<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_navy/posts/113060769554434252" -->

---
title: VALVE,CHECK (N0010424QFE49) | Closed - MatchAwards
description: VALVE,CHECK. United States Department of the Navy. Solicitation N0010424QFE49. NAICS 332919 - Other Metal Valve and Pipe Fitting Manufacturing. Deadline 2024-08-30. CONTACT INFORMATION|4|N743.30|n/a|717-605-2379|scott.youngblood@navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN...
canonical: https://matchawards.com/dept_of_the_navy/posts/113060769554434252
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: VALVE,CHECK (N0010424QFE49) | Closed
og:url: https://matchawards.com/dept_of_the_navy/posts/113060769554434252
og:description: VALVE,CHECK. United States Department of the Navy. Solicitation N0010424QFE49. NAICS 332919 - Other Metal Valve and Pipe Fitting Manufacturing. Deadline 2024-08-30. CONTACT INFORMATION|4|N743.30|n/a|717-605-2379|scott.youngblood@navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN...
og:image: https://matchawards.com/system/accounts/avatars/000/000/085/original/a0262fe00d6c038b.png?1638992122
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# VALVE,CHECK

Status

Closed, the response deadline passed on Aug 30, 2024

Agency

[United States Department of the Navy](/dept%5Fof%5Fthe%5Fnavy)

Office

MECHANICSBURG, USA

Notice type

Solicitation

Solicitation number

N0010424QFE49

NAICS

[332919 - Other Metal Valve and Pipe Fitting Manufacturing](/groups/455)

PSC

4820 - VALVES, NONPOWERED

Category

[Machinery & Components (5.1)](/categories/industrial-products-and-services/machinery-and-components)

Posted

2024-08-31

Deadline

2024-08-30

## Description

CONTACT INFORMATION|4|N743.30|n/a|717-605-2379|scott.youngblood@navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specification sections C and E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| TIME OF DELIVERY (JUNE 1997)|20|0001|3|365 days|||||||||||||||||| GENERAL INFORMATION-FOB-DESTINATION|1|b| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo-Receiving Report & Invoice - Material |n/a|tbd|N00104|tbd|N39040 - Certifications, S4306A - Material|N50286|tbd|133.2|n/a|n/a|S4306A - Material|n/a|n/a|See DD 1423|PORT\_PTNH\_WAWF\_NOTIFICATION@NAVY.MIL| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery|one year from date of delivery||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|1|0001AA|7|180|See DD 1423|tbd|0001AA|30|x|| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13|||||||||||||| SMALL BUSINESS PROGRAM REPRESENTATIONS (FEB 2024)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)|13|332919|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| 1\. Data Item A001 (inspection and Test Plan) may be waived if already on fileat NAVSUP WSS Mech. 2\. Drawings associated with this solicitation will be made available on the SAM.gov website but will be restricted access, which needs to be approved.Once access has been requested, interested vendors should email the POC listed on the solicitation to inform them of the request. 3\. NAVSUP WSS Mech will be considering past performance in the evaluation ofoffers. See Clause 252.213-7000\. 4\. The following proposed delivery schedule applies: Radiographic Shooting Sketches - 45 days ADC (DD) Radiographic Shooting Sketches Approval - 30 days after receipt (DD) Production Radiography (PR) - 135 days after approval of RSS (DD) Approval of PR 30 days after receipt (DD) Weld procedure and qual data 120 days adc Approval of weld procedures and qual data 60 days after receipt Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS after receipt Final delivery of material (365 days) Please quote actual delivery days Early and incremental delivery is acceptable at no additional cost to the Government. 5\. This requires First Article Testing (FAT) to be completed by the contractor(non-destructive). See DD1423 and FAR 52.209-3 for more details. \\ 1\. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2\. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.2 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.3 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. DRAWING DATA=2177142 |80064| M| |D|0001 | M|49998|3195245 DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-A105 | | | |210101|A| | | DOCUMENT REF DATA=ASTM-A106 | | |A |191101|A| | | DOCUMENT REF DATA=ASTM-A216 | | | |180701|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=ISO\_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=MIL-DTL-15024 | | |G |180303|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3\. REQUIREMENTS 3.1 ;Complete 5 inch In-Line Lift Check Valve must be in accordance with NAVSHIPS Drawing 803-2177142, Assembly 803-2177142-552AF, except as amplified or modified herein.; 3.2 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Body, Piece 40, and Pressure Seal Cover, Piece 42; Material - ;ASTM-A216 Grade WCB; Part - ;Couplet, Piece 51; Material - ;ASTM-A105; Part - ;Equalizer, Piece 52; Material - ;ASTM-A106 Grade B; 3.3 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Test - ;Magnetic Particle Inspection; Item - ;Couplet, Piece 51, and Equalizer, Piece 52; Performance - ;General Note 5.B on Drawing 803-2177142; Acceptance - ;General Note 5.B on Drawing 803-2177142; Test - ;Visual and Magnetic Particle Inspection; Item - ;Body, Piece 40, and Pressure Seal Cover, Piece 42; Performance - ;General Note 5.B on Drawing 803-2177142; Acceptance - ;General Note 5.B on Drawing 803-2177142; Test - ;Visual and Dye Penetrant Inspection; Item - ;All hardfaced surfaces after final machining; Performance - ;General Note 5.C on Drawing 803-2177142; Acceptance - ;General Note 5.C on Drawing 803-2177142; Test - ;Visual and Magnetic Particle Inspection (root and final layer); Item - ;Weld Joints I, II, and III; Performance - ;General Note 5.C on Drawing 803-2177142; Acceptance - ;General Note 5.C on Drawing 803-2177142; Test - Pressure Tests Item - Each Assembly Performance - ;General Note 1.B on Drawing 803-2177142; Acceptance - ;General Note 1.B on Drawing 803-2177142; Test - Non-Destructive Tests Item - ;Weld Repair (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification Attribute - Certificate of Compliance for seamless tubing/pipe Item - ;Equalizer, Piece 52; Performance - Material supplied must be in the seamless condition. 3.4 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.5 Radiography is required on ;Weld Joint II (final layer) and must be identified to the weld joint; . 3.6 Radiography is required on ;Body, Piece 40, and Pressure Seal Cover, Piece 42; . 3.7 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required. 3.8 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.9 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.9.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.9.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22\. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222\. 3.9.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.10 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.11 Heat Treat Requirements - Mechanical properties (via tension testing and hardness testing if hardness is required by the applicable material specification) are required for each heat in each heat treat charge for ASTM-A234, ASTM-A403, ASTM-A182, and ASTM-A105 material. 3.11.1 If heat treatment is performed in continuous-type furnaces with suitable temperature control and equipped with recording pyrometers so that complete heat-treatment records are available, a heat-treatment charge must be considered as any continuous run not exceeding an 8-hr duration. One tension test must be taken from one forging per heat in each heat treatment charge at a minimum of every 8 hours. 3.11.2 Certification of Mechanical Properties (Mechanical Analysis, Tension Testing) must include the condition furnished. The contractor must maintain a complete record on file of the heat treatment given each piece, including stress relief. The contractor must provide either the record of the final heat treatment or a heat treatment certification statement. The certification statement must be signed by the heat-treater and include the date of heat treatment, duration and temperature of heat treatment operations and quenching medium (if required). 3.12 Component Identification Description (CID) - When applicable drawing(s) and/or specification(s) specify that a nameplate or identification plate is required, the CID number ( ;CID 887035545X; ) must be added. When no plate is specified, an identification plate in accordance with MIL-DTL-15024, Type "C" on brass or Type "H" on aluminum must be securely attached to each assembly showing the above CID number. No assembly must be shipped without the CID number attached. 3.13 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.13.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. 3.14 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.15 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.15.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.15.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.15.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.16 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.17 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.18 See CDRLs DI-MISC-80875 (welding procedures) and DI-MISC-80876 (weld procedure qualification data) - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as part of the certification OQE package submitted by the Contractor. Note: These requirements do not apply to tack/spot welds when the conditions of Section 4.2.1.1 of S9074-AR-GIB-010A/278 are met. 3.18.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.18.2 If the Contractors qualification data ha 

<!-- mobian-agent-ad sponsored="true" id="9c681b2f-3404-49fc-a00a-f0e84862ae25" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/industrial-products-and-services/machinery-and-components?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


[Source notice](https://sam.gov/opp/3da7a92bf6fb4186bd2aa80a96ae6902/view)

[More from United States Department of the Navy posted in September 2024](/dept%5Fof%5Fthe%5Fnavy/archive/2024-09)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"VALVE,CHECK","description":"CONTACT INFORMATION|4|N743.30|n/a|717-605-2379|scott.youngblood@navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specification sections C and E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| TIME OF DELIVERY (JUNE 1997)|20|0001|3|365 days|||||||||||||||||| GENERAL INFORMATION-FOB-DESTINATION|1|b| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo-Receiving Report \u0026 Invoice - Material |n/a|tbd|N00104|tbd|N39040 - Certifications, S4306A - Material|N50286|tbd|133.2|n/a|n/a|S4306A - Material|n/a|n/a|See DD 1423|PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery|one year from date of delivery||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|1|0001AA|7|180|See DD 1423|tbd|0001AA|30|x|| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13|||||||||||||| SMALL BUSINESS PROGRAM REPRESENTATIONS (FEB 2024)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)|13|332919|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| 1. Data Item A001 (inspection and Test Plan) may be waived if already on fileat NAVSUP WSS Mech. 2. Drawings associated with this solicitation will be made available on the SAM.gov website but will be restricted access, which needs to be approved.Once access has been requested, interested vendors should email the POC listed on the solicitation to inform them of the request. 3. NAVSUP WSS Mech will be considering past performance in the evaluation ofoffers. See Clause 252.213-7000. 4. The following proposed delivery schedule applies: Radiographic Shooting Sketches - 45 days ADC (DD) Radiographic Shooting Sketches Approval - 30 days after receipt (DD) Production Radiography (PR) - 135 days after approval of RSS (DD) Approval of PR 30 days after receipt (DD) Weld procedure and qual data 120 days adc Approval of weld procedures and qual data 60 days after receipt Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS after receipt Final delivery of material (365 days) Please quote actual delivery days Early and incremental delivery is acceptable at no additional cost to the Government. 5. This requires First Article Testing (FAT) to be completed by the contractor(non-destructive). See DD1423 and FAR 52.209-3 for more details. \\ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 \"Document References\" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.2 Specification Revisions - The specification revisions listed under \"Documents References\" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation...","url":"https://matchawards.com/dept_of_the_navy/posts/113060769554434252","identifier":"N0010424QFE49","category":"332919 - Other Metal Valve and Pipe Fitting Manufacturing","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"4820 - VALVES, NONPOWERED"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"5.1 Machinery \u0026 Components","url":"https://matchawards.com/categories/industrial-products-and-services/machinery-and-components"}],"availabilityStarts":"2024-08-31","availabilityEnds":"2024-08-30","validThrough":"2024-08-30T23:59:59-04:00","sameAs":"https://sam.gov/opp/3da7a92bf6fb4186bd2aa80a96ae6902/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Manufacturing","item":"https://matchawards.com/contracts/manufacturing"}]}
```

