<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_navy/posts/113400510168067159" -->

---
title: 34--ROD, WELDING (N0010422QFA07) | Closed - MatchAwards
description: 34--ROD, WELDING. United States Department of the Navy. Solicitation N0010422QFA07. NAICS 333992 - Welding and Soldering Equipment Manufacturing. Deadline 2024-11-14. CONTACT INFORMATION|4|N743.40|WVL|717-605-1842|DESIREE.D.MEYERS.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR...
canonical: https://matchawards.com/dept_of_the_navy/posts/113400510168067159
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: 34--ROD, WELDING (N0010422QFA07) | Closed
og:url: https://matchawards.com/dept_of_the_navy/posts/113400510168067159
og:description: 34--ROD, WELDING. United States Department of the Navy. Solicitation N0010422QFA07. NAICS 333992 - Welding and Soldering Equipment Manufacturing. Deadline 2024-11-14. CONTACT INFORMATION|4|N743.40|WVL|717-605-1842|DESIREE.D.MEYERS.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR...
og:image: https://matchawards.com/system/accounts/avatars/000/000/085/original/a0262fe00d6c038b.png?1638992122
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# 34--ROD, WELDING

Status

Closed, the response deadline passed on Nov 14, 2024

Agency

[United States Department of the Navy](/dept%5Fof%5Fthe%5Fnavy)

Office

MECHANICSBURG, USA

Notice type

Solicitation

Solicitation number

N0010422QFA07

NAICS

[333992 - Welding and Soldering Equipment Manufacturing](/groups/494)

PSC

3439 - MISCELLANEOUS WELDING, SOLDERING, AND BRAZING SUPPLIES AND ACCESSORIES

Category

[Machinery & Components (5.1)](/categories/industrial-products-and-services/machinery-and-components)

Posted

2024-10-30

Deadline

2024-11-14

## Description

CONTACT INFORMATION|4|N743.40|WVL|717-605-1842|DESIREE.D.MEYERS.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|INSPECTION: D ACCEPTANCE: D| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X|||X||||| VARIATION IN QUANTITY (APR 1984)|3|+10%|-10%|| TIME OF DELIVERY (JUNE 1997)|20|50 LBS|||||||||||||||||||| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT COMBO|N/A|TBD|N00104|TBD|N39040 CERTIFICATION; S4306A MATERIAL|N50286 pORTSMOUTH|TBD|133.2||N/A|CERTIFICATION N39040|||SS DD1423 OR SPECIFIED BY BLOCK 14A|| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|1 YEAR FROM DATE OF DELIVERY|365 DAYS AFTER ACCEPTANCE OF MATERIAL||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (SEP 2021)|13|333992|1,250|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||| EVALUATION CRITERIA AND BASIS FOR AWARD-|1|| 1\. The offer due date is updated to 21 October 2024\. 2\. The POC is updated to Amanda Bailey amanda.l.bailey50.civ@us.navy.mil. 3\. The Small Business Set-Aside is hereby dissolved. 4\. The quantity is updated to 500\. 5\. This procurement is issued pursuant to Emergency Acquisition Flexibilities. \\ This amendment is issued to extend closing to 28JUL23\. This amendment is issued to extend closing date to 05MAY23\. \\ This amendment is to extend the closing date to 16DEC22\. \\ This amendment is issued to extend the closing date to 09 SEP 2022\. \\ The purpose of this amendment is to extend the closing date to 10AUG22\. \\ Amendment issued to extend closing date to 17JUN22\. This amendment is issued to extend the closing date to 13 MAY 22\. \\ This amendment is issued to extend the closing date to 15 APR 22\. This amendment is to extend the closing date to 15 MAR 2022\. This amendment is to extend the closing date to 14 FEB 2022\. POC changed to benjamin.t.spangler.civ@us.navy.mil All prior offers shall be resubmitted to above POC or NECO. \\ 1\. DD1423 DATA ITEM AOO1 (INSPECTION AND TEST PLAN) MAY BE WAIVED IF ALREADY ON FILE AT NAVSUP WSS MECHANICSBURG. 2\. PORTSMOUTH NSY'S DODAAC HAS CHANGED FROM N00102 TO N50286\. ANY REFERENCE TO N00102 WITHIN THIS ORDER SHOULD BE UPDATED TO N50286\. 3.ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS,PURCHASE ORDERS,TASK ORDER,DELIVERY ORDER,& MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT CONSIDERED TO BE "ISSUES" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HERE IN. 4\. NAVSUP WSS MECH WILL BE CONSIDERING PAST PERFORMANCE IN THE EVALUATION OF OFFFERS. SEE CLAUSE 252.213-7000\. 5\. THE FOLLOWING PROPOSES DELIVERY SCHEDULE APPLIES: SUBMISSION ODF ALL CERTIFICATION DATA CDRLS 20 DAYS PRIOR TO DELIVERY. PNSY REVIEW/ACCEPTANCE OF CERTIFICATION CDRLS 6 WORKIG DAYS AFTER RECEIPT. 180 ACTUAL DAYS TO MANUFACTURE PART FINAL DELIVERY OF MATERIAL 365 DAYS DELIVERY DAYS AND PAST PERFORMANCE WILL BE EVALUATION FACTORS IN DETERMINING AWARDEE. 1\. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2\. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.2 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. DOCUMENT REF DATA=AWS A5.01 | | | |930101|A| | | DOCUMENT REF DATA=AWS A5.28 | | | |200630|A| | | DOCUMENT REF DATA=ISO\_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | 3\. REQUIREMENTS 3.1 Manufacture and Design - The item furnished under this contract/purchase order must meet the requirements as specified in AWS-A5.28, except as amplified or modified herein. AWS-A5.28 ordering data information is provided below: A. American Welding Society Specification AWS-A5.28; Low Alloy Steel filler metals for gas shielded arc welding. AWS Classification - ;ER70S-B2L; Size, Diameter - ;1/16 Inch; Spool Size, Weight - ;N/A; Cut Length - ;36 Inches; B. American Welding Society Specification AWS-A5.01; Filler Metal Procurement Guidelines. Lot Classification - Class S2 Intensity of Testing - Schedule J 3.2 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing (if any) per applicable specifications is still required, but certifications are only required as listed below. Test - ;Quality Conformance/Compliance Inspection (Includes Chemicals and Mechanicals); Item - ;Rod, Welding; Performance - ;AWS A5.01 and AWS A5.28; Acceptance - ;AWS A5.01 and AWS A5.28; 3.3 Container Size - Welding Electrodes must be supplied in ;10; pound containers. 3.4 Welding Electrode Strip Heaters - Electrical resistance rod-type or pad-type heaters (i.e. strip heaters) that are controlled automatically by thermocouples or manually by an on-off switch must be used to maintain preheat/interpass temperatures within the required range before and during welding of the usability (i.e. soundness) test plate and the mechanical property (when required) test plate. The test plate must be insulated or separated from the work bench. OXY-FUEL heating of any test plate is not permitted. 3.5 Radiography - Radiography is required for test weldments and must be performed in accordance with T9074-AS-GIB-010/271 as modified by AWS-A5.28\. Acceptance criteria must be AWS-A5.28\. 3.6 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government inelectronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.6.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to theoperational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.6.2 Requests for Waivers/Deviations for NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic Contractor Data Submission) system at https://register.nslc.navy.mil/ 3.6.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of theproduct. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineeringchange. 3.7 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.8 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.9 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025\. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.9.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.9.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.9.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.9.4 This contract provides for the performance of Government Quality Assurance at destination. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. 3.9.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO. 3.10 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.10.1 The supplier's gages, measuring and test equipment must be made available for use by the Government when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.10.2 All documents and reference data applicable to this contract must be available for review by the Government. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government. 3.11 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Prime Contractor who will notify the PCO so that appropriate planning for Government inspection can be accomplished. 3.11.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document. 3.11.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.11.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract. 3.11.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government. 3.11.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier. 3.12 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.12.1 Visual examination upon receipt to detect damage during transit. 3.12.2 Inspection for completeness and proper type. 3.12.3 Verification of material quality received. 3.12.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.12.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.12.6 Identification and protection from improper use or disposition. 3.12.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.12.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.12.9 Material returned to the contractor must be handled as GFM. 3.13 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3, Section C of this contract/purchase order. 3.13.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein and elsewhere in this Contract/Purchase Order. 3.14 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the unit containers. This traceability marking must provide direct traceability to the material's chemical composition and mechanical properties certification data. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3\. 

<!-- mobian-agent-ad sponsored="true" id="426a5270-1574-489a-b522-ec6f8d99ca70" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/industrial-products-and-services/machinery-and-components?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


[Source notice](https://sam.gov/opp/ebc52d8e77ad4f16b252f6c0cb95f6a1/view)

[More from United States Department of the Navy posted in October 2024](/dept%5Fof%5Fthe%5Fnavy/archive/2024-10)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"34--ROD, WELDING","description":"CONTACT INFORMATION|4|N743.40|WVL|717-605-1842|DESIREE.D.MEYERS.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|INSPECTION: D ACCEPTANCE: D| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X|||X||||| VARIATION IN QUANTITY (APR 1984)|3|+10%|-10%|| TIME OF DELIVERY (JUNE 1997)|20|50 LBS|||||||||||||||||||| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT COMBO|N/A|TBD|N00104|TBD|N39040 CERTIFICATION; S4306A MATERIAL|N50286 pORTSMOUTH|TBD|133.2||N/A|CERTIFICATION N39040|||SS DD1423 OR SPECIFIED BY BLOCK 14A|| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|1 YEAR FROM DATE OF DELIVERY|365 DAYS AFTER ACCEPTANCE OF MATERIAL||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (SEP 2021)|13|333992|1,250|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||| EVALUATION CRITERIA AND BASIS FOR AWARD-|1|| 1. The offer due date is updated to 21 October 2024. 2. The POC is updated to Amanda Bailey amanda.l.bailey50.civ@us.navy.mil. 3. The Small Business Set-Aside is hereby dissolved. 4. The quantity is updated to 500. 5. This procurement is issued pursuant to Emergency Acquisition Flexibilities. \\ This amendment is issued to extend closing to 28JUL23. This amendment is issued to extend closing date to 05MAY23. \\ This amendment is to extend the closing date to 16DEC22. \\ This amendment is issued to extend the closing date to 09 SEP 2022. \\ The purpose of this amendment is to extend the closing date to 10AUG22. \\ Amendment issued to extend closing date to 17JUN22. This amendment is issued to extend the closing date to 13 MAY 22. \\ This amendment is issued to extend the closing date to 15 APR 22. This amendment is to extend the closing date to 15 MAR 2022. This amendment is to extend the closing date to 14 FEB 2022. POC changed to benjamin.t.spangler.civ@us.navy.mil All prior offers shall be resubmitted to above POC or NECO. \\ 1. DD1423 DATA ITEM AOO1 (INSPECTION AND TEST PLAN) MAY BE WAIVED IF ALREADY ON FILE AT NAVSUP WSS MECHANICSBURG. 2. PORTSMOUTH NSY'S DODAAC HAS CHANGED FROM N00102 TO N50286. ANY REFERENCE TO N00102 WITHIN THIS ORDER SHOULD BE UPDATED TO N50286. 3.ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS,PURCHASE ORDERS,TASK ORDER,DELIVERY ORDER,\u0026 MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT CONSIDERED TO BE \"ISSUES\" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO \"ISSUE\" CONTRACTUAL DOCUMENTS AS DETAILED HERE IN. 4. NAVSUP WSS MECH WILL BE CONSIDERING PAST PERFORMANCE IN THE EVALUATION OF OFFFERS. SEE CLAUSE 252.213-7000. 5. THE FOLLOWING PROPOSES DELIVERY SCHEDULE APPLIES: SUBMISSION ODF ALL CERTIFICATION DATA CDRLS 20 DAYS PRIOR TO DELIVERY. PNSY REVIEW/ACCEPTANCE OF CERTIFICATION CDRLS 6 WORKIG DAYS AFTER RECEIPT. 180 ACTUAL DAYS TO MANUFACTURE PART FINAL DELIVERY OF MATERIAL 365 DAYS DELIVERY DAYS AND PAST PERFORMANCE WILL BE EVALUATION FACTORS IN DETERMINING AWARDEE. 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or...","url":"https://matchawards.com/dept_of_the_navy/posts/113400510168067159","identifier":"N0010422QFA07","category":"333992 - Welding and Soldering Equipment Manufacturing","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"3439 - MISCELLANEOUS WELDING, SOLDERING, AND BRAZING SUPPLIES AND ACCESSORIES"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"5.1 Machinery \u0026 Components","url":"https://matchawards.com/categories/industrial-products-and-services/machinery-and-components"}],"availabilityStarts":"2024-10-30","availabilityEnds":"2024-11-14","validThrough":"2024-11-14T23:59:59-05:00","sameAs":"https://sam.gov/opp/ebc52d8e77ad4f16b252f6c0cb95f6a1/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Manufacturing","item":"https://matchawards.com/contracts/manufacturing"}]}
```

