ClickCease 59--RELAY ASSEMBLY GROU (N0038324RC561) | Closed - MatchAwards

59--RELAY ASSEMBLY GROU

Status
Closed, the response deadline passed on May 30, 2025
Agency
United States Department of the Navy
Office
PHILADELPHIA, USA
Notice type
Solicitation
Solicitation number
N0038324RC561
NAICS
335314 - Relay and Industrial Control Manufacturing
PSC
5945 - RELAYS AND SOLENOIDS
Posted
2025-04-30
Deadline
2025-05-30

Description

CONTACT INFORMATION|4|N792.10|T2Q|215-697-9948|KIMBERLY.FLORES12.CIV@US.NAVY.MIL| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|X||||||||||||X|||||||||||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS|60 DAYS AFTER DISCOVERY OF DEFECT||||| WARRANTY OF DATA - BASIC (MAR 2014)|2||| FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)|7|||||||| LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)|1|| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| EVALUATION OF FIRST ARTICLE TESTING|3|||| This solicitation is for made new manufacture spare parts. NAVSUP WSS Requests proposals submitted in response to this solicitation remainvalid for a minimum of 120 days following submission. All contractual documents related to the instant procurement are considered tobe "issued" by the Government when copies are either deposited in the mail,transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Governments acceptance of the contractors proposal constitutesbilateral agreement to "issue" contractual documents as detailed herein. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.4 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.5 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.6 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.8 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.9 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;80020; ) ;625291-1; , Revision ;B; and all details and specifications referenced therein. 1.11 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.12 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS DRAWING DATA=MPR 1221 |80020| T| |D| | | | DRAWING DATA=NAEC -51-1988 |80020| A| |C| | | | DRAWING DATA=324414 |80020| D| |D| | | | DRAWING DATA=415191 |80020|AH| |D| | | | DRAWING DATA=420540 |80020| F| |D| | | | DRAWING DATA=422145 |80020| E| |D| | | | DRAWING DATA=424670 |80020| A| |D| | | | DRAWING DATA=424751 |80020| D| |D| | | | DRAWING DATA=424752 |80020| B| |D| | | | DRAWING DATA=424753 |80020| A| |D| | | | DRAWING DATA=424755 |80020| C| |D| | | | DRAWING DATA=424756 |80020| -| |D| | | | DRAWING DATA=424757 |80020| B| |D| | | | DRAWING DATA=424758 |80020| E| |D| | | | DRAWING DATA=424759 |80020| B| |A| | | | DRAWING DATA=424761 |80020| C| |D| | | | DRAWING DATA=424762 |80020| B| |D| | | | DRAWING DATA=424763 |80020| E| |A| | | | DRAWING DATA=424766 |80020| B| |D| | | | DRAWING DATA=424769 |80050| A| |D| | | | DRAWING DATA=424770 |80020| B| |A| | | | DRAWING DATA=424771 |80020| A| |D| | | | DRAWING DATA=424772 |80020| D| |D| | | | DRAWING DATA=424775 |80020| A| |D| | | | DRAWING DATA=424794 |80020| B| |D| | | | DRAWING DATA=424795 |80020| B| |D| | | | DRAWING DATA=425045 |80020| A| |D| | | | DRAWING DATA=425046 |80020| A| |D| | | | DRAWING DATA=425047 |80020| B| |D| | | | DRAWING DATA=425048 |80020| B| |D| | | | DRAWING DATA=425049 |80020| A| |D| | | | DRAWING DATA=425187 |80020| C| |D| | | | DRAWING DATA=425504 |80020| C| |D| | | | DRAWING DATA=426011 |80020| A| |D| | | | DRAWING DATA=426756 |80020| A| |D| | | | DRAWING DATA=426757 |80020| A| |D| | | | DRAWING DATA=426772 |80020| -| |D| | | | DRAWING DATA=427238 |80020| B| |D| | | | DRAWING DATA=519476 |80020| H| |D| | | | DRAWING DATA=519477 |80020| B| |D| | | | DRAWING DATA=519478 |80020| A| |D| | | | DRAWING DATA=519479 |80020| D| |D| | | | DRAWING DATA=519480 |80020| B| |D| | | | DRAWING DATA=519481 |80020| D| |B| | | | DRAWING DATA=519482 |80020| A| |D| | | | DRAWING DATA=519483 |80020| B| |D| | | | DRAWING DATA=519485 |80020| D| |D| | | | DRAWING DATA=519486 |80020| C| |A| | | | DRAWING DATA=519489 |80020| C| |D| | | | DRAWING DATA=519490 |80020| C| |D| | | | DRAWING DATA=519492 |80020| F| |D| | | | DRAWING DATA=519494 |80020| E| |D| | | | DRAWING DATA=519496 |80020| A| |D| | | | DRAWING DATA=519917 |80020| D| |D| | | | DRAWING DATA=519929 |80020| A| |D| | | | DRAWING DATA=521158 |80020| -| |D| | | | DRAWING DATA=521213 |80020| A| |D| | | | DRAWING DATA=522777 |80020| A| |D| | | | DRAWING DATA=522778 |80020| E| |D| | | | DRAWING DATA=522779 |80020| B| |D| | | | DRAWING DATA=522780 |80020| B| |D| | | | DRAWING DATA=522782 |80020| A| |D| | | | DRAWING DATA=523118 |80020| B| |D| | | | DRAWING DATA=618361 |80020| D| |D| | | | DRAWING DATA=621238 |80020| E| |D| | | | DRAWING DATA=621240 |80020| C| |D| | | | DRAWING DATA=621241 |80020| D| |D| | | | DRAWING DATA=621242 |80020| D| |D| | | | DRAWING DATA=621243 |80020| D| |D| | | | DRAWING DATA=621244 |80020| K| |D| | | | DRAWING DATA=621333 |80020| E| |D| | | | DRAWING DATA=624171 |80020| -| |D| | | | DRAWING DATA=624245 |80020| A| |D| | | | DRAWING DATA=624278 |80020| A| |D| | | | DRAWING DATA=624279 |80020| A| |D| | | | DRAWING DATA=625290 |80020| B| |D| | | | DRAWING DATA=625291-1 |80020| B| |D| | | | DRAWING DATA=625292 |80020| A| |D| | | | DRAWING DATA=625294 |80020| B| |D| | | | DRAWING DATA=625295 |80020| A| |D| | | | DRAWING DATA=625759 |80020| A| |D| | | | 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE QUALITY ASSURANCE REQUIREMENTS 1. The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications: a. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%; b. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%; c. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4 d. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as defined by ANSI Z1.4. 2. First Article Testing: The contractor shall conduct First Article testing on this item of ALRE/SE and must address all elements listed below and prepare a First Article Test Report documenting the outcome. Unless otherwise specified, the report and its acceptance shall be per the provisions of the applicable Contract Data Requirements List (CDRL). i. First Article quantity is one (1); in uncoated condition. ii. The First Article shall be available for Government evaluation per the contract schedule. The Evaluation shall be conducted in the presence of the Government personnel. iii. The contractor shall provide facilities and personnel sufficient to conduct all necessary tests to establish conformance; iv. The contractor shall have available for review all certifications, test reports, in-process inspection documents needed to substantiate product quality; this same documentation shall also be included in the First Article test report; v. The contractor shall, at the time of First Article, have corrected any problem areas deemed significant and documented as deficient by the Government within his/her Quality Assurance system not previously identified during prior evaluations and/or surveys; any problems identified during the conduct of the test will also require correction. b. Testing and evaluation: i. The contractor shall accomplish 100% inspection and/or testing of all critical, major, and minor dimensions and/or requirements identified in the drawings, drawing notes, and process and fabrication specifications. Results shall consist of actual dimensions, measurements, and test outcomes and shall be recorded and included in the First Article test report. c. Acceptance/reject criteria: i. Satisfactorily meeting all requirements cited in the First Article Testing "Requirements" paragraph above and satisfactorily demonstrating 100% conformance to the test and evaluation elements cited in the FirstArticle Testing "Testing and evaluation" paragraph above shall constitute acceptance of the First Article; ii. Failure to meet any of the conditions in the First Article Testing "Requirements" paragraph above or the First Article Testing "Testing and evaluation" paragraph above shall be cause for rejection. d. Delivery: i. The accepted First Article exhibit may be delivered and counted along with the contract production quantities providing the item has not been damaged during testing, and has been found to be conforming; ii. The contractor is responsible for preparing the First Article Test Report in accordance with CDRL's. 3. Production Lot Special Tests: N/A 4. For purposes of this TDR, the term NDT shall refer to the following methods: MT - Magnetic Particle Testing, PT - Penetrant Inspection, UT - Ultrasonic Testing, RT - Radiographic Testing, and VT - Visual Testing. 5. Companies performing NDT shall be NADCAP accredited, or a laboratory accredited by one of the organizations listed below as satisfying ISO 17025 (General requirements for the competence of testing and calibration laboratories). NDT certificates shall be bear the symbols of accreditation and the accreditation body. a. American Association for Laboratory Accreditation (A2LA) b. ANSI National Accreditation Board (ANAB) c. International Accreditation Service, Inc (IAS) d. National Voluntary Laboratory Accreditation Program (NVLAP) e. Perry Johnson Laboratory Accreditation, Inc (PJLA) f. Canadian Association for Laboratory Accreditation Inc. (CALA) g. Standards Council of Canada (SCC) 4.1 Review documentation as provided under DD 1423 requirements. 4.2 CRITICAL MANUFACTURING PROCESSES ( ; ; ) HEAT TREAT ( ; ; ) WELDING ( ;APPLIES; ) CADMIUM PLATING ( ; ; ) ENGINEERING CHROME PLATING ( ; ; ) NICKEL CHROME PLATING ( ; ; ) CASTING(S) ( ; ; ) FORGING(S) ( ;APPLIES; ) MPR (MATERIAL PROCESSING REQUIREMENTS) 4.3 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below 4.3.1 Dimensional test (special) ;CLOSE TOLERANCES; 4.3.2 Requirements of: ;LKE DRAWING PACKAGE; 4.3.3 Form ;APPLIES; 4.3.4 Fit ;N/A; 4.3.5 Function ;N/A; 4.3.6 Compliance with drawing ( ;625291; ) ;80020; , Revision ;REV B; and specifications referenced therein. 4.4 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements 4.5 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection 4.6 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing. 4.6.1 The QAR shall be present to witness all First Article Testing. 4.6.2 The following additional personnel shall witness the First Article Testing: ;Roy Janney NAWCADLKE QA / Tel: (732)-323-2834 E-mail: roy.a.janney.civ@us.navy.mil; 4.7 Disposition of FAT samples 4.7.1 ; ; Sample(s) may be destroyed during testing. 4.7.2 ;APPLIES; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval of the cognizant DCMC QAR. Sa

Source notice

More from United States Department of the Navy posted in October 2024

More lists