<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_navy/posts/113962923386860097" -->

---
title: 20--COVER ASSY, LOT LWR (N0010425QFB30) | Closed - MatchAwards
description: 20--COVER ASSY, LOT LWR. United States Department of the Navy. Solicitation N0010425QFB30. NAICS 336612 - Boat Building. Deadline 2026-05-27. CONTACT INFORMATION|4|N743.43|WWV|717-605-3992|NOELLE.M.SMITH10.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||...
canonical: https://matchawards.com/dept_of_the_navy/posts/113962923386860097
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: 20--COVER ASSY, LOT LWR (N0010425QFB30) | Closed
og:url: https://matchawards.com/dept_of_the_navy/posts/113962923386860097
og:description: 20--COVER ASSY, LOT LWR. United States Department of the Navy. Solicitation N0010425QFB30. NAICS 336612 - Boat Building. Deadline 2026-05-27. CONTACT INFORMATION|4|N743.43|WWV|717-605-3992|NOELLE.M.SMITH10.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||...
og:image: https://matchawards.com/system/accounts/avatars/000/000/085/original/a0262fe00d6c038b.png?1638992122
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# 20--COVER ASSY, LOT LWR

Status

Closed, the response deadline passed on May 27, 2026

Agency

[United States Department of the Navy](/dept%5Fof%5Fthe%5Fnavy)

Office

MECHANICSBURG, USA

Notice type

Solicitation

Solicitation number

N0010425QFB30

NAICS

[336612 - Boat Building](/groups/566)

PSC

2040 - MARINE HARDWARE AND HULL ITEMS

Posted

2026-05-06

Deadline

2026-05-27

## Description

CONTACT INFORMATION|4|N743.43|WWV|717-605-3992|NOELLE.M.SMITH10.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|SEE SPECIFICATIONS SECTION C & E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|N00104|TBD|TBD|N50286|TBD|||N/A|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|ONE YEAR|365 DAYS AFTER THE LAST DELIVERY UNDER THIS CONTRACT||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)|13|314994|1000|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| The hour and date specified for receipt of offers has been extended to 4:30PM EST on 28 March 2025\. \\ 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2.The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS 6 working days after receipt Final delivery of material (450 days) \\ 1\. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.1.1 DSSP Scope of Certification Material - Material Control Division ;(A); applies to this material. 1.1.2 This ;COVER ASSY, LOT LWR; contains non-metallic materials which must satisfy the toxicity and flammability requirements of NAVSEA SS800-AG-MAN-010/P-9290\. Use of any material other than that specified requires special engineering approval and may require testing. 2\. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.2 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.3 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. DRAWING DATA=HBLANK-A151 |53711| D|ER |D|0001 | |49998|0240589 DRAWING DATA=H547-0291A01 |53711| A|ER |D|0001 | A|49998|0045988 DRAWING DATA=H547-0291A01 |53711| A|ER |D|0002 | A|49998|0083897 DRAWING DATA=H547-0291A01 |53711| A|ER |D|0003 | A|49998|0045963 DRAWING DATA=H547-0291A01 |53711| A|ER |D|0004 | A|49998|0031076 DRAWING DATA=H547-0291A06 |53711| A|ER |D|0001 | A|49998|0037384 DRAWING DATA=H547-0291A06 |53711| A|ER |D|0002 | A|49998|0010497 DRAWING DATA=H547-0291A06 |53711| A|ER |D|0003 | A|49998|0042767 DRAWING DATA=H547-0291A06 |53711| A|ER |D|0004 | A|49998|0028372 DRAWING DATA=H547-0291A06 |53711| A|ER |D|0005 | A|49998|0042786 DRAWING DATA=H547-0291A06 |53711| A|ER |D|0006 | A|49998|0032378 DRAWING DATA=H547-0291A06 |53711| A|ER |D|0007 | A|49998|0168515 DRAWING DATA=H547-0291A06 |53711| A|ER |D|0008 | A|49998|0103624 DRAWING DATA=H547-0291A06 |53711| A|ER |D|0009 | A|49998|0087659 DRAWING DATA=H547-0291A07 |53711| A|ER |D|0001 | A|49998|0028095 DRAWING DATA=H547-0291A07 |53711| A|ER |D|0002 | A|49998|0016531 DRAWING DATA=H547-0291A07 |53711| A|ER |D|0003 | A|49998|0046539 DRAWING DATA=H547-0291A07 |53711| A|ER |D|0004 | A|49998|0100797 DRAWING DATA=H547-0291A08 |53711| A|ER |D|0001 | A|49998|0032544 DRAWING DATA=H547-0291A08 |53711| A|ER |D|0002 | A|49998|0014112 DRAWING DATA=H547-0291A08 |53711| A|ER |D|0003 | A|49998|0044599 DRAWING DATA=H547-0291A08 |53711| A|ER |D|0004 | A|49998|0106650 DRAWING DATA=H547-0291A10 |53711| A|ER |D|0001 | A|49998|0041060 DRAWING DATA=H547-0291A10 |53711| A|ER |D|0001.1 | A|49998|0018083 DRAWING DATA=H547-0291A10 |53711| A|ER |D|0002 | A|49998|0061189 DRAWING DATA=H547-0291A10 |53711| A|ER |D|0003 | A|49998|0114658 DRAWING DATA=H547-0291A12 |53711| A|ER |D|0001 | A|49998|0040870 DRAWING DATA=H547-0291A12 |53711| A|ER |D|0001.1 | A|49998|0021115 DRAWING DATA=H547-0291A12 |53711| A|ER |D|0002 | A|49998|0057862 DRAWING DATA=H547-0291A12 |53711| A|ER |D|0003 | A|49998|0095228 DRAWING DATA=H547-0291A12 |53711| A|ER |D|0004 | A|49998|0097885 DRAWING DATA=H547-0291A12 |53711| A|ER |D|0005 | A|49998|0179128 DRAWING DATA=H547-0291A13 |53711| A|ER |D|0001 | A|49998|0204666 DRAWING DATA=H547-0291A14 |53711| A|ER |D|0001 | A|49998|0103705 DRAWING DATA=H547-0291A15 |53711| A|ER |D|0001 | A|49998|0122862 DRAWING DATA=H547-0291A16 |53711| A|ER |D|0001 | A|49998|0173279 DRAWING DATA=H547-0291A17 |53711| A|ER |D|0001 | A|49998|0227612 DRAWING DATA=H547-0291A27 |53711| B|ER |D|0001 | B|49998|0598696 DRAWING DATA=H547-0291A28 |53711| A|ER |D|0001 | A|49998|0421705 DRAWING DATA=H547-0291A29 |53711| A|ER |D|0001 | A|49998|0445237 DRAWING DATA=H547-0291A3 |53711| A|ER |D|0001 | |49998|2226599 DRAWING DATA=H547-0291A30 |53711| C|ER |D|0001 | |49998|6417973 DRAWING DATA=H547-0291A31 |53711| D|ER |D|0001 | |49998|5849447 DRAWING DATA=H547-0291A34 |53711| A|ER |D|0001 | |49998|0988553 DRAWING DATA=H547-0291A37 |53711| A|ER |D|0001 | |49998|2189751 DRAWING DATA=7106772 |53711| A| |D|0000.A | A|49998|0048175 DRAWING DATA=7106772 |53711| A| |D|0001 | A|49998|0088498 DRAWING DATA=7106772 |53711| A| |D|0002 | A|49998|0057662 DRAWING DATA=7106772 |53711| A| |D|0003 | A|49998|0011734 DRAWING DATA=7106772 |53711| A| |D|0004 | A|49998|0012948 DRAWING DATA=7106772 |53711| A| |D|0005 | A|49998|0031511 DRAWING DATA=7106772 |53711| A| |D|0006.1 | A|49998|0067539 DRAWING DATA=7106772 |53711| A| |D|0006.2 | A|49998|0059155 DRAWING DATA=7106772 |53711| A| |D|0006.3 | A|49998|0029022 DRAWING DATA=7106772 |53711| A| |D|0006.4 | A|49998|0062810 DRAWING DATA=7106772 |53711| A| |D|0006.5 | A|49998|0010406 DRAWING DATA=7106772 |53711| A| |D|0007.1 | A|49998|0026212 DRAWING DATA=7106772 |53711| A| |D|0007.2 | A|49998|0039425 DRAWING DATA=7106772 |53711| A| |D|0007.3 | A|49998|0038947 DRAWING DATA=7106772 |53711| A| |D|0007.4 | A|49998|0041727 DRAWING DATA=7106772 |53711| A| |D|0007.5 | A|49998|0041906 DRAWING DATA=7106772 |53711| A| |D|0007.6 | A|49998|0032210 DRAWING DATA=7106772 |53711| A| |D|0008.1 | A|49998|0030242 DRAWING DATA=7106772 |53711| A| |D|0008.2 | A|49998|0053820 DRAWING DATA=7106772 |53711| A| |D|0008.3 | A|49998|0050031 DRAWING DATA=7106772 |53711| A| |D|0008.4 | A|49998|0055209 DRAWING DATA=7106772 |53711| A| |D|0008.5 | A|49998|0051356 DRAWING DATA=7106772 |53711| A| |D|0008.6 | A|49998|0047501 DRAWING DATA=7106772 |53711| A| |D|0008.7 | A|49998|0040835 DRAWING DATA=7106772 |53711| A| |D|0008.8 | A|49998|0018665 DRAWING DATA=7106772 |53711| A| |D|0009 | A|49998|0044845 DRAWING DATA=7106772 |53711| A| |D|0010 | A|49998|0095426 DRAWING DATA=7106772 |53711| A| |D|0011 | A|49998|0099148 DRAWING DATA=7106772 |53711| A| |D|0012 | A|49998|0157952 DRAWING DATA=7106772 |53711| A| |D|0013 | A|49998|0181579 DRAWING DATA=7106772 |53711| A| |D|0014 | A|49998|0108169 DRAWING DATA=7106772 |53711| A| |D|0015 | A|49998|0039264 DRAWING DATA=7106772 |53711| A| |D|0016 | A|49998|0114619 DRAWING DATA=7106772 |53711| A| |D|0017 | A|49998|0052571 DRAWING DATA=7106772 |53711| A| |D|0018 | A|49998|0071092 DRAWING DATA=7106772 |53711| A| |D|0019 | A|49998|0090268 DRAWING DATA=8627801 |53711| A| |D|0001 | |49998|0189472 DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=ISO\_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=SS800-AG-MAN-010/P-9290 | | |A |200324|A| |42| DOCUMENT REF DATA=T9074-AD-GIB-010/1688 | | |1 |120713|A| | | DOCUMENT REF DATA=T9074-BD-GIB-010/0300 | | |2 |121218|A| | | 3\. REQUIREMENTS 3.1 ;The COVER ASSY, LOT LWR must be manufactured in accordance with NAVSEA Drawing 7106772, P/N B1 and all invoked liabilities, except as amplified or modified herein.; 3.2 ;Hernon Manufacturing, Inc. Nuts N Bolts 234, ASTM D5363, Designation AN0143 m must be used as a thread compound for General Note 26.; 3.3 ;P/N 71 must be procured in accordance with NAVSEA drawing 8627801, Piece 2.; 3.4 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;RING GASKET CAST, P/N 52; Material - ;T9074-BD-GIB-010/0300, Appendix D, Grade HY-100; Part - ;HEAD DISHED HATCH COVER, P/N 53; Material - ;T9074-BD-GIB-010/0300, Appendix B, Type II, Grade HY-100; Part - ;HUB CAST, P/N 54; Material - ;T9074-BD-GIB-010/0300, Appendix D, Grade HY-100; Part - ;STIFFENER PLATE, P/N 59, 60, 61; Material - ;T9074-BD-GIB-010/0300, Appendix B, Type I, Grade HY-100; 3.5 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below. Test - Quality Conformance/Compliance Inspection Item - ;Appendix B HY-100 starting material; Performance - ;T9074-BD-GIB-010/0300; Acceptance - ;T9074-BD-GIB-010/0300; Test - Quality Conformance/Compliance Inspection Item - ;Appendix D HY-100 starting material; Performance - ;T9074-BD-GIB-010/0300; Acceptance - ;T9074-BD-GIB-010/0300; Test - ;Ultrasonic Inspection; Item - ;Starting material (over one-half inch thick for HEAD DISHED HATCH COVER, P/N 53); Performance - ;T9074-BD-GIB-010/0300; Acceptance - ;T9074-BD-GIB-010/0300; Test - Magnetic Particle Inspection Item - ;RING GASKET CAST, P/N 52 and HUB CAST, P/N 54; Performance - T9074-AS-GIB-010/271 and MIL-STD-1688 Acceptance - MIL-STD-1688 Test - ;Magnetic Particle Inspection; Item - ;Joints: J0103, J0104, J0105, J0106, J0107, J0108, J0109, J0110, J0111, J0113 Surfaces: S0136, S0137, S0138, S0139, S0140, S0141, S0142, S0143, S0144, S0145, S0146, S0147, S0148, S0149, S0150; Performance - ;T9074-AD-GIB-010/1688; Acceptance - ;T9074-AD-GIB-010/1688; Test - ;Liquid Penetrant Inspection; Item - ;Joints: J0117, J0125, J0126, J0127; Performance - ;T9074-AD-GIB-010/1688; Acceptance - ;T9074-AD-GIB-010/1688; 3.6 Radiography is required on ;P/N 52, P/N 54, and joint J0109\. Radiography is required for weldments and must be identified to the weld joint; . 3.7 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.8 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.8.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.8.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22\. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222\. 3.8.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.9 Certification is required for the following as identified further below: - Process Control Plan - Qualification Plan - Qualification Testing (First Article) All manufacturing facilities which have been approved to an earlier revision of this specification are required to meet the recertification requirements of T9074-BD-GIB-010/0300 Revision 2\. An updated Process Control Plan incorporating any changes necessary to meet the requirements of T9074-BD-GIB-010/0300 Revision 2 must be submitted. Re-certification of the first article approval of vendor facilities, processes, and manufacturing methods is required every 5 years and must meet all the requirements of T9074-BD-GIB-010/0300\. The certification must be current at the delivery date of procured products. 3.9.1 Qualification Testing (First Article Inspection) - See DI-NDTI-80809 (First Article Test Report) - Certification is required for the following test on the items listed below: Test - First Article Inspection Item - ;HY-100 Starting Material; Performance - T9074-BD-GIB-010/0300 Acceptance - T9074-BD-GIB-010/0300 Previous FAT approvals that were based upon previous specifications are not valid for meeting the requirements of T9074-BD-GIB-010/0300 Revision 2, unless otherwise approved by NAVSEA. The Contractor may request the FAT submission requirement be waived by providing the PCO with evidence of NAVSEA approval, provided it meets the requirements of this contract/purchase order. 3.9.2 Process Control Plan - See DI-NDTI-80809 (Process Control Plan) - Certification is required for the following attribute on the items listed below: Attribute - Process Control Plan Item - ;HY-100 Starting Material; Performance - T9074-BD-GIB-010/0300 The PCP must be reviewed and approved by NAVSEA prior to initiating First Article Testing. The Contractor may request the PCP submission requirement be waived by providing the PCO with evidence of NAVSEA approval. 3.9.3 Qualification Plan - See DI-NDTI-80809 (Qualification Plan) - Certification is required for the following attribute on the items listed below: Attribute - Qualification Plan Item - ;HY-100 Starting Material; Performance - T9074-BD-GIB-010/0300 The QP must be reviewed and approved by NAVSEA prior to initiating First Article Testing. The Contractor may request the QP submission requirement be waived by providing the PCO with evidence of NAVSEA approval. 3.10 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.11 Welding - When welding processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with T9074-AD-GIB-010/1688 by personnel and procedures qualified under S9074-AQ-GIB-010/248 for all production and repair welding and brazing. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding. 3.12 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.12.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.12.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.12.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. 

<!-- mobian-agent-ad sponsored="true" id="4b48031b-50f7-451b-b010-2462a51d2f0e" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


[Source notice](https://sam.gov/workspace/contract/opp/adea81a44e1c46428c326d524d43a1b6/view)

[More from United States Department of the Navy posted in February 2025](/dept%5Fof%5Fthe%5Fnavy/archive/2025-02)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"20--COVER ASSY, LOT LWR","description":"CONTACT INFORMATION|4|N743.43|WWV|717-605-3992|NOELLE.M.SMITH10.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|SEE SPECIFICATIONS SECTION C \u0026 E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|N00104|TBD|TBD|N50286|TBD|||N/A|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|ONE YEAR|365 DAYS AFTER THE LAST DELIVERY UNDER THIS CONTRACT||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)|13|314994|1000|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| The hour and date specified for receipt of offers has been extended to 4:30PM EST on 28 March 2025. \\ 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2.The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS 6 working days after receipt Final delivery of material (450 days) \\ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.1.1 DSSP Scope of Certification Material - Material Control Division ;(A); applies to this material. 1.1.2 This ;COVER ASSY, LOT LWR; contains non-metallic materials which must satisfy the toxicity and flammability requirements of NAVSEA SS800-AG-MAN-010/P-9290. Use of any material other than that specified requires special engineering approval and may require testing. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 \"Document References\" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.2 Specification Revisions - The specification revisions listed under \"Documents References\" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.3 Documents, drawings, and publications supplied are listed under \"Drawing Number\". These items should be retained until an award is made. DRAWING DATA=HBLANK-A151 |53711| D|ER |D|0001 | |49998|0240589 DRAWING DATA=H547-0291A01 |53711| A|ER |D|0001 | A|49998|0045988 DRAWING DATA=H547-0291A01 |53711| A|ER |D|0002 | A|49998|0083897 DRAWING DATA=H547-0291A01 |53711| A|ER |D|0003 | A|49998|0045963 DRAWING DATA=H547-0291A01 |53711| A|ER |D|0004 | A|49998|0031076 DRAWING DATA=H547-0291A06 |53711| A|ER |D|0001 | A|49998|0037384 DRAWING DATA=H547-0291A06 |53711| A|ER |D|0002 |...","url":"https://matchawards.com/dept_of_the_navy/posts/113962923386860097","identifier":"N0010425QFB30","category":"336612 - Boat Building","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"2040 - MARINE HARDWARE AND HULL ITEMS"}],"availabilityStarts":"2026-05-06","availabilityEnds":"2026-05-27","validThrough":"2026-05-27T23:59:59-04:00","sameAs":"https://sam.gov/workspace/contract/opp/adea81a44e1c46428c326d524d43a1b6/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Manufacturing","item":"https://matchawards.com/contracts/manufacturing"}]}
```

