43--PUMP UNIT,CENTRIFUG, IN REPAIR/MODIFICATION OF
- Status
- Closed, the response deadline passed on Apr 7, 2025
- Agency
- United States Department of the Navy
- Office
- MECHANICSBURG, USA
- Notice type
- Solicitation
- Solicitation number
- N0010425RZB78
- NAICS
- 333914 - Measuring, Dispensing, and Other Pumping Equipment Manufacturing
- PSC
- 4320 - POWER AND HAND PUMPS
- Category
- Machinery & Components (5.1)
- Posted
- 2025-03-10
- Deadline
- 2025-04-07
Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|ISO9001| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| TIME OF DELIVERY (JUNE 1997)|20|0001AA|2|By 04/14/2027|||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Combo Invoice & Receiving Report||TBD|N00104|TBD|TBD|See Schedule|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| FIRM FIXED PRICE REPAIR PURCHASE ORDERS|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery|one year from date of delivery||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (JAN 2025)|4||||| SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (NOV 2023))|9|||||||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA-MODIFICATIONS (NOV 2021))|7|||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)|13|333914|750|||||||||||| COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEVIATION 2018-O0015)(MAY 2018))|1|| REQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018)|1|E-Mail| TYPE OF CONTRACT (APR 1984)|1|Firm Fixed Price| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIEDCOST OR PRICING DATA (MAY 2024))|1|| 1. This is an Advanced Equipment Repair Program (AERP) sole source repair requirement. 2. Please provide a Firm-Fixed Price (FFP) proposal for the full repair effort of the requirement. Please include the cost of new or estimated cost of new with the submitted proposal. 3. In repair price, include all costs associated with receipt and complete repair of the material that may be in unwhole condition, missing hardware, damaged, handling damage, missing parts, wear damage, and CAV Reporting. Also provide the following information: 1. Teardown & Evaluation Rate: 2. Repair Turn Around Time (RTAT): 3. Throughput Constraint: 4. Induction Expiration Date: 4. Repair Turn Around Time (RTAT) the resultant contractual delivery requiremeent is measured from the asset return to the asset acceptance under the terms of the contract. For purposes of this section, return is defined as physical receipt of the F-condition asset at the contractors facility as reflected in the AAction Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The contractor must obtain final inspection and acceptance by the Government for all assets within the RTAT established in the contract. 1. Requested RTAT: By 04/14/2027 2. Proposals shall reference the proposed RTAT and any capacity constraints. 5. Price Reductions Any asset for which the contractor does not meet the requiired RTAT will incur a price reduction of (TBD Price) per unit. This adjustment will be implemented via a Reduction Modification at the end of contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Governments right to terminate for default. 6. If requirement will be packaged at a location different from the Offerors adddress, the Offeror shall provide the Company Name, Street Address and CAGE of the Packaging Facility. 7. If the Offeror is not the Original End Manufacturer(OEM) of the material called out in the requirement, the OEM must be stated (Company Name and CAGE) and the Offeror must be able to provide a signed letter of authorization to perform repairs from the OEM on the companys letterhead. 8. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be issued by the Government when copies are either deposited in the mail,l, transmitted by facsimile, or sent by other electronic commerce method such as email. The Governments acceptance of the contractors proposal constitutes bililateral agreement to issue contractual documents as detailed herein. 9. The contractor must obtain final inspection and acceptance by the Government for all assets within the RTAT established in the resulting contract. 10. Any contract awarded as a result of this solicitation will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contract to be awarded will be a rated order. 11. Offerors must have a valid U.S. Security Clearance of CONFIDENTIAL or higher in order to respond to this RFP N0010425RZB78, because the RFQ N0010425RZB78 includes an annex classified at the CONFIDENTIAL level which will be released only to offerors possessing the appropriate clearance. All classified material must be handled in accordance with the National Industrial Security Program Operating Manual (NSPOM)(DoD 5220-22-M) and Industrial Security Regulation (DoD 5220.22-R). \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Identification of Classified Documents - This contract/purchase order requires the Contractor to have authorized access to classified documents in accordance with the attached Contract Security Classification Specification (DD Form 254). The classified documents and security level are: ;6404016 - Confidential; 2.3 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.3.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.3.2 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;RY-190530 93232 G B RY-189779 93232 M B RW-187362 93232 G B RW-189940 93232 J B 3254-6 95402 G B; 2.3.3 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. DRAWING DATA=ADDITIONAL |03950| -| |D|0001 | -|49998|0008916 DRAWING DATA=6404016 |53711| B| |F|0001 | B|00026|0000000 DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-F136 | | | |980410|A| | | DOCUMENT REF DATA=ASTM-B348 | | | |211101|A| | | DOCUMENT REF DATA=ASTM-B367 | | | |220401|A| | | DOCUMENT REF DATA=ASTM-B381 | | | |130701|A| | | DOCUMENT REF DATA=ASTM-B446 | | | |190401|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | | DOCUMENT REF DATA=ASTM-E1417 | | | |160615|A| | | DOCUMENT REF DATA=ASTM-E1444 | | | |160601|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=ASTM-D4066 | | | |130701|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=MIL-DTL-15024 | | |G |180303|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=QPL 25027 | | |17 |000207|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=A-A-59004 | | |B |081118|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=AIA/NAS NASM 17828 | | |1 |130430|A| | | DOCUMENT REF DATA=AIA/NAS NASM 25027 | | |1 |121221|A| | | DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 REFURBISHED MATERIAL STATEMENT OF WORK (REPAIR SOW) - 3.1.1 INSPECTION - Clean and determine if refurbishment is possible. At disassembly, the Contractor must record all identifying markings found on the parts of each assembly. The Contractor must maintain traceability of these markingsto each unit throughout refurbishment. 3.1.2 RE-USEABLE PARTS - Any parts of the original assembly that are useable (replacement is not necessary), may be utilized as initially supplied. 3.1.3 NON-USEABLE PARTS - Any parts of the original assembly that are not usable (replacement is necessary) must be in accordance with this TDP (Technical Data Package). 3.1.4 REFURBISHMENT - Upon completion of inspection, this item must be refurbished to be in accordance with ;DRAWING RW-187362, PARTS LIST RY-189779, DRAWING 3254-6 (MOTOR), MAINTENANCE STANDARD 5240-081-012 (CSD373), MAINTENANCE STANDARD 5240-081-052 (CSD372); , except as amplified or modified herein. This applies to all "Parts Requiring Certification" as identified elsewhere in this Contract/Purchase Order. 3.1.5 Additional SOW Requirements - ;IF PUMP IMPELLER REQUIRES REPLACEMENT; THE CORRECT REPLACEMENT IMPELLER PART NUMBER MUST BE IDENTIFIED BY MEASURING THE ORIGINAL IMPELLER DIAMETER AND SELECTING THE SAME DIAMETER IMPELLER FROM PARTS LIST RY-189779; 3.2 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;CASING, ITEM 1.1 AND STUFFING BOX HOUSING, ITEM 2.1; Material - ;ASTM-B367, GRADE C-2; Part - ;STUDS, ITEM 1.2 AND ITEM 1.4; Material - ;ASTM-B348 GRADE 5; OR ASTM-F136 AND ASTM-B348 GRADE 23 IN ACCORDANCE WITH NOTE 18 OF DRAWING RY-189779; Part - ;SELF LOCKING NUTS, ITEM 1.3 AND ITEM 1.5; Material - ;ASTM-B348, GRADE 2 TO BE IN ACCORDANCE WITH MS-17828; Part - ;FLANGED NIPPLE, ITEM 1.8; Material - ;ASTM-B381, GRADE F2; OR ASTM-B348, GRADE 2; Part - ;BREAKDOWN BUSHING, ITEM 2.2; Material - ;ASTM-B348, GRADE 2; Part - ;SETSCREW, ITEM 2.4; Material - ;ASTM-B348 GRADE 5; OR ASTM-F136 AND ASTM-B348 GRADE 23 IN ACCORDANCE WITH NOTE 18 OF DRAWING RY-189779; Part - ;SHAFT, ITEM 102 PER DRAWING 3254-6; Material - ;ASTM-B446, UNS N06625, GRADE 1; 3.3 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Test - 5x Visual Magnification or Dye Penetrant Inspection (root layer) Item - Weldments Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - Visual and Dye Penetrant Inspection (final layer) Item - Weldments Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - Non-Destructive Tests Item - ;Weld Repair (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification Test - ;HYDROSTATIC TEST; Item - ;EACH ASSEMBLY; Performance - ;MAINTENANCE STANDARD 5240-081-012 (CSD373); Acceptance - ;MAINTENANCE STANDARD 5240-081-012 (CSD373); Test - ;STRUCTUREBORNE NOISE TEST; Item - ;EACH ASSEMBLY; Performance - ;MAINTENANCE STANDARD 5240-081-012 (CSD373); Acceptance - ;MAINTENANCE STANDARD 5240-081-012 (CSD373); Test - ;PUMP OPERATIONAL PERFORMANCE TEST; Item - ;EACH ASSEMBLY; Performance - ;MAINTENANCE STANDARD 5240-081-012 (CSD373); Acceptance - ;MAINTENANCE STANDARD 5240-081-012 (CSD373); Test - ;MOTOR TESTS AND EXAMINATION; Item - ;EACH MOTOR; Performance - ;ALL RECORDED MEASUREMENTS REQUIRED BY MAINTENANCE STANDARD 5240-081-052 (CSD372); Acceptance - ;ALL RECORDED MEASUREMENTS REQUIRED BY MAINTENANCE STANDARD 5240-081-052 (CSD372); Test - ;Liquid Penetrant Inspection; Item - ;STUDS, ITEM 1.2 AND ITEM 1.4; Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222 Acceptance - MIL-DTL-1222 Test - ;Dye Penetrant Inspection for Non-Magnetic Grades; Item - ;SELF LOCKING NUTS, ITEM 1.3 AND ITEM 1.5; Performance - T9074-AS-GIB-010/271 or ASTM-E1417/ASTM-E1444 (Method C solvent removal techniques must not be used on thread) Acceptance - ;NASM25027; Test - Quality Conformance Tests Item - Self-Locking Nuts Performance - ;NASM25027; Acceptance - ;NASM25027; Attribute - Certificate of Completion Item - Self-Locking Nut Nonmetallic Insert Performance - ;ASTM-D4066, Group 01, Class 1 or 2, Grade 1; Attribute - Certificate of Compliance Item - Self-Locking Nuts Performance - This Certificate must state that self-locking nuts were manufactured by an approved source. Approved sources are those listed on QPL-25027 for the appropriate fastener. This QPL may also be considered as approved sources for Heavy Hex self-locking nuts. 3.4 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD372 and CSD373; in ECDS at https://register.nslc.navy.mil/ 3.5 Thread Lubricant - Thread lubricants containing molybdenum disulfide must not be used on this material. Bacteria in water, especially seawater, causes molybdenum disulfide to break down. The by-products of the breakdown form compounds which attack the fasteners. Anti-galling compound A-A-59004 must be used as a replacement when thread lubricant is required for assembly. 3.6 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.7 Confidential Hydrostatic Test Pressures - When test pressures are confidential, certification must reference ;6404016, Revision B; and the item number to which the item was tested in lieu of the actual pressures. Any drawing requirement to mark the working pressure on the item does not apply and is strictly prohibited. 3.8 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.9 Component Identification Description (CID) - When applicable drawing(s) and/or specification(s) specify that a nameplate or identification plate is required, the CID number ( ;CID 016032741X; ) must be added. When no plate is specified, an identification plate in accordance with MIL-DTL-15024, Type "C" on brass or Type "H" on aluminum must be securely attached to each assembly showing the above CID number. No assembly must be shipped without the CID number attached. 3.10 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.11 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate iMore from United States Department of the Navy posted in March 2025