DESIGN-BID-BUILD (DBB), B14 NEW STAIR/LIFE SAFETY/POWER IMPROVEMENTS PORTSMOUTH NAVAL SHIPYARD (PNSY), KITTERY, MAINE
- Status
- Closed, the response deadline passed on May 30, 2024
- Agency
- United States Department of the Navy
- Office
- NORFOLK, USA
- Notice type
- Solicitation
- Solicitation number
- N4008524R2534
- NAICS
- 236220 - Commercial and Institutional Building Construction
- PSC
- Y1AZ - CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
- Category
- Construction Related Services (4.2)
- Posted
- 2024-12-05
- Deadline
- 2024-05-30
- Place of performance
- Kittery
Description
This contract is for Design-Bid-Build (DBB) construction services for B14, New Stair/Life Safety/Power Improvements, Portsmouth Naval Shipyard (PNSY), Kittery, ME. The project will include a total interior renovation of the four-story 22,705 square foot historic Building 14. The building is in dire need of utility upgrade repairs and egress / fire life safety /accessibility compliance upgrades. The project will also address the need for exterior envelope repairs, structural upgrades and removal of lead paint and asbestos materials from the interior finishes. Site improvements include all paving, walks, and utility pads. Utility repairs include electrical, fire, water, sanitary services, connections, and utility relocations. The project will consist of a total interior renovation including: hazardous material removal and remediation; modifying or removing and replacing the building?s floors and supporting structure; adding two code compliant internal stairs; adding a building addition to house an elevator, stair and utility support spaces; providing storm windows within original window openings; restoring historic windows; provide lightening protection system; repointing and repairing the historic masonry walls; repairing and repainting historic trim; repairs to historic granite block; repairs and modifications to historic timber framing; providing offices, a locker room, conference and break rooms, and toilet rooms; and completely overhauling the building?s mechanical, electrical, and fire protection systems.Attachments
- Attachment 1
- Attachment 2
- Attachment 3
- Attachment 4
- Attachment 5
- Attachment 6
- Attachment 7
- Attachment 8
- Attachment 9
- Attachment 10
- Attachment 11
- Attachment 12
- Attachment 13
- Attachment 14
- Attachment 15
- Attachment 16
- Attachment 17
- Attachment 18
- Attachment 19
- Attachment 20
- Attachment 21
- Attachment 22
- Attachment 23
- Attachment 24
- Attachment 25
More from United States Department of the Navy posted in December 2024