SHUT-OFF ASSEMBLY
- Status
- Closed, the response deadline passed on Jul 31, 2025
- Agency
- United States Department of the Navy
- Office
- MECHANICSBURG, USA
- Notice type
- Solicitation
- Solicitation number
- N0010425QYJ58
- NAICS
- 334220 - Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing
- PSC
- 5985 - ANTENNAS, WAVEGUIDES, AND RELATED EQUIPMENT
- Posted
- 2025-08-11
- Deadline
- 2025-07-31
Description
CONTACT INFORMATION|4|N741.P18|ER5|771-229-2023|sagan.kakkar.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|ISO9001| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO||TBD|N00104|TBD|TBD|SEE SCHEDULE|SEE SCHEDULE|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| LIST OF SOLICITATION ATTACHMENTS|5|||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|334220|1250 emp|||||||||||| INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (NOV 2021)|2||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| This procurement requirement is for quantity 14 SHUT-OFF ASSEMBLY (NSN 1HS 5985 011664388). This requirement is 100 Percent set-aside for small businesses. The Government will issue an award resulting from this Request for Quotation (RFQ) to the responsible offeror whose quotation, conforming to the solicitation, results in the best value to the Government, considering both price and non-price factors. The following factors will be used to evaluate competitive offers received in response to this RFQ: 1. Price 2. Non-Price Factors 1. Delivery Lead Time. The proposed delivery lead times and schedules will be evaluated and the proposed delivery lead time considered to be in the best interest of the Government will be rated higher than other delivery lead times proposed. 2. Past Performance. The offeror's past performance on related contractswill be evaluated to determine, as appropriate, successful performance ofcontract requirements, quality and timeliness of delivery of goods andservices, cost management, communications between contracting parties, proactive management, and customer satisfaction. All non-price evaluation factors, when combined, are approximately equal to price. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. \ 1. SCOPE 1.1 ;This procurement specification contains the requirements for manufacture and the contract quality requirements for ;AN/BRA-24 Antenna Shutoff Assembly; for use on Navy submarines.; 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.1.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.1.3 The "Document Changes" section provides supersessions/changes to referenced documents. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=RE-B102161 |80064| F| |D| | | | DRAWING DATA=RE-B102162 |80064| D| |D| | | | DRAWING DATA=RE-B102163 |80064| D| |D| | | | DRAWING DATA=RE-B102164 |80064| C| |D| | | | DRAWING DATA=RE-B102183 |80064| C| |D| | | | DRAWING DATA=RE-B102260 |80064| H| |D| | | | DRAWING DATA=RE-C102160 |50225| G| |D| | | | DRAWING DATA=RE-C49486 |80064| G| |D| | | | DOCUMENT REF DATA=QQ-N-281 | | |D |851023|A| 2| | DOCUMENT REF DATA=MIL-STD-130N | | | |121116|A| |01| DOCUMENT REF DATA=ASME B46.1 | | | |190101|A| | | DOCUMENT REF DATA=ASTM D5363 | | | |160401|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=NCSL Z540.3 | | | |060803|A| | | DOCUMENT REF DATA=MIL-DTL-18240F | | | |000313|A|1 | | DOCUMENT REF DATA=MIL-PRF-25732E | | | |240308|A| | | DOCUMENT REF DATA=FED-STD-H28/20B | | | |941221|A| |01| DOCUMENT REF DATA=SAE AS28775A | | | |081201|A| | | DOCUMENT REF DATA=MS51951C | | | |951218|A| | | DOCUMENT REF DATA=SAE AMS-QQ-S-763D | | | |150301|A| | | DOCUMENT REF DATA=ETHACURE 300 COML | | | | |A| | | DOCUMENT REF DATA=EIA-649C 2/19 | | | | |A| | | DOCUMENT REF DATA=MIL-STD-973 INT NOTICE 3 | | | |950113|A| |03| DOCUMENT REF DATA=ADIPRENE L-100 (50-60A)-COML | | | | |A| | | DOCUMENT REF DATA=ISO10012 | |01| |030415|A| | | DOCUMENT REF DATA=ISO9001 | | | |150915|A| | | 3. REQUIREMENTS 3.1 ;Design and Manufacturing - The ;AN/BRA-24 Antenna Shutoff Assembly; furnished under this contract/purchase order shall meet the material, mechanical, physical and test requirements as specified on Drawings RE-C49486 (consisting of Item Numbers 1 thru 9) and RE-B102260, Dash No. 3 including associated specificationsmentioned in this procurement. ; 3.1.1 ;Source Control Drawing RE-B102260 - The Urethane Elastomer (ADIPRENE L 100) and Curative (ETHACURE 300) shall only be procured from LANXESS Urethane Systems; and shall conform to the requirements specified on Drawing RE-B102260, Dash No. 3.; 3.1.2 ;Qualified Products List - The Self-Locking Element Nylon (Strip or Plug stated on drawing RE-B102183/MIL-DTL-18240) and O-Ring (Item No. 8 of drawing RE-C49486/MIL-PRF-25732) furnished under this order shall be in accordance with the respective drawing and specification and shall be products which are qualified on the applicable qualified products list (QPL).; 3.2 ;Marking Requirements - The supplier shall permanently mark and identify each first article and production lot unit ;AN/BRA-24 Shutoff Assembly; in accordance with the requirements of Drawing RE-C49486, Note 2 (contract number, manufacturer cage code, assembly drawing number and assembly serial number) per MIL-STD-130.; 3.2.1 ;The supplier shall permanently mark and identify part number RE-C102160 in accordance with the requirements of drawing Note 4 (manufacturer cage code, identification number, heat number and serial number) per MIL-STD-130.; 3.2.2 ;The supplier shall permanently mark the following parts RE-B102162, RE-B102163 and RE-B102164 as identified on the applicable drawing. The supplier shall mark ;tag or bag; parts RE-B102162, RE-B102163 and RE-B102164 with contract, heat and serial number per MIL-STD-130 until installed in applicable assembly.; 3.2.3 ;The supplier shall mark ;tag or bag; the following parts RE-B102161 and RE-B102183 with the applicable part number, contract, lot or heat number including serial number for part RE-B102161 per MIL-STD-130 until installed in applicable assembly.; 3.3 ;First Article Testing/Inspection - (Supplier Testing/Inspection). The first article testing/inspection procedure and approval are required for the ;AN/BRA-24 Shutoff Assembly;. Government approval is required prior to commencement of first article unit.; 3.4 ;Notification - The supplier shall notify Naval Surface Warfare Center, Philadelphia Division, (NSWCPD), 5001 S. Broad Street, Philadelphia, PA 19112-1403 by email matthew.j.ogilvie.civ@us.navy.mil, Code 242MO after award of contract.; 3.4.1 ;The NSWCPD is the acceptance activity for the Contract Data Requirements List (DD1423) Data Items. NSWCPD WAWF/IRAPT ;Acceptor; DODACC is ;N64498;.; 3.4.2 Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until another drawing revision is approved. The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted, the date of the granting of the authorization, and the name of the granting authority. Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below. The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA 17055-0788. Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor. 3.5 Configuration Control - MIL-STD-973 entitled "Configuration Management", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973, Paragraph 5.4.8.2 and Appendix D. Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E. Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E. (Original and two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.) 3.6 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned. These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 4.4 ;Inspection System - The Supplier's Quality Inspection System shall be in accordance with MIL-I-45208 or ISO 9001 and NCSL Z540.3 or ISO 10012. The supplier shall develop and submit their written Quality Inspection and Test Plan as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the supplier's written Quality Inspection and Test Planis required by the contract. CDRL: QUALITY INSPECTION & TEST PLAN per MIL-I-45208, NCSL Z540.3 and DI-QCIC-81110; 4.5 ;Surface Roughness - All surface finishes are in RMS measurements. Where the degree of surface roughness is indicated, the surface shall be free from all visible imperfections as defined by Standard ASME B46.1.; 4.6 ;Finished Edges - Finished edges shall be in accordance with the applicable drawing requirements.; 4.7 ;Finish Molded Seal, Static - Each completed molded seal shall be free from any glossy finish as defined on Drawing RE-B102161, Note 2; and must be free of air bubbles as specified on Drawing RE-B102260.; 4.8 ;Threads - Threads shall be inspected in accordance with FED-STD-H28/20 System 21 requirements. Thread inspection shall include the measurement and recording of the major diameter for external threads and the minor diameter for internal threads.; 4.9 ;Material Control - The supplier shall have an effective material control system that provides for certified quantitative mill or industrial laboratory reports of chemical and physical analysis by heat, lot or batch for raw material ordered for first article and production units. If the material is subsequently heat-treated a certification of physical analysis, after heat treatment is also required for each heat lot or batch. Also, where the applicable material specification calls out (e.g., corrosion resistance test, macro-etch test) these test results shall also be reported on the applicable mill or industrial laboratory report. (1) The physical analysis shall establish the following properties for metallic parts: Mechanical Properties Ultimate Tensile Strength, Yield Strength and Elongation. (2) The physical analysis shall establish the following properties for non-metallic part material: Hardness, Tensile Strength, Modulus, Compression Set and Tear Str ength as specified on Drawing RE-B102260, Dash No. 3; 4.10 ;First Article Testing/Inspection - (Supplier Testing/Inspection). The supplier shall perform first article testing/inspection on ;AN/BRA-24 Shutoff Assembly; in accordance with the applicable drawings and specifications, and their approved first article procedure.; 4.10.1 ;The first article inspection shall be made by the cognizant DCMA-QAR at the supplier?s and/or subcontractor facility. The supplier shall notify NSWCPD, Code 242MO two weeks in advance prior to the scheduled first article testing/inspection, so an NSWCPD representative has the option of being present during the first article testing/inspection.; 4.11 ;First Article Approval for Testing/Inspection Procedure and Acceptance- (Supplier Testing/Inspection). The supplier shall prepare and submit their First Article Testing/Inspection Procedure ;AN/BRA-24 Shutoff Assembly; in accordance with the requirements of DI-NDTI-80603 and applicable drawings as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the procedure is required prior to commencement of first article unit. CDRL: FIRST ARTICLE TESTING/INSPECTION PROCEDURE per DI-NDTI-80603A; 4.12 ;First Article Testing/Inspection.; 4.12.1 ;Visual/Dimensional Inspection.; 4.12.2 ;The supplier shall visually examine 100% the first article molded seal, static p/n RE-B102161 is free from any glossy finish as specified on the drawing; and is free of air bubbles as specified on drawing RE-B102260, Dash No. 3 and record results.; 4.12.3 ;be inspected 100% and results recorded.; 4.13 ;First Article Testing/Inspection Report and Acceptance - (Supplier Testing/Inspection). The supplier shall submit for the first article unit ;AN/BRA-24 Shutoff Assembly; testing/inspection reports in compliance with the requirements of DI-NDTI-80603, applicable drawings and specifications. The report shall also include a copy of ;Certified Mill Certificate; Certified Industrial Laboratory Analysis for Material Urethane Elastomer ADIPRENE L 100 (50 to 65A); Certificate of Compliance for Material Curative ETHACURE 300; Certificate of Conformance for Material and Visual/Dimensional Inspection Report; identified in the Objective Quality Evidence Records Section of this document, anMore from United States Department of the Navy posted in June 2025