Maintenance, Repair, and Preservation of TWR 7 and 8

Status
Closed, the response deadline passed on Mar 21, 2025
Agency
United States Department of the Navy
Office
BREMERTON, USA
Notice type
Presolicitation
Solicitation number
N4523A25R1052
NAICS
336611 - Ship Building and Repairing
PSC
J019 - MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIPS, SMALL CRAFT, PONTOONS, AND FLOATING DOCKS
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
2025-03-19
Deadline
2025-03-21
Place of performance
Washington, UNITED STATES

Description

TWR-7

Length: 85 FT

Width: 21 FT 6 IN

Age: 16 YRS

Hull Type: Aluminum

Draft: 5 FT 8 IN

Full Displacement: 95 Tons

Light Load: 60 Tons

Scope Overview: Coordinate with the Contracting Officer, via the Contracting Officer’s Representative (COR) to have vessel delivered to the Contractor’s facility. Upon docking vessel, wash, and clean vessel. Remove all fendering and sweep blast clean and replace any broken or missing studs and related hardware, as well as doubler plating.  Sweep blast and touch up underwater hull. Remove and Install new FWD escape hatches and gaskets. Open, clean and inspect all tanks and voids including fuel, CHT and potable water tanks. Touch up preservation of main deck and bulwarks and pilot house. Install new multi-cable penetrations in the pilot house overhead. Accomplish overhaul of bow thruster and related testing. Overhaul hydraulic steering rams and related testing. Remove, clean and inspect shafts and reinstall with new seals and bearings and accomplish related testing. Replace legacy low pressure air compressor and related piping system. Replace HVAC system and related piping. Clean and inspect main engine heat exchangers. Overhaul and test genset alternators. Flush, clean and inspect chill water piping. Replace hull valves with new. Undock the vessel. Conduct Sea trials. Arrange and coordinate the delivery of the vessel back to the Government with the Contracting Officer via the COR.

TWR-8

Length: 85 FT

Width: 21 FT 6 IN

Age: 16 YRS

Hull Type: Aluminum

Draft: 5 FT 8 IN

Full Displacement: 95 Tons

Light Load: 60 Tons

Scope Overview: Coordinate with the Contracting Officer, via the Contracting Officer’s Representative (COR) to deliver the vessel to the Contractor’s facility. Upon docking vessel, wash, and clean vessel. Remove all fendering and sweep blast clean and replace any broken or missing studs and related hardware, as well as doubler plating.  Sweep blast and touch up underwater hull. Remove and Install new FWD escape hatches and gaskets. Open, clean and inspect all tanks and voids including fuel, CHT and potable water tanks. Touch up preservation of main deck and bulwarks and pilot house. Remove insulation and install new lagging and insulation in the pilot house overhead. Repair superstructure door and replace gasket and conduct operational test. Accomplish overhaul of bow thruster and related testing. Overhaul hydraulic steering rams and related testing. Remove, clean and inspect shafts and reinstall with new seals and bearings and accomplish related testing. Replace legacy low pressure air compressor and related piping system. Clean and inspect main engine heat exchangers. Overhaul and test genset alternators. Flush, clean and inspect chill water piping. Replace hull valves with new. Purchase and install new helm chair. Undock the vessel. Arrange and coordinate the delivery of the vessel back to the Government with the Contracting Officer via the COR.

The expected period of performance is scheduled to be 03 June 2025 to 21 November 2025.