INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) CONTRACT FOR MULTI‐ DISCIPLINE ARCHITECT‐ENGINEER (A‐E) SERVICES IN SUPPORT OF PROJECTS ON NUWC FACILITIES AT NAVAL UNDERSEA WARFARE CENTER NEWPORT DIVISION (NUWCDIVNPT), NEWPORT, RI.
- Status
- Closed, the response deadline passed on May 12, 2025
- Agency
- United States Department of the Navy
- Office
- NEWPORT, USA
- Notice type
- Presolicitation
- Solicitation number
- N6660425R0221
- NAICS
- 541310 - Architectural Services
- PSC
- C1AZ - ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER ADMINISTRATIVE FACILITIES/SERVICE BUILDINGS
- Category
- Construction Related Services (4.2)
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Posted
- 2025-04-29
- Deadline
- 2025-05-12
- Place of performance
- Newport, Rhode Island 02841, UNITED STATES
Description
IT IS ANTICIPATED THAT A FORMAL SOLICITATION WILL BE ISSUED WITHIN 30 DAYS OF THIS PRE-SOLICITATION NOTICE. NO RESPONSE IS REQUIRED FOR THIS NOTICE.
PRE SOLICITATION NOTICE FOR N66604-23-RFPREQ-NPT-10-0243 INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) CONTRACT FOR MULTI‐ DISCIPLINE ARCHITECT‐ENGINEER (A‐E) SERVICES IN SUPPORT OF PROJECTS ON NUWC FACILITIES AT NAVAL UNDERSEA WARFARE CENTER NEWPORT DIVISION (NUWCDIVNPT), NEWPORT, RI.
Description: ALL INFORMATION NEEDED FOR INTERESTED PARTIES TO SUBMIT A STANDARD FORM SF 330, ARCHITECT ENGINEER QUALIFICATIONS IS CONTAINED HEREIN. THERE IS NO SEPARATE REQUEST FOR PROPOSALS (RFP) PACKAGE TO DOWNLOAD.
Background:
The Naval Undersea Warfare Center Newport Division (NUWCDIVNPT) requires A-E services in support of various projects at NUWCDIVNPT. This procurement will result in one Single-Award IDIQ contract for multi‐discipline A‐E services for planning, design, construction, evaluation of new construction, and renovation projects. These services will be procured in accordance with 40 United States Code (USC) Chapter 11, Selection of Architects and Engineers, as implemented by Federal Acquisition Regulation (FAR) Subpart 36.6. The IDIQ contract will be for a five-year ordering period. The maximum value for the contract term, including all awards, shall not exceed $5,000,000. The guaranteed minimum for the contract ordering period is $500 and will be satisfied by simultaneous award of the initial task order with the basic contract. Firm‐Fixed Price Task Orders will be negotiated at the Task Order level. In accordance with FAR 15.404-4(c)(4)(i)(B), the contract price or the estimated cost and fee for production and delivery of designs, plans, drawings, and specifications shall not exceed 6 percent of the estimated of construction of the public work or construction, excluding fees. There will be no minimum dollar limits per task order. The maximum dollar limit per task order is $3,000,000.
This proposed contract is being solicited as a Small Business Set-aside. The North American Industry Classification System (NAICS) Code is 541310, Architectural Engineering Services, and the Small Business size standard is $8,000,000. The Government seeks the most highly qualified firm to perform the required services, based on the demonstrated competence and qualifications, in accordance with the selection criteria included herein.
Comprehensive A‐E services are required for the new construction, repair, replacement, demolition, alteration, and/or improvement of facility projects. Projects may include single or multiple disciplines, such as: structural, civil, mechanical, electrical, architectural, planning, environmental, fire protection, cost estimating, and/or geotechnical. The types of projects may include: building renovations; building additions; site work required to support new work; new construction; parking areas; foundations; retaining walls; failure investigation including destructive and non‐destructive testing; seismic evaluation and design; progressive collapse analysis; blast resistant design; structural engineering investigations; utility systems including sanitary and storm; mechanical services; electrical services; water systems; storm water management; surveying; pavement design; and civil engineering studies.
Performance Location(s):
Newport, RI
Requirements:
For complete details on this requirement See Attachment 1, “SAES.” Specific types of A‐E services that may be required under this contract include:
-
-
- Facility planning and project development: Services may include work such as the following: Prepare master plans, project/site plans for proposed facility/infrastructure projects. Facility planning may be requested for renovation, addition, repair and new construction projects.
- Development of Design‐Bid‐ Build (DBB) packages: Services may include preparation of drawings and specifications for renovation, addition, repair or new construction projects. Design meetings with the government may be required in order to agree on design solution(s) that meet the government’s project requirements.
- Development of Design‐Build (DB) Request for Proposal (RFP) packages: Services may include working with a construction manager as part of a design-build team to prepare drawings and specifications for renovation, additions, repair or new construction projects. Design meetings with the government may be required in order to agree on design-build solution(s) that meet the government’s project requirements.
- Preparation of cost estimates using unit guidance and parametric cost estimating: Services may include preparing cost estimates for renovation, addition, repair and/or new construction projects based on prepared design documents.
- Development of alternatives and economic analysis: Service may include providing alternate design solutions and associated economic impacts for renovation, addition, repair or new construction projects.
- Condition assessment: Services may include performing studies of existing buildings and/or components of buildings to validate existing conditions that may then be used to inform future proposed design solutions. Site visits may be required to document existing facility/infrastructure conditions.
- Field investigations (including utility and geotechnical): Services may include conducting field surveys/investigations of existing sites, buildings or specific components of a building (i.e HVAC or electrical systems) in order to document current status of a facility’s infrastructure. The results of any field investigations may then be used to assist with the preparation of design documents for a particular project.
- Surveying and mapping: Services may include surveying and/or mapping of existing or proposed sites for a new construction project or building addition. Survey work may be required in order to document existing site conditions to support site/civil design solutions.
- Preparation of engineering evaluations: Services may include performing engineering calculations to support civil, mechanical, electrical, plumbing or fire protection design solutions.
- Incorporation of sustainable engineering design practices: Services may include incorporation of design principles for renovation, addition, repair and/or new construction projects to support sustainable design solutions.
- Consultations: Services may include collaborating with other specialty design professionals to offer and propose design solutions required to respond to unique project requirements.
- Energy computations; Services may include preparation of energy calculations to verify proposed design solutions comply with required building codes, federal, state and/or local energy requirements.
- Soil borings: Services may include conducting soil boring testing in order to identify minimum design requirements for new construction projects or building additions.
- Obtaining permits and regulatory approvals: Services may include submitting design documents to local, state and/or federal jurisdictions for review and approval prior to proceeding with renovation/construction work.
- Environmental investigation and consultation: Services may include providing design services required to meet environmental/EPA regulations on facility/infrastructure projects and providing consultation(s)/collaboration with the government to discuss acceptable environmental design alternatives and solutions.
- Review of contractor submittals: Services may include review of project submittals (such as product data or product samples) in order to validate proposed materials/products comply with design drawings and/or specifications.
- Field consultation and inspection during construction: Services may include responding to contractor RFI’s during construction in order to address design questions that may arise during construction/renovation projects.
- Commissioning: Services may include supporting the commissioning process by attending commissioning meetings in order to validate engineered design solutions are incorporated into the project in accordance with design specifications.
- Operation and Maintenance Support Information (OMSI): Services may include providing the government with O&M documentation and training, where applicable, based on the final design solution and construction.
- As‐built drawing preparation: Services may include updating design documents including drawings and specifications to accurately reflect construction field changes and document final as-built construction/renovation projects.
- Functional Analysis Concept Development (FACD)/design charrette/other design and construction related workshops and meetings: Services may require attendance at design meetings to collaborate with government representatives to consider design options and build consensus regarding preferred design solution(s).
-
Document Deliverable Requirements:
CDRL Number
Title
Sub-title
CDRL A001
Contractor’s Personnel Roster
Contractor Personnel
CDRL A002
Hazardous Materials Management Program (HMMP) Plan
Facility Operations Inventory HMMP Plan
CDRL A003
Monthly Status Report
Monthly Status Report
CDRL A004
Product Drawings/Models and Associated Lists
Drawing Package
CDRL A005
Manhour Estimate, Technical Cost Proposal
Estimates and Proposal
CDRL A001 – CONTRACTOR’S PERSONNEL ROSTER
Within ten business days of Task Order issue, the Contractor shall submit a list of all employees working on the project to the Contracting Officer. This list shall include each employee's name, and work assignment. Changes to the personnel list shall be submitted at least ten business days in advance. In emergency situations and cases of adverse actions where ten business days’ notice is not possible, the Contractor shall submit the required information regarding the change in writing to the Contracting Officer Representative (COR) not later than 24 hours after the replacement employee is on board.
CDRL A002 – HAZARDOUS MATERIALS MANAGEMENT PROGRAM (HMMP) PLAN
The Contractor shall submit a Hazardous Material Management Plan (HMMP) as addressed in Paragraph 3.2 of the SAES.
CDRL A003 – MONTHLY STATUS REPORT
Contractor shall provide a Monthly Status Report for each project in which the support was provided. The report shall discuss major impacts, issues, and steps for remediation of issues, proposals to improve operational efficiencies, effectiveness, quality, or the customer experience.
CDRL A004 – PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS
The Contractor shall develop and deliver drawings, specifications, architect / engineering reports, to the Technical Point of Contact upon request.
CDRL A005 – MANHOUR ESTIMATE, TECHNICAL COST PROPOSAL INSERT TITLE
A‐E firms shall prepare cost estimates utilizing the Micro‐Computer Aided Cost Estimating System (MCACES) MII estimating system. Specifications shall be prepared in the Specifications‐Kept‐Intact (SPECSINTACT) program. Design‐build RFPs shall be prepared utilizing Design‐Build Masters, and drawings shall be prepared in AutoCAD (2016 or higher) utilizing the National Computer‐Aided Design and Drafting (CADD) Standards format. Three‐Dimension (3‐D) and BIM modeling may also be required. The Contractor shall provide documents in PDF format. Final documents shall be electronically signed by the assigned Architect or Engineer. All projects shall be designed in the modern international standard version of the metric International System of Units (SI), unless specifically exempted by the Statement of Work at the Task Order level.
Other Special Considerations:
As defined by Paragraph 1‐5 of United Facilities Criteria (UFC) 3‐ 600‐01, Fire Protection Engineering for Facilities, this contract requires the services of a licensed fire protection engineer or Consultant.
Asbestos and/or lead‐based paint assessments may be required on this contract to determine the presence of hazardous material during removals/demolition or at utility points of connections. Work on and around waterfront structures, including under deck and underwater, and work in confined spaces may be required on this contract. A‐E firms must be able to accept work that involves asbestos, lead paint, Poly‐Chlorinated Biphenyls (PCB)s, and other hazardous materials, work on and under waterfront structures, and in confined spaces.
All engineering and design services shall comply with the most current edition of Facilities Criteria (FC) 1‐300‐09N Design Procedures, and other requirements as indicated on the Whole Building Design Guide (WBDG) Web Site (www.wbdg.org). The selected A-E Contractor shall have online access to web‐based support programs capable of creating Auto-CAD documents for Government review, and email via the internet for routine exchange of correspondence. The selected A-E Contractor shall submit and maintain an A‐E Accident Prevention Plan (APP) in accordance with U.S.Army Corp of Engineers (USACE) EM 385‐1‐1 for each project on this contract and Activity Hazard Analysis (AHA) for each in‐field action. Key personnel, including Consultants, must be U.S. citizens.
A‐E firms are advised that the selected firm, its subsidiaries or affiliates, and its Consultants which design, prepare, or provide engineering services in support of construction contract documents cannot provide construction services for the same contract. This includes concept design, preparation of project programming documents (DD Form 1391), facility siting studies, environmental assessments, geotechnical services, engineering studies and services, design‐build Request for Proposals (RFPs), or other activities that result in identification of project scope and cost. The awarded contract will be subject to specific provisions addressing the avoidance of organizational conflicts of interest, including Naval Facilities Acquisition Supplement (NFAS) 5252.209‐9300, Organizational Conflicts of Interest. The prime firm for this contract will be required to perform throughout the contract term.
SUBMISSION REQUIREMENTS:
A‐E firms desiring to be considered for this contract shall submit a completed SF 330 package by email to the Contracting Officer and the Contract Specialist. The SF 330 shall be typed, at least 11 point Times New Roman or larger. Part I shall not exceed 100 single‐sided 8.5 by 11 inch pages (the page limit does not include Individual Subcontracting Reports (ISR)s, certificates licenses, nor does the page limit include cover sheets or dividers, provided that these do not contain any substantive information submitted in response to the synopsis or intended to demonstrate the qualifications of the firm). Part I pages shall be numbered sequentially. Introductions shall be included in Sections E and F. A-E firm submissions shall include its DUN & Bradstreet (DUNS), Commercial and Government Entity (CAGE), and Taxpayer Identification Number (TIN) numbers in Block 30 of the SF 330.
All Contractors are advised that registration in System for Award Management (SAM) Database is required prior to award of a contract. Failure to register in the SAM Database may render your firm ineligible for award. For more information, check the SAM Web site: https://www.sam.gov.
In accordance with the Federal Acquisition Regulations (FAR) 36.601‐4(b), the A‐E firm must be a registered and licensed architectural and/or engineering firm in Rhode Island to be eligible for award. A-E firms shall provide proof that the firm is permitted by law to practice the professions of architecture or engineering, (e.g., state registration number, or a brief explanation of the firm’s licensing in jurisdictions that do not register firms, etc.). Failure to submit the required proof will result in a firm’s elimination from consideration.
FIRMS WHO ARE OFFERING AS A JOINT VENTURE SHOULD INCLUDE WITH THEIR SUBMISSION A COPY OF THE JOINT VENTURE AGREEMENT. FAILURE TO INCLUDE THE JOINT VENTURE AGREEMENT WILL RESULT IN THE FIRM’S ELIMINATION FROM FURTHER EVALUATION.
If an SF 254/SF 255 is submitted for this solicitation, it will not be reviewed or considered. As required above, provide verifiable evidence that your firm is permitted by law to practice the professions of architecture or engineering (e.g., state registration number).
Interested firms shall submit proposals to BOTH the Contract Specialist and the Contracting Officer at the email addresses listed below.
SF 330 submissions are due no later than XX XXXXX 2023 at XX:XX pm (EST). Late responses will be handled in accordance with Federal Acquisition Regulations (FAR) 52.215‐1. The points of contact for this acquisition are Contract Specialist, XXXXX XXXXXX, at XXXXXXXXX@navy.mil and XXXXX XXXXXXX, Contracting Officer, at XXXXXXX@navy.mil. (TO BE PROVIDED WITHIN FORMAL SOLICITATION)
The total maximum file size for email proposal submission is limited to 10MB. If the submission will exceed 10MB, it is acceptable for the submission to be broken up into multiple emails OR the firm should coordinate with the identified Government POC's to obtain a DOD SAFE request for submission. Failure of the firm to coordinate a DOD SAFE request for submission in a timely manner, to allow sufficient time for submission of the required documents before the required response date, will NOT be acceptable justification for the Government allowing or considering a late submission. A timely manner is defined as requesting such DOD SAFE information from the identified Government POC's no later than 10 calendar days in advance of the response date of the synopsis.
If the firm chooses to complete multiple email submissions, emails shall clearly indicate the number of email submissions the Government should expect to receive AND shall be numbered to indicate which email of the submission each email received is (i.e.: Email 1 of 3; Email 2 of 3; Email 3 of 3).
Inquiries concerning this procurement should reference the solicitation number and title and be forwarded via email to the points of contact identified above. Questions pertaining to this requirement are due no later than fourteen (14) days after posting of this requir
Attachments
More from United States Department of the Navy posted in January 2025