<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_navy/posts/114601451926683489" -->

---
title: SMALL BUSINESS MULTIPLE AWARD CONSTRUCTION PROJECT- B2189… | Closed - MatchAwards
description: SMALL BUSINESS MULTIPLE AWARD CONSTRUCTION PROJECT- B2189 REPLACE ROOF AND HVAC SYSTEM. United States Department of the Navy. Solicitation N4008023R0022009. NAICS 236220 - Commercial and Institutional Building Construction. Total small business set-aside. Deadline 2025-06-17. THIS SOLICITATION IS...
canonical: https://matchawards.com/dept_of_the_navy/posts/114601451926683489
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: SMALL BUSINESS MULTIPLE AWARD CONSTRUCTION PROJECT- B2189… | Closed
og:url: https://matchawards.com/dept_of_the_navy/posts/114601451926683489
og:description: SMALL BUSINESS MULTIPLE AWARD CONSTRUCTION PROJECT- B2189 REPLACE ROOF AND HVAC SYSTEM. United States Department of the Navy. Solicitation N4008023R0022009. NAICS 236220 - Commercial and Institutional Building Construction. Total small business set-aside. Deadline 2025-06-17. THIS SOLICITATION IS...
og:image: https://matchawards.com/system/accounts/avatars/000/000/085/original/a0262fe00d6c038b.png?1638992122
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# SMALL BUSINESS MULTIPLE AWARD CONSTRUCTION PROJECT- B2189 REPLACE ROOF AND HVAC SYSTEM

Status

Closed, the response deadline passed on Jun 17, 2025

Agency

[United States Department of the Navy](/dept%5Fof%5Fthe%5Fnavy)

Office

WASHINGTON NAVY YARD, USA

Notice type

Solicitation

Solicitation number

N4008023R0022009

NAICS

[236220 - Commercial and Institutional Building Construction](/groups/212)

PSC

Z2AA - REPAIR OR ALTERATION OF OFFICE BUILDINGS

Category

[Facility Related Services (4.4)](/categories/facilities-and-construction/facility-related-services)

Set-aside

[Total Small Business Set-Aside (FAR 19.5)](/contracts/small-business)

Posted

2025-05-30

Deadline

2025-06-17

Place of performance

St James, Maryland 20670, UNITED STATES

## Description

**THIS SOLICITATION IS OPEN \*\*\*EXCLUSIVELY\*\*\* TO THE FOLLOWING** **SMALL BUSINESS MULTIPLE AWARD CONSTRUCTION CONTRACTORS:**

C.E.R., Inc.

877 Baltimore Annapolis Blvd., Suite 101

Severna Park, Maryland 21146 

CJW Contractors, Inc.

13849 Park Center Rd, Suite B

Herndon, Virginia, 20171

Edifice Services JV, LLC

507 N. Frederick Ave, Suite 104 

Gaithersburg, Maryland 20877 

ENCON Desbuild JV3 LLC 

8201 Corporate Drive, Suite 720 

Hyattsville, Maryland 20785

EVCON-CWC JV, LLC

3176 ½ Bladensburg Rd NE, Suite 1 

Washington, District of Columbia 20018

Fastbreak General Contractors, LLC

47 W Queens Way Suite G1 

Hampton, Virginia 23669

Ocean Construction Services

104 Aragona Blvd Suite 101 

Virginia Beach, Virginia 23462

Ritz Construction

47 East All Saints Street, Suite 6 

Frederick, Maryland 21701

**This construction project involves the replacement of roofing and HVAC systems. The following summary outlines the key components of the scope of work.**

<!-- mobian-agent-ad sponsored="true" id="5903c96a-c576-4d35-ba38-8c9216c9e02d" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/facility-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


**Roof Replacement:**

The Roof Project includes the Removal and Installation of a new approximately 33,800 SF modified bitumen roof excluding the roofs of the Security Station and associated covered walkway to the northwest.

The Roof Work shall include but is not limited to the removal of existing: modified bitumen roofing system, ridged insulation, expansion joints, pipe sleeves, flashing and counter flashings, reglets, water damaged wood decking, metal fascia, gutters, downspouts, roof drain covers, gutters, gutter downspouts and any other related items associated with roofing work. Existing roof ladders are to be removed and reinstalled in place. The access door at the north side of highest most roof it to be removed and a new appropriately sized door is to be installed, due to the increase in roof insulation the flashings and counter flashing may conflict with the height of the door. All operations equipment is to be removed and stored per Supported Command instruction prior to work beginning. The Contractor is to remove and replace approximately 30% of joists and roof deck that are damaged due to water intrusion. The Contractor is to remove and replace in kind 500 LF of wood fascia and vent soffit in locations of water damage.

Testing of the roof drains shall be tested after roof installation, any failed roof drains are the responsibility of the contractor. Contingent on the results of the test work shall be done to ensure proper drainage. Lead testing is required prior to the beginning of work.

Provide a new roof system complies with ICC code. Provide metal flashing, counter flashing, vent sleeves, stainless steel rain covers over pitch pockets, seal base of pitch pockets with elastomeric sealant, curbs for new HVAC units, metal roof drain strainers, crickets, coping (if required), metal fascia, gutters, downspouts, and expansion joints. Interior work shall include the repair of ceilings; repair any damaged ceiling finishes to match existing (30%). The existing wood deck and joists areas to be replaced where required.

**HVAC Replacement:**

The HVAC project includes but is not limited to demolition and installation of new HVAC system to include ductwork, piping, wiring, control devices, and all other appurtenances comprising a complete and operable system. Contractor shall verify location and dimensions of existing mechanical and electrical equipment, shall coordinate all work prior to the start of construction.

Contractor shall comply with federal, state, and local codes and laws involving abandonment and sealing of Geothermal HVAC system. The Geothermal Loop must be sealed by a Certified Master Well Driller. All fluid in the boreholes/tubing must be removed, includes sampling of the liquid to ensure it does not contain additives making it Hazardous Waste. If it is a Hazardous Waste, the liquid must properly dispose in methods in accordance with applicable federal, state, and local codes and laws. A Well abandonment form must be submitted to Maryland Department Environmental (MDE) after sealing. Provide copy of the form to contracting officer. See Attached form in part 6.

Contractor shall provide radon testing for 90 days for each habitable room after the project completion. Contractor shall comply with Radon Testing Standard Procedures in accordance with EPA and Navy Radon Assessment and Mitigation Program (NAVRAMP) Guidebook for Naval Shore Installations.

Contractor shall provide Structural Engineer to perform roof structural analyzes, load calculation, and solution to reinforce existing roof to support the new load of HVAC equipment.

Contractor shall carefully remove existing security cameras, audio notification devices, fire alarm and detectors to accommodate the work spaces. Shall be reinstalled at their original locations after the completion of work.

Contractor shall ensure proper handling, storage and proper disposal of all hazardous material, recovery and recycle HVAC system refrigerants, test downspouts and roof drainage are functioning properly after the project completion in accordance with NAS PAX River CATEX environmental requirements. See part 6 attachment.

Provide grass sod replacement damaged during construction.

Please see the solicitation and detailed scope of work attached to this post for additional information. 

If you have any questions please don’t hesitate to contact me.

v/r

Jennifer Coffman

**Contract Specialist** 

**NAVFAC Washington** 

**Cell Phone: (202) 436-1831**

**Fax: (301)-342-3141**

**jennifer.e.coffman2.civ@us.navy.mil**

**22445 Peary Rd Bldg. 504** 

**Patuxent River, MD 20670**

## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/97ace319e7d44d1698c41dbbc30d46f5/download)
* [Attachment 2](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a4797b27f53c48fb937d9fdcc5f5f652/download)

[Source notice](https://sam.gov/opp/8e818b9be1b146ff9c9aa174c7a8a008/view)

[More from United States Department of the Navy posted in May 2025](/dept%5Fof%5Fthe%5Fnavy/archive/2025-05)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Small Business Set-Aside Government Contracts Available Now](/contracts/small-business)
* [Construction Government Contracts Available Now](/contracts/construction)

```json
{"@context":"https://schema.org","@type":"Demand","name":"SMALL BUSINESS MULTIPLE AWARD CONSTRUCTION PROJECT- B2189 REPLACE ROOF AND HVAC SYSTEM","description":"THIS SOLICITATION IS OPEN *** EXCLUSIVELY *** TO THE FOLLOWING SMALL BUSINESS MULTIPLE AWARD CONSTRUCTION CONTRACTORS: C.E.R., Inc. 877 Baltimore Annapolis Blvd., Suite 101 Severna Park, Maryland 21146 CJW Contractors, Inc. 13849 Park Center Rd, Suite B Herndon, Virginia, 20171 Edifice Services JV, LLC 507 N. Frederick Ave, Suite 104 Gaithersburg, Maryland 20877 ENCON Desbuild JV3 LLC 8201 Corporate Drive, Suite 720 Hyattsville, Maryland 20785 EVCON-CWC JV, LLC 3176 ½ Bladensburg Rd NE, Suite 1 Washington, District of Columbia 20018 Fastbreak General Contractors, LLC 47 W Queens Way Suite G1 Hampton, Virginia 23669 Ocean Construction Services 104 Aragona Blvd Suite 101 Virginia Beach, Virginia 23462 Ritz Construction 47 East All Saints Street, Suite 6 Frederick, Maryland 21701 This construction project involves the replacement of roofing and HVAC systems. The following summary outlines the key components of the scope of work. Roof Replacement: The Roof Project includes the Removal and Installation of a new approximately 33,800 SF modified bitumen roof excluding the roofs of the Security Station and associated covered walkway to the northwest. The Roof Work shall include but is not limited to the removal of existing: modified bitumen roofing system, ridged insulation, expansion joints, pipe sleeves, flashing and counter flashings, reglets, water damaged wood decking, metal fascia, gutters, downspouts, roof drain covers, gutters, gutter downspouts and any other related items associated with roofing work. Existing roof ladders are to be removed and reinstalled in place. The access door at the north side of highest most roof it to be removed and a new appropriately sized door is to be installed, due to the increase in roof insulation the flashings and counter flashing may conflict with the height of the door. All operations equipment is to be removed and stored per Supported Command instruction prior to work beginning. The Contractor is to remove and replace approximately 30% of joists and roof deck that are damaged due to water intrusion. The Contractor is to remove and replace in kind 500 LF of wood fascia and vent soffit in locations of water damage. Testing of the roof drains shall be tested after roof installation, any failed roof drains are the responsibility of the contractor. Contingent on the results of the test work shall be done to ensure proper drainage. Lead testing is required prior to the beginning of work. Provide a new roof system complies with ICC code. Provide metal flashing, counter flashing, vent sleeves, stainless steel rain covers over pitch pockets, seal base of pitch pockets with elastomeric sealant, curbs for new HVAC units, metal roof drain strainers, crickets, coping (if required), metal fascia, gutters, downspouts, and expansion joints. Interior work shall include the repair of ceilings; repair any damaged ceiling finishes to match existing (30%). The existing wood deck and joists areas to be replaced where required. HVAC Replacement: The HVAC project includes but is not limited to demolition and installation of new HVAC system to include ductwork, piping, wiring, control devices, and all other appurtenances comprising a complete and operable system. Contractor shall verify location and dimensions of existing mechanical and electrical equipment, shall coordinate all work prior to the start of construction. Contractor shall comply with federal, state, and local codes and laws involving abandonment and sealing of Geothermal HVAC system. The Geothermal Loop must be sealed by a Certified Master Well Driller. All fluid in the boreholes/tubing must be removed, includes sampling of the liquid to ensure it does not contain additives making it Hazardous Waste. If it is a Hazardous Waste, the liquid must properly dispose in methods in accordance with applicable federal, state, and local codes and laws. A Well abandonment form must be submitted to Maryland Department Environmental (MDE) after sealing. Provide copy of the form to contracting officer. See Attached form in part 6. Contractor shall provide radon testing for 90 days for each habitable room after the project completion. Contractor shall comply with Radon Testing Standard Procedures in accordance with EPA and Navy Radon Assessment and Mitigation Program (NAVRAMP) Guidebook for Naval Shore Installations. Contractor shall provide Structural Engineer to perform roof structural analyzes, load calculation, and solution to reinforce existing roof to support the new load of HVAC equipment. Contractor shall carefully remove existing security cameras, audio notification devices, fire alarm and detectors to accommodate the work spaces. Shall be reinstalled at their original locations after the completion of work. Contractor shall ensure proper handling, storage and proper disposal of all hazardous material, recovery and recycle HVAC system refrigerants, test downspouts and roof drainage are functioning properly after the project completion...","url":"https://matchawards.com/dept_of_the_navy/posts/114601451926683489","identifier":"N4008023R0022009","category":"236220 - Commercial and Institutional Building Construction","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"Z2AA - REPAIR OR ALTERATION OF OFFICE BUILDINGS"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.4 Facility Related Services","url":"https://matchawards.com/categories/facilities-and-construction/facility-related-services"}],"availabilityStarts":"2025-05-30","availabilityEnds":"2025-06-17","validThrough":"2025-06-17T23:59:59-04:00","areaServed":"St James, Maryland 20670, UNITED STATES","sameAs":"https://sam.gov/opp/8e818b9be1b146ff9c9aa174c7a8a008/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Small business","item":"https://matchawards.com/contracts/small-business"}]}
```

