FUEL UNIT SUPPORT A
- Status
- Closed, the response deadline passed on May 12, 2025
- Agency
- United States Department of the Navy
- Office
- MECHANICSBURG, USA
- Notice type
- Solicitation
- Solicitation number
- N0010425QZC44
- NAICS
- 333914 - Measuring, Dispensing, and Other Pumping Equipment Manufacturing
- PSC
- 4930 - LUBRICATION AND FUEL DISPENSING EQUIPMENT
- Category
- Machinery & Components (5.1)
- Posted
- 2025-04-25
- Deadline
- 2025-05-12
Description
CONTACT INFORMATIONl4IN742.4IWWRl(717) 605-7562lamanda.a.gowdy.civ@us.navy.mil I ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)ll9llllllllllllllllllll INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)12111 INSPECTION/ACCEPTANCEPOINTl6IIIIIII WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)ll6I Material- Receiving Report & Invoice CombolN/AITBDIN00104ITBDITBDIN50286ITBDIN/AIN/AIN/AIN/AIN/AIN/AIN/AI1-866-618-5988-WAWF Helpdeskl NAVY USE OF ABILITYONE SUPPORT CONTRACTOR- RELEASE OF OFFEROR INFORMATION
(3-18))I1IWEAPON SYSTEMS SUPPORT MECHI WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE
2003)l6lone year from date of delivery lone year from date of delivery 11111 WARRANTY OF
DATA--BASIC (MAR 2014)12111 BUY AMERICAN FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC
(FEB 2024)lllllllllllllll ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)11311111111111111 BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE BASIC (FEB 2024))15111111 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-00003 AND2025- 00004))I13l333914l750 (# of employees)IIIIIIIIIIII NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS,AND ENRGY PROGAM USE (APRIL 2008))I2IIXI 1. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government’s acceptance of the Contractor’s proposal constitutes bilateral agreement to "issue" contractual details as detailed herein. 2. Any contract/order awarded as a result of this solicitation will be a "DX" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). 3. The following proposed delivery schedule applies: Final delivery of material shall be on or before 221 days after the effective date of the resulting contract. 4. This requirement shall be persunt to Emergency Acquisition Authority. \ 1. SCOPE
1.1 This contract/purchase order contains the requirements for manufacture or refurbishment and the contract
quality requirements for the FUEL UNIT SUPPORT A .
2. APPLICABLE DOCUMENTS
2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the
references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in
this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption
has been obtained.
2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including
2.2.1 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase
order.
DRAWING NO CAGE REV DISTR CD
<26M01-5202 96169 D D>
2.2.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as
an attachment to this contract/purchase order.
2.2.3 Specification Revisions - The specification revisions listed under "Documents References" below are the
preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library
Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is
to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of
material certified to those older revisions or to use newer specification revisions when material is certified to
newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision
on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are
considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this
contract.
2.3
DOCUMENT REFERENCES
SPEC NO. SLASH NO. PART NO REV DATE DISTR CD AMEND CHG NTC SUPP
MIL-STD-130 N 16 NOV 12 A 01
3. REQUIREMENTS
3.1 Design, Manufacture, and Performance - Except as modified herein, the item furnished under this
contract/purchase order must meet the design, manufacture, and performance requirements specified on CAGE <96169>
Drawing <26M01-5202-A6> .
3.2 Marking - This item must be physically identified in accordance with MIL-STD-130.
3.3 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of
proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government
inelectronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order.
3.3.1 Waivers/Deviations - Waivers and Deviations must be designated as Critical, Major, or minor. All waivers and
deviations require review and approval bythe Contracting Officer. A copy of approved waivers and deviations with
related OQE must be submitted via WAWF as part of the entire OQE package. (SOC MCD C material requires both approved
and disapproved waivers and deviations be submitted) Requests must include the information listed below.
a. A complete description of the contract requirement affected and the nature of the waiver/deviation
(non-conformance), including a classification of Critical, Major, or Minor.
b. Number of units (and serial/lot numbers) to be delivered in this configuration.
c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized
by Government personnel or impacts to theoperational use of the product.
d. Information about remedial action being taken to prevent reoccurrence of the non-conformance.
3.3.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic
Contractor Data Submission) system at https://register.nslc.navy.mil/
3.3.3 ECPs - The Government will maintain configuration control and change authority for all modifications or
changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The
Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment
covered by this contract. ECPs must be prepared in Contractor format, and must include the following information:
a. The change priority, change classification (Class I or Class II), and change justification.
b. A complete description of the change to be made and the need for that change.
c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact
on those CIs.
d. Proposed changes to documents controlled by the Government.
f. Recommendations about the way a retrofit should be accomplished.
g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized
by Government personnel in support of theproduct.
h. Impacts to the operational use of the product.
i. Complete estimated life-cycle cost impact of the proposed change.
j. Milestones relating to the processing and implementation of the engineeringchange.modifications or exclusions.
3.4 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct
contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause
for rejection.
QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING 5.1 Preservation, Packaging, Packing
and Marking- Preservation, Packaging, Packing and Marking must be in accordance with the
Contract/Purchase Order Schedule and as specified below. 5.1.1 Additional Preservation, Packaging,
Packing and Marking requirements are included in the referenced Refurbishment Instruction or
Procurement Specification from SUBMEPP. MIL STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE
SCHEDULE 6. NOTES- NOT APPLICABLE DATE OF FIRST
SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out
within paragraph 3 -
Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission)
at:https://register.nslc.navv.mil/.
Attachments
More from United States Department of the Navy posted in April 2025