 |80020| L| |D| | | | DRAWING DATA=212793 W/L |80020| M| |D| | | | DRAWING DATA=212794 |80020| M| |D| | | | DRAWING DATA=212794 W/L |80020| V| |D| | | | DRAWING DATA=212795 |80020| J| |D| | | | DRAWING DATA=212795 W/L |80020| L| |D| | | | DRAWING DATA=212796 |80020| P| |D| | | | DRAWING DATA=212796 W/L |80020| V| |D| | | | DRAWING DATA=212797 |80020| C| |D| | | | DRAWING DATA=212801 |80020| M| |D| | | | DRAWING DATA=212804 |80020| F| |D| | | | DRAWING DATA=212806 |80020| G| |D| | | | DRAWING DATA=212810 |80020| C| |D| | | | DRAWING DATA=212812 |80020| J| |A| | | | DRAWING DATA=212813 |80020| B| |D| | | | DRAWING DATA=212816 |80020| D| |D| | | | DRAWING DATA=212819 |80020| R| |D| | | | DRAWING DATA=212820 |80020| C| |D| | | | DRAWING DATA=212827 |80020| D| |D| | | | DRAWING DATA=212828 |80020| C| |D| | | | DRAWING DATA=212829 |80020| C| |D| | | | DRAWING DATA=212831 |80020| F| |D| | | | DRAWING DATA=212832 |80020| F| |D| | | | DRAWING DATA=212833 |80020| F| |D| | | | DRAWING DATA=212836 |80020| B| |D| | | | DRAWING DATA=212837 |80020| E| |D| | | | DRAWING DATA=212838 |80020| B| |D| | | | DRAWING DATA=212839 |80020| E| |D| | | | DRAWING DATA=212840 |80020| D| |D| | | | DRAWING DATA=212841 |80020| C| |D| | | | DRAWING DATA=212842 |80020| E| |D| | | | DRAWING DATA=212855 |80020| H| |D| | | | DRAWING DATA=212856 |80020| K| |D| | | | DRAWING DATA=212857 |80020| B| |D| | | | DRAWING DATA=212858 |80020| B| |D| | | | DRAWING DATA=212859 |80020| B| |D| | | | DRAWING DATA=212903 |80020| F| |D| | | | DRAWING DATA=212904 |80020| K| |D| | | | DRAWING DATA=212905 |80020| E| |D| | | | DRAWING DATA=212906 |80020| H| |D| | | | DRAWING DATA=212907 |80020| N| |D| | | | DRAWING DATA=212910 |80020| B| |D| | | | DRAWING DATA=212913 |80020| F| |D| | | | DRAWING DATA=212915 |80020| H| |D| | | | DRAWING DATA=212916 |80020| L| |D| | | | DRAWING DATA=212918 |80020| J| |D| | | | DRAWING DATA=212919 |80020| L| |D| | | | DRAWING DATA=212921 |80020| B| |D| | | | DRAWING DATA=212922 |80020| D| |D| | | | DRAWING DATA=212923 |80020| B| |D| | | | DRAWING DATA=212925 |80020| D| |D| | | | DRAWING DATA=212926 |80020| E| |D| | | | DRAWING DATA=212927 |80020| C| |D| | | | DRAWING DATA=212928 |80020| D| |D| | | | DRAWING DATA=212929 |80020| H| |D| | | | DRAWING DATA=212965 |80020| C| |D| | | | DRAWING DATA=212966 |80020| C| |D| | | | DRAWING DATA=212967 |80020| F| |D| | | | DRAWING DATA=212969 |80020| E| |D| | | | DRAWING DATA=212974 |80020| E| |D| | | | DRAWING DATA=212976 |80020| B| |D| | | | DRAWING DATA=212977 |80020| D| |D| | | | DRAWING DATA=212978 |80020| E| |D| | | | DRAWING DATA=212979 |80020| C| |D| | | | DRAWING DATA=212980 |80020| G| |D| | | | DRAWING DATA=212981 |80020| E| |D| | | | DRAWING DATA=212982 |80020| G| |D| | | | DRAWING DATA=212985 |80020| D| |D| | | | DRAWING DATA=212986 |80020| D| |D| | | | DRAWING DATA=212987 |80020| C| |D| | | | DRAWING DATA=212988 |80020| D| |D| | | | DRAWING DATA=212989 |80020| B| |D| | | | DRAWING DATA=212990 |80020| B| |D| | | | DRAWING DATA=212991 |80020| C| |D| | | | DRAWING DATA=212992 |80020| B| |D| | | | DRAWING DATA=212995 |80020| B| |D| | | | DRAWING DATA=212996 |80020| B| |D| | | | DRAWING DATA=212998 |80020| J| |D| | | | DRAWING DATA=212999 |80020| E| |D| | | | DRAWING DATA=213002 |80020| B| |D| | | | DRAWING DATA=213089 |80020| C| |D| | | | DRAWING DATA=213091 |80020| B| |D| | | | DRAWING DATA=213116 |80020| B| |D| | | | DRAWING DATA=213117 |80020| B| |D| | | | DRAWING DATA=213118 |80020| C| |D| | | | DRAWING DATA=213119 |80020| B| |D| | | | DRAWING DATA=213659 |80020| -| |D| | | | DRAWING DATA=213660 |80020| -| |D| | | | DRAWING DATA=213712 |80020| -| |D| | | | DRAWING DATA=213713 |80020| A| |D| | | | DRAWING DATA=213714 |80020| -| |D| | | | DRAWING DATA=213715 |80020| -| |D| | | | DRAWING DATA=213716 |80020| -| |D| | | | DRAWING DATA=213717 |80020| B| |D| | | | DRAWING DATA=423595 |80020| E| |A| | | | DRAWING DATA=521736 |80020| C| |A| | | | DRAWING DATA=523985 |80020| B| |D| | | | DRAWING DATA=523986 |80020| -| |D| | | | DRAWING DATA=523987 |80020| -| |D| | | | DRAWING DATA=523988 |80020| -| |D| | | | DRAWING DATA=523989 |80020| -| |D| | | | DRAWING DATA=523990 |80020| -| |D| | | | DRAWING DATA=523991 |80020| -| |D| | | | DRAWING DATA=6300-001 |80020| G| |D| | | | 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: CONTROL UNIT,ALARM ;212602-3; P/N, ;6350-01-489-1481; NSN, ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS. REV AB; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replac

Source notice

More from United States Department of the Navy posted in June 2025

More lists