<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_navy/posts/113868317682143577" -->

---
title: Deck Tile Covering System (Ripout/Install)_Rev4 | Closed - MatchAwards
description: Deck Tile Covering System (Ripout/Install)_Rev4. United States Department of the Navy. Solicitation N3904025Q0015. NAICS 336611 - Ship Building and Repairing. Total small business set-aside. Deadline 2025-03-18. COMBINED SYNOPSIS/SOLICITATION NOTICE: Requirement Title: Replacement of the current...
canonical: https://matchawards.com/dept_of_the_navy/posts/113868317682143577
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Deck Tile Covering System (Ripout/Install)_Rev4 | Closed
og:url: https://matchawards.com/dept_of_the_navy/posts/113868317682143577
og:description: Deck Tile Covering System (Ripout/Install)_Rev4. United States Department of the Navy. Solicitation N3904025Q0015. NAICS 336611 - Ship Building and Repairing. Total small business set-aside. Deadline 2025-03-18. COMBINED SYNOPSIS/SOLICITATION NOTICE: Requirement Title: Replacement of the current...
og:image: https://matchawards.com/system/accounts/avatars/000/000/085/original/a0262fe00d6c038b.png?1638992122
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Deck Tile Covering System (Ripout/Install)\_Rev4

Status

Closed, the response deadline passed on Mar 18, 2025

Agency

[United States Department of the Navy](/dept%5Fof%5Fthe%5Fnavy)

Office

PORTSMOUTH, USA

Notice type

Combined Synopsis/Solicitation

Solicitation number

N3904025Q0015

NAICS

[336611 - Ship Building and Repairing](/groups/565)

PSC

2040 - MARINE HARDWARE AND HULL ITEMS

Set-aside

[Total Small Business Set-Aside (FAR 19.5)](/contracts/small-business)

Posted

2025-03-14

Deadline

2025-03-18

Place of performance

Kittery, 03904

## Description

COMBINED SYNOPSIS/SOLICITATION NOTICE: Requirement Title: Replacement of the current Deck Covering System Solicitation Number: N3904025Q0015 Response Deadline: 1/30/2025 05:00 PM ET - EXTENDED TO 2/5/2025 5:00PM ET - EXTENDED TO 2/5/2025 11:59 ET - EXTENDED TO 3/18/2025 5:00PM ET POC: Alyssa Cress, (207) 994-0740, Alyssa.a.cress.civ@us.navy.mil GENERAL INFORMATION: 1\. This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued Paper copies of this solicitation will not be available. 2\. This solicitation documents and incorporates provisions and clauses in effect through FAC 2025-03 and DFARS Change Notice 2025-0117\. It is the responsibility of the contractor to be familiar with the applicable clauses and provisions. The clauses may be accessed in full text at these addresses: https://www.acquisition.gov/browse/index/far and http://www.acq.osd.mil/dpap/dars/change\_notices.html 3\. This solicitation is being issues as a(n): Request For Quotation (RFQ) 4\. The Navy intends to award a firm, fixed price contract to the vendor who is evaluated to provide the best possible service IAW the SOW utilizing a price/technical tradeoff method as the source selection technique in accordance with FAR 15.101-1\. 5\. North American Industry Classification System Code (NAICS): 336611 6\. Product Service Code (PSC): 2040 7\. The size standard is: 1300 (Size standards in number of employees) REQUIREMENT INFORMATION: The Portsmouth Naval Shipyard requests responses from sources capable of providing the following: Remove/Replace Vinyl and Wet Deck Covering Systems IAW SOW RDD: 14 days after receipt of Notice to Proceed Rip out to occur approx. May of 2025 Rip out schedule of spaces to be determined with the ship Re-install to occur approx. January 2026 Place of Performance: Portsmouth Naval Shipyard, Kittery, ME 03904 ATTACHMENTS: Statement of Work (SOW) N3904025Q0015 Request for Quote (RFQ) Quality Assurance Surveillance Plan (QASP) Enclosure 2 PNSY OPSEC Contract Requirements 24-138 METHOD OF PROPOSAL SUBMISSION: Quotes shall be emailed. All responsible sources may submit a quote which shall be considered by the agency. System for Award Management (SAM): Vendors must be registered in the SAM database to be considered for award. Registration is free and can be completed on-line at http://www.sam.gov/. All quotes shall include this form filled out in its entirety, any pricing breakdown that explains the quote, and any technical information needed for technical evaluation. REVISION 1 TO ANSWER THE FOLLOWING QUESTIONS: Q: Could you confirm the period of performance, we are still not sure if the work is required to be done this year or next year. Ideally, we want to come start and be able to finish and mobilize one-time to site. A: the POP outlined in the RFQ is accurate; it is essential for this work to be performed in two visits. Q: Can you confirm if you have pics of the designated areas? A: Pictures are not available. Q: Are there any interferences in the areas that need to be removed? A: There are various small interferences that you as the WIL will have to be notified when they need to be removed so you can coordinate to have either shipyard or ships force personnel remove them. There are also some areas that might have to be worked underneath components/desks that sit at various heights above the deck. Q: Will Navy ensure all personal items are removed prior to work starting? A: Personal items should be removed prior. Q: Will we be provided a staging area? A: Staging area will be negotiated space is limited so depends on how much they want and cant guarantee how close to the sub it will be. Q: Are we removing all deck covering and going down to bare metal? A: All deck tile and deck leveler at least down to the paint layer will be removed. Most paint comes up when chipping up the deck leveler and it becomes down to bare steel and that is OK. If there is paint residue left that is also OK, as the paint is set to be prepared by shipyard personnel at a later date prior to reinstall. REVISION 2 TO EXTEND THE SOLICITATION DEADLINE TO 5:00 PM EST ON 2/5/2025 REVISIONS 3 TO CLARIFY THE FOLLOWING & EXTEND THE SOLICIATION DEADLINE TO 11:59 EST IB 2/5/2025: Q: Can the removal be accomplished all the same time? (meaning every space be available to be worked) over a period of approx. 1 month. Then come back when ready to re-install? A: All of the spaces will not be available at once. There will be other work going on. Contractor will have to work around any high priority work. We will work with the vendor on spaces available. In addition, there will be critical passageways that wont be able to be completely blocked off, they will have to do part of the passageway at a time so people can still pass through if necessary. With the processes and requirements for tenting work areas due to environmental and/or potential hazmat reasons, as well as the possibility that certain spaces wont be available due to conflicting work, I would doubt it would be able to be done in 1 month. However, the number of personnel the vendor plans on using and their proficiency and knowledge would influence this greatly. Working at night will allow the greatest ability to progress work. REVISION 4 TO ADJUST CLIN STRUCTURE, EXTEND DEADLINE OF SOLICITATION, AND INCLUDE MORE DETAILS ON REQUIREMENT - THESE CHANGES ARE SUMMARIZED ON REV4 SOLICITATION DETAILS ATTACHMENT - PLEASE FILL OUT AND SUBMIT THIS DOCUMENT WITH INFORMATION REQUESTED WITHIN AND BELOW BY 3/18/25 @ 5:00 PM EST TO BE CONSIDERED FOR THIS OPPORTUNITY: This work is being performed at Portsmouth Naval Shipyard in Kittery, ME aboard a 688 Class Submarine. Work will be performed in two main phases: removal and installation. Each phase is broken up in sections, listed below. Each section will be released to the contractor to perform work in an order determined by the project dependent upon current work being performed. The Government will make the best effort to have spaces available to allow the contractor to finish all work without delays or disruptions to the maximum extent practicable. The approximate arrival for the Removal Phase of work is 5/1/25 and duration is estimated to take 4 months, however, this will be dependent upon work progress and availability of sections, there is the change that these dates could slip or move based on progress or unforeseen changes. The contractor is responsible for containing debris during this phase. PLEASE READ SOW FOR FULL LIST OF CONTRACTOR RESPONSIBILITIES. The approximate arrival for the Installation Phase of work is 4/1/26 and duration is estimated to take 6 months, however, this will be dependent upon work progress and availability of sections, there is the change that these dates could slip or move based on progress or unforeseen changes. The contractor is responsible for providing a covering after installation to protect the newly installed decking. PLEASE READ SOW FOR FULL LIST OF CONTRACTOR RESPONSIBILITIES. 

<!-- mobian-agent-ad sponsored="true" id="0ef8cb77-0179-4f84-a1cd-90e378856847" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0e606bc03c864f19b752fa93982b7400/download)
* [Attachment 2](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3299a1d7f7294d3c9d9df8f830180d19/download)
* [Attachment 3](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/91d6c1744849483e8cd5a4e73d9ca603/download)
* [Attachment 4](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/dd63f2391b224626ad333941489023c7/download)

[Source notice](https://sam.gov/opp/cb194b37c2b14a819cd7bb5b9817e1be/view)

[More from United States Department of the Navy posted in January 2025](/dept%5Fof%5Fthe%5Fnavy/archive/2025-01)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Small Business Set-Aside Government Contracts Available Now](/contracts/small-business)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Deck Tile Covering System (Ripout/Install)_Rev4","description":"COMBINED SYNOPSIS/SOLICITATION NOTICE: Requirement Title: Replacement of the current Deck Covering System Solicitation Number: N3904025Q0015 Response Deadline: 1/30/2025 05:00 PM ET - EXTENDED TO 2/5/2025 5:00PM ET - EXTENDED TO 2/5/2025 11:59 ET - EXTENDED TO 3/18/2025 5:00PM ET POC: Alyssa Cress, (207) 994-0740, Alyssa.a.cress.civ@us.navy.mil GENERAL INFORMATION: 1. This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued Paper copies of this solicitation will not be available. 2. This solicitation documents and incorporates provisions and clauses in effect through FAC 2025-03 and DFARS Change Notice 2025-0117. It is the responsibility of the contractor to be familiar with the applicable clauses and provisions. The clauses may be accessed in full text at these addresses: https://www.acquisition.gov/browse/index/far and http://www.acq.osd.mil/dpap/dars/change_notices.html 3. This solicitation is being issues as a(n): Request For Quotation (RFQ) 4. The Navy intends to award a firm, fixed price contract to the vendor who is evaluated to provide the best possible service IAW the SOW utilizing a price/technical tradeoff method as the source selection technique in accordance with FAR 15.101-1. 5. North American Industry Classification System Code (NAICS): 336611 6. Product Service Code (PSC): 2040 7. The size standard is: 1300 (Size standards in number of employees) REQUIREMENT INFORMATION: The Portsmouth Naval Shipyard requests responses from sources capable of providing the following: Remove/Replace Vinyl and Wet Deck Covering Systems IAW SOW RDD: 14 days after receipt of Notice to Proceed Rip out to occur approx. May of 2025 Rip out schedule of spaces to be determined with the ship Re-install to occur approx. January 2026 Place of Performance: Portsmouth Naval Shipyard, Kittery, ME 03904 ATTACHMENTS: Statement of Work (SOW) N3904025Q0015 Request for Quote (RFQ) Quality Assurance Surveillance Plan (QASP) Enclosure 2 PNSY OPSEC Contract Requirements 24-138 METHOD OF PROPOSAL SUBMISSION: Quotes shall be emailed. All responsible sources may submit a quote which shall be considered by the agency. System for Award Management (SAM): Vendors must be registered in the SAM database to be considered for award. Registration is free and can be completed on-line at http://www.sam.gov/. All quotes shall include this form filled out in its entirety, any pricing breakdown that explains the quote, and any technical information needed for technical evaluation. REVISION 1 TO ANSWER THE FOLLOWING QUESTIONS: Q: Could you confirm the period of performance, we are still not sure if the work is required to be done this year or next year. Ideally, we want to come start and be able to finish and mobilize one-time to site. A: the POP outlined in the RFQ is accurate; it is essential for this work to be performed in two visits. Q: Can you confirm if you have pics of the designated areas? A: Pictures are not available. Q: Are there any interferences in the areas that need to be removed? A: There are various small interferences that you as the WIL will have to be notified when they need to be removed so you can coordinate to have either shipyard or ships force personnel remove them. There are also some areas that might have to be worked underneath components/desks that sit at various heights above the deck. Q: Will Navy ensure all personal items are removed prior to work starting? A: Personal items should be removed prior. Q: Will we be provided a staging area? A: Staging area will be negotiated space is limited so depends on how much they want and cant guarantee how close to the sub it will be. Q: Are we removing all deck covering and going down to bare metal? A: All deck tile and deck leveler at least down to the paint layer will be removed. Most paint comes up when chipping up the deck leveler and it becomes down to bare steel and that is OK. If there is paint residue left that is also OK, as the paint is set to be prepared by shipyard personnel at a later date prior to reinstall. REVISION 2 TO EXTEND THE SOLICITATION DEADLINE TO 5:00 PM EST ON 2/5/2025 REVISIONS 3 TO CLARIFY THE FOLLOWING \u0026 EXTEND THE SOLICIATION DEADLINE TO 11:59 EST IB 2/5/2025: Q: Can the removal be accomplished all the same time? (meaning every space be available to be worked) over a period of approx. 1 month. Then come back when ready to re-install? A: All of the spaces will not be available at once. There will be other work going on. Contractor will have to work around any high priority work. We will work with the vendor on spaces available. In addition, there will be critical passageways that wont be able to be completely blocked off, they will have to do part of the passageway at a time so people can...","url":"https://matchawards.com/dept_of_the_navy/posts/113868317682143577","identifier":"N3904025Q0015","category":"336611 - Ship Building and Repairing","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"2040 - MARINE HARDWARE AND HULL ITEMS"}],"availabilityStarts":"2025-03-14","availabilityEnds":"2025-03-18","validThrough":"2025-03-18T23:59:59-04:00","areaServed":"Kittery, 03904","sameAs":"https://sam.gov/opp/cb194b37c2b14a819cd7bb5b9817e1be/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Small business","item":"https://matchawards.com/contracts/small-business"}]}
```

