81--SHIPPING AND STORAG, IN REPAIR/MODIFICATION OF
- Status
- Closed, the response deadline passed on Dec 13, 2024
- Agency
- United States Department of the Navy
- Office
- PHILADELPHIA, USA
- Notice type
- Solicitation
- Solicitation number
- N0038324QC541
- NAICS
- 332439 - Other Metal Container Manufacturing
- PSC
- 8145 - SPECIALIZED SHIPPING AND STORAGE CONTAINERS
- Category
- Package Delivery & Packaging (7.1)
- Posted
- 2024-11-22
- Deadline
- 2024-12-13
Description
CONTACT INFORMATION|4|N792.06|S8R|215-697-0275|patrick.j.horan23.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO TYPE ||TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)|12|332439|600||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| NAVSUP WSS has been granted a class deviation (CL-00-203) that permits us to use the award forms currently available in our automated procurement system instead of the SF 1449 when conducting procurements for commercial items. This procurement is being conducted in accordance with FAR Part 12, Acquisition of Commercial Products. Information appearing on the face of the DD Form 1155 or SF 26 that conflicts with clauses or provisions contained elsewhere in this solicitation shall be disregarded. Addendum to FAR 52.212-4 Contract Terms and Conditions Commercial Products Under paragraph(a) "Inspection and Acceptance" add the following: 1. FAR Clause 52.246-2 Inspection of Supplies-Fixed Price applies as amended herein. All product audits performed at the discretion of the DCMA QAR shall be conducted by witnessing contractor inspections or tests on a non-interference basis. erference basis. 2. The contractor shall maintain a quality system that addresses the elements of ISO9001-2000/AS9100B, Quality System Model for Quality Assurance in Design/Development, Production, Installation and Servicing, and a calibration system that addresses the elements of ISO-10012-1, ANSI/NCSL Z540 or an equivalent program approved by the Navy. 3. The government reserves the right to assess the contractor's compliance to its documented quality system throughout the performance of this contract. The quality system shall be made available to the government for their review and use. The acceptance of non-conforming supplies is a prerogative of and shall be as prescribed by the government. The government reserves the right to disapprove the quality system or portions there of when it fails to meet its intended objectives. eserves 4. The Contractor shall not make any configuration changes, engineering changes or part number changes to the contract/purchase order items, including, but not limited to, the item's hardware, software or firmware, unless approved by the Procurement Contracting Officer (PCO). In addition, approval by the appropriate technical authority may also be required. Guidance on how to submit a proposed engineering or part number change may be obtained from the PCO. 5. The Contractor shall not manufacture any item for acceptance by the Government that incorporates a known departure from technical or contractual requirements unless a request for a deviation has been approved. Authorized deviations are a temporary departure from the requirements only and do not authorize a change to the item's configuration baseline. Any deviation, major or minor, must be approved by the PCO prior to acceptance. The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. In addition to price, the following Non-price evaluation factor shall be used to evaluate offers and are listed in descending order of importance. Relevant Past Performance Technical Capability The non-price evaluation factors, when combined, are significantly more important than price. There are no subfactors. The Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government. Offerors lacking relevant past performance history will not be evaluated favorably or unfavorably on past performance. The Government will consider the quality of an offeror's relevant past performance. This consideration is separate and distinct from the Contracting Officer's responsibility determination. The assessment of the offeror's r relevant past performance will be used as a means of evaluating the relative risk of the offeror and other competitors in successfully meet the requirements of the RFP. In determining the rating for the past performance evaluation factor, the Government will give greater consideration to the contracts which the Government feels are most relevant to the RFP. The Government reserves the right to award the contract to other than the lowest priced offeror. Page Limitation-Excluding the cover page, table of contents, past performance project forms the technical capability proposal is limited to fifteen (25) pages in at least 11pt. font and 1" margins. Pages in excess of this limitation will not be evaluated. The pages excluded from evaluation will be at the discretion of the Agency. Contractors are informed that it is the Government's desire to make award on initial proposals when deemed possible by the Contracting Officer, however the Government reserves the right to communicate and/or negotiate with offerors if later determined necessary. None Price Proposal (all non-price factors) -The Contractor is required to submit the following non-price information: 1. Relevant Past Performance: The Contractor is provided an opportunity to demonstrate relevant past performance on contracts currently being performed or performed within the past three (3) years. The Government will determine relevance by analyzing the scope and magnitude of the reference contracts and comparing them to the instant requirement. The Government reserves the right to evaluate submitted projects individually or in the aggregate in order to determine relevance and will do so consistently across all evaluated offers. The Government will consider the quality of the Contractor's relevant past performance. Reference Contracts: a. The Contractor may submit up to a maximum of three (3) contracts for evaluation. The Government reserves the right to obtain information from sources other than those identified by the Contractor. 2. Technical Capability The government desires that offerors demonstrate technical capability to satisfy the government's requirements. The offeror's response will be evaluated to determine whether its response poses risk to performance or whether it will result in better value to the government. In response to this Evaluation Factor, offerors shall address its Manufacturing Equipment; Inspection Method Sheets; Incoming Inspection Sheets; Process Sheets; Quality System Compliance; Welding Certification. In responding to the above areas of the technical capability factor, it is incumbent upon the offeror provide a level of detail the demonstrates to the Government's satisfaction that the offeror has the technical capability to perform the requirement. If the proposal lacks sufficient detail, it may result in the government assessing risk in the proposal. While there is no prescribed method for demonstrating technical capability, the below are items of interest to the government that the contractor may, at its discretion, address to assist the government in gaining an understanding of the offerors technical capability. Offerors are cautioned that while these areas of interest are not mandatory elements that are required to be addressed, failure to address them or comparable indicia of technical capability, may limit the government's understanding of technical risk and result in the assignment of commensurate risk. Offerors are also notified that some of these indicia of capability are overlapping, i.e., two or more may evidence the same facet of capability. Certification of possession or access to the following equipment:For Aluminum and Steel Welded Containers, & Bladebox/riveted construction 1.Brake Press 2.Extrusion Dies 3.CNC machining center(s) capable of lathe and/or milling operations Copies of inspection method sheets used in-process and/or at final inspection Copies of incoming inspection documents that show material certificates of conformance, and if applicable, dimensional conformance Process/Operation sheets to show ability to conform to drawing requirements in the following areas: Weld preparation; Welding procedure specifications Production lot testing Proof of compliance to ISO9001, and/or, AS9100. Applicable up-to-date welder certifications showing highest-level certification obtained AWS D1.1 for steel, AWS D1.2 or MIL-W-22248,Class 4 for aluminum, AWS D1.3 for sheet steel and AWS D1.6 for stainless steel. If the offeror address any or all of the above, or provides comparable indicia of capability, it is encouraged to provide supporting evidence and detail, such as but not limited to receipts, certifications, drawings, test results/ logs, maintenance records, calibration records, inspection reports, audits, etc. The weigh accorded to supporting evidence will be at the discretion of the government. The Technical capability proposals will be evaluated to determine the risk of unsuccessful performance as well as relative risk compared to other offerors. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: ## 103 days after receipt of asset Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation:A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERSDELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. \ 1. SCOPE 1.1 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.2 Container shell material is ;Aluminum; . 1.3 When discrepancies exist between these requirements and those on current manufacturer's drawings,contact code ;buyer on page 1 of the contract; or code N241.10 1.4 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ? SEE SCHDULE/LINE ITEM?,and all details and specifications referenced therein. 1.5 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.5.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: SHIPPING AND STORAG ;6KH 8145 013574414; NSN , ;583E001; Part Number, Shall be performed IAW: SHIPPING AND STORAG ;AG-830AC-MEB-000 work package 025 00; Publication (s). 1.5.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 One third (1/3) unit of desiccant (MIL-D-3464, Type II nondusting) per cubic foot of container interior volume shall be placed in desiccant holder of each container at time of shipment. 3.2 Reference to Cadmium plating shall be deleted and the following substituted: "Finish shall be electrodeposited alkaline Zinc-Nickel Alloy in accordance with ASTM B 841 Class 1, Type B, Grade 3." All containers must be affixed with a nameplate that includes a Unique Identification (UID) marking as referenced in the drawing package Drawing ;(80132) 15930; and IAW Mil-STD-130 latest revision. The contractor shall contact NAVICP code ;contact buyer on page 1 of the contract; or code 0771.10 for the alphanumeric sequential serial number group that makes up part of the UID. The UIDwill be included on the nameplate in data matrix format. Contact code ;buyer on page 1 of the contract; or code N241.10 to arrange for First Article Test location When a First Article is required, the contractor shall submit a paper copy of the drawings (size 11" X 17"), contracts and approved ECP's ECO's, deviations waivers, and modifications in the records recepticle or inside the container submitted for the First Article. 3.3 Welding and welder qualifications shall be in accordance with AWS D1.1 for steel, AWS D1.2 or MIL-W-22248,Class 4 for aluminum, AWS D1.3 for sheet steel and AWS D1.6 for stainless steel. Proper controls shall be used to prevent melt through or burn through. For aluminum, filler for welding 6061 alloy shall be 4043: filler for welding 5000 series alloys to themselves or to 6061 shall be 5356 or 5556. In addition,welding and weld inspection shall include: (1) Visual inspection shall include 5X (5power) magnification when a suspect condition is to be examined beyond the capability of normal vision. (2) Critical and major welds may be subjected to further non destructive testing (such as dye penetrant inspection)as prescribed by the buying activity. (3) Proper documentation shall be available for review by Government personnel. 3.4 WORK INSTRUCTIONS. Work instructions shall be posted at theoperator's work station giving procedures to control the welding process, i.e., filler material, weld size, electrical and gas characteristics, including flow rate. 3.5 MATERIALS AND MATERIALS CONTROL. The quality program shall assure that the materials used in fabrication or processing, i.e., base metals and weld filler material, be inspected and conform to the applicable physical, chemical and other technical requirements (supplier's certification is sufficient). 3.6 CONTROLS. Weld filler materials shall be clearly identified and segregated from each other both when in storage and at the work station. Work station environment shall be controlled to prevent conditions adverse to proper gas shielding. 3.7 CLEANING. Parts to be welded shall be cleaned to remove surface soils such as oils, waxes, grease, inks, etc. except that uninhibited alkaline solutions such as sodium hydroxide shall NOT be used. 3.8 DEOXIDIZING. The cleaned parts shall be chemically deoxidized NO MORE THAN 10 DAYS PRIOR TO WELDING to remove thick surface oxide films. (If the material or work is exposed to an outdoor environment, this time limit shall be reduced to a maximum of 3 days, to account for atmospheric effects.) Mechanical cleaning methods shall be applied just prior to the actual start of welding, to remove any reoxidation or residual thin oxide films. 3.8.1 CHEMICAL TREATMENT. An acid deoxidizing treatment shall be applied by either immersion or brushing/wiping. Deoxidizers acceptable for use shall include nitric acid, sulfuric chromic, phosphoric chromic, or equivalent solutions. Sodium hydroxide solutions shall not be used. Care shall be taken to assure 100% solution coverage of the area to be welded. To allow an adequately sized deoxidized area for good welding, the solution shall be applied to an area extending at least 2 inches from the weld site, or ending at any closer adjacent edge. 3.8.2 MECHANICAL MEANS. Immediately prior to welding, mechanical cleaning methods shall be applied to the weld areas previously chemically treated to assure removal of residual or reformed oxides, if any. Acceptable methods of mechanical cleaning include stainless steel wire brushing, scraping, filing, or sanding. However, abrasives containing iron and its oxides, steel wool and wire, and copper alloy based wire, which may become embedded with galvanically active metals and accelerate corrosion of aluminum alloys shall NOT be used. Mechanical methods shall be vigorous enough to adequately remove any residual oxide films, but gentle enough to avoid forming an excessively rough surface in the comparatively soft metal underneath. 3.9 At faying surfaces, discontinuous welds, or other areas where atmospheric liquids may be retained by capillary action, the crevice shall be sealed using Sealing Compound MIL-S-81733 or equivalent. 3.10 The shock mount listed in the drawing package (whether identified as sole source, recommended, or suggested) has been tested and approved for the shock mitigation system of this container. No other shock mount may be substituted without written permission of Naval Inventory Control Point, Philadelphia unless an alternate is specifically indentified in this contract. ;No other mount; is an approved alternate mount. Welding and welder qualifications shall meet current AWS D1.2 standards. Additionally, cleaning preperations shall be in accordance with MIL-C-5541 and the cleaning paragraph located in the welding requirements section of the contract 3.11 1.0 GENERAL 3.11.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.12 2.0 DEFINITIONS. 3.12.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.12.2 OVERHAUL: An overhauled part is one which has been disassembled, cleanedMore from United States Department of the Navy posted in November 2024