FAIRING STRIP
- Status
- Closed, the response deadline passed on Sep 13, 2024
- Agency
- United States Department of the Navy
- Office
- MECHANICSBURG, USA
- Notice type
- Solicitation
- Solicitation number
- N0010424QYE34
- NAICS
- 336611 - Ship Building and Repairing
- PSC
- 2090 - MISCELLANEOUS SHIP AND MARINE EQUIPMENT
- Posted
- 2024-08-29
- Deadline
- 2024-09-13
Description
CONTACT INFORMATION|4|N&$!|GDS|564-226-3005|kimberly.m.myers.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|MIL-I-45208| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| PRODUCTION LOT TESTING|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Combo Invoice and Receiving||TBD|N00104|TBD|TBD|TBD|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| QUALIFICATION REQUIREMENTS (FEB 1995)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)|13|336611|1,300 employees|||||||||||| INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (NOV 2021)|2||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| EVALUATION OF FIRST ARTICLE TESTING|3|||| 1. This solicitation is for the following PROCUREMENT: A. Fairing Strip, NSN 2090 012244911. This part requires engineering source approval by the design control activity in order to maintain the quality of the part. Existing unique capability, engineering skills, and manufacturing knowledge by the qualified source(s)require acquisition of the part from the approved source(s). The approved source(s) retain data rights, manufacturing knowledge, or technical data thatare not economically available to the Government, and the data or knowledge is essential to maintaining the quality of the part. An alternative source must qualify in accordance with the design control activity's procedures, asapproved by the Government engineering activity having jurisdiction over thepart in the intended application. 2. Government-Source Inspection and Acceptance (I&A) is required. If I&A will occur at a different CAGE from the Award CAGE, provide the facility CAGE and/or packaging CAGE with the quote. 3. MIL-STD Packaging is required and it will not be waived. 4. Provide the following information in the procurement quote: A. Your CAGE (used as the awardee CAGE):___________________ B. The unit procurement price: $__________________________(Firm Fixed Price). C. The facility CAGE __________ and/or packaging CAGE_______ (if applicable, as described in #2). D. Procurement Acquisition Time, delivered in _____ days. Offerors must have a valid U.S. security clearance of classified or higher in order to respond to this RFP (Announcement), because the RFP (Announcement)includes an annex (information) classified at the confidential level which will be released only to offerors possessing the appropriate clearance. Allclassified material must be handled in accordance with the National Industrial Security Program Operating Manual (NISPOM) (DoD 5220-22-M) and IndustrialSecurity Regulation (DoD 5220.22-R) . 5. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 6. Please submit a procurement quote to Kim Myers via email: Kimberly.M.Myers.civ@us.navy.mil. 7. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 8. This is a rated order certified for national defense use, and the Contract will follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700). 9. This order will be issued pursuant to Emergency Acquisition Authority (EAF). \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the FAIRING STRIP , part of the ;Special Hull Treatment Program. This specification covers one class of Fairing Strip, identified as Type AA-18; . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.1.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.1.3 The "Document Changes" section provides supersessions/changes to referenced documents. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=5808330 |53711| F| |D|0001 | F|49998|0045902 DRAWING DATA=5808330 |53711| F| |D|0002 | F|49998|0019660 DRAWING DATA=5808330 |53711| F| |D|0003 | F|49998|0025272 DRAWING DATA=5808330 |53711| F| |D|0004 | F|49998|0036564 DRAWING DATA=5808330 |53711| F| |D|0005 | F|49998|0018631 DRAWING DATA=5808330 |53711| F| |D|0006 | F|49998|0015546 DRAWING DATA=5808330 |53711| F| |D|0007 | F|49998|0040875 DRAWING DATA=5808330 |53711| F| |D|0008 | F|49998|0044057 DRAWING DATA=5808330 |53711| F| |D|0009 | F|49998|0032826 DRAWING DATA=5808330 |53711| F| |D|0010 | F|49998|0042058 DRAWING DATA=5808330 |53711| F| |D|0011 | F|49998|0033656 DRAWING DATA=5808330 |53711| F| |D|0012 | F|49998|0047437 DRAWING DATA=5808330 |53711| F| |D|0013 | F|49998|0054665 DRAWING DATA=5808330 |53711| F| |D|0014 | F|49998|0047151 DRAWING DATA=5808330 |53711| F| |D|0015 | F|49998|0044573 DRAWING DATA=5808330 |53711| F| |D|0016 | F|49998|0038625 DRAWING DATA=5808330 |53711| F| |D|0017 | F|49998|0038609 DRAWING DATA=5808330 |53711| F| |D|0018 | F|49998|0040537 DRAWING DATA=5808330 |53711| F| |D|0019 | F|49998|0034235 DRAWING DATA=5808330 |53711| F| |D|0020 | F|49998|0014423 DRAWING DATA=5808330 |53711| F| |D|0021 | F|49998|0036894 DRAWING DATA=5808330 |53711| F| |D|0022 | F|49998|0032810 DOCUMENT REF DATA=MIL-STD-105 | | |E |950227|A| | | DOCUMENT REF DATA=MIL-STD-129 | | |P |041029|A| |03| DOCUMENT REF DATA=MIL-STD-177 | | |A |880531|A| | | DOCUMENT REF DATA=FED-STD-313 | | |D |000321|A| |01| DOCUMENT REF DATA=MIL-STD-407 | | | |910321|A| | | DOCUMENT REF DATA=MIL-STD-2073 |0001| |D |020510|A| |01| DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=S6360-AD-HBK-010 | | | |940930|E| | | DOCUMENT REF DATA=ASTM-D1974 | | | |940301|A| | | DOCUMENT REF DATA=ASTM-D2240 | | | |920622|A| | | DOCUMENT REF DATA=ASTM-D297 | | | |930915|A| | | DOCUMENT REF DATA=ASTM-D3767 | | | |920417|A| | | DOCUMENT REF DATA=ASTM-D3951 | | | |901221|A| | | DOCUMENT REF DATA=ASTM-D412 | | | |921115|A| | | DOCUMENT REF DATA=ASTM-D4615 | | | |941003|A| | | DOCUMENT REF DATA=ASTM-D471 | | | |980911|A| | | DOCUMENT REF DATA=ASTM-D5118/D5118M | | | |940301|A| | | DOCUMENT REF DATA=ASTM-D573 | | | |880527|A| | | DOCUMENT REF DATA=ASTM-D635 | | | |910715|A| | | DOCUMENT REF DATA=MIL-HDBK-774 | | |A |040830|A| | | DOCUMENT REF DATA=ISO9001 | | |94 |940701|A| | | DOCUMENT REF DATA=ISO9002 | | | |940701|A| | | DOCUMENT REF DATA=MIL-STD-973 | | | |920417|A| | | DOCUMENT REF DATA=MIL-STD-973 | | | |950113|A| |03| DOCUMENT CHANGE DATA=MIL-P-116 |MIL-STD-2073/1 DOCUMENT CHANGE DATA=MIL-STD-147 |MIL-HDBK-774 DOCUMENT CHANGE DATA=PPP-B-636 |ASTMD5118 ASTMD1974 3. REQUIREMENTS 3.1 Design, Manufacture, and Performance - Except as modified herein, the FAIRING STRIP furnished under this contract/purchase order shall meet the design, manufacture, and performance requirements specified on drawing ;5808330; cage ;53711; . 3.1.1 ;Part Number : 5808330 TYPE AA-18; 3.2 ; Source Control Item - Previous delivery of this specified National Stock Number or similar item manufactured to technical procurement specifications and/or drawings supplied by a Government activity or Price Contractor does not in itself qualify a supplier as a Government approved source. Only those sources for this item currently approved by the Government will be considered for this award. The time required for approval of a new supplier is normally such that award cannot be delayed pending approval of the new source. Qualification and testing requirements are extensive and time consuming. To maintain appropriate stock levels and prevent work stoppage, a prospective contractor must be determined to be qualified by the engineering activity prior to submitting offer. If you have not been solicited and you can furnish either (a) proof of your prior approval as a supplier of this item, or (b) data showing you have produced the same or similar items satisfactorily for the Government or a commercial source, or (c) test data indicating your product can meet service operating requirements, or (d) other pertinent data concerning your qualification to produce the required item, notify the Procurement Contracting Officer in writing, furnishing said proof of data for evaluation, possibly leading to your firm being authorized as an approved source for this procurement or subsequent procurements. Your interest will be forwarded to the In-Service Engineering Agent (ISEA) responsible for this item.; 3.2.1 ;ISEA qualified and approved source(s) at this time are the following: 0SX38, Westland Technologies; 3.3 Configuration Control - MIL-STD-973 entitled "Configuration Management", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973, Paragraph 5.4.8.2 and Appendix D. Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E. Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E. (Original and two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.) 3.3.1 Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until another drawing revision is approved. The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted, the date of the granting of the authorization, and the name of the granting authority. Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below. The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA 17055-0788. Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor. 3.4 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned. These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere. 3.5 ;Molds - The contractor is responsible for designing molds to produce the Fairing Strips as specified in paragraph 3.3, 6.3 and table II of 53711 Drawing 5808330. The Government reserves the right to examine mold drawings and molds to accept or reject plan tolerances.; 3.6 ;Material Safety Data Sheets (MSDS) - Material Safety Data Sheets shall be in accordance with paragraph 3.3.6 of 53711 Drawing 5808330 and the requirements of MIL-STD-313.; 3.7 ;Responsibility for Inspection - The contractor is responsible for the performance and certification of all inspection requirements as specified in paragraph 4.1 of 53711 Drawing 5808330 and this specification. Unless specified elsewhere in this specification.; 3.8 First Article Approval (Government Testing) - First Article Test (FAT) and approval is required. NOTE - After receipt of contract and prior to production, (production will not be authorized until First Article Test has been approved) material which the supplier proposes to furnish shall be tested for conformity to the requirements of paragraph 4.2 and table I and II of 53711 Drawing 5808330. 3.9 ;Samples for First Article Test - Samples required for First Article Test shall be in accordance with paragraph 4.2.1 of 53711 drawing 5808330 and shall be certified to have the same composition, construction and manufacturing process as the material to be supplied on subsequent production lots.; 3.10 ;Adhesion of Fairing Strips - "SHT" Epoxy Paint Hull Perservation DTNSRDC 2844- 1109 (NAVSEA drawing 53711,5808333) and Epoxy Adhesive DTNSRDC 2844-1102 (NAVSEA drawing 53711,5808332) will be the only paint and adhesive to be used for "SHT" material "Adhesion of Fairing Strips" testing.; 3.11 Marking - This item shall be physically identified in accordance with ;MIL-STD-129 and paragraph 5.2.3 of 53711 Drawing 5808330; . 3.12 ;Special Marking - Special Marking shall be in accordance with paragraph 5.2.3.1 and 6.5 of 53711 Drawing 5808330.; In addition, all outside containers are to be marked with black letters a minium of one (1) inch high in non-fading, water resistant ink, with the designation "SHT". 3.13 ;Production Lot Test/Quality Conformance Inspection Approval (Government Testing) - Productin Lot Test (PLT)/Quality Conformance Inspection (QCI) and approval is required.; Production Lot Test Quality/Conformance Inspection - If the Fairing Strips from a supplier have passed the First Article Inspection, the supplier may commence production. The production of Fairing Strips is subject to the requirements for Batch Acceptance and Lot Acceptance as required by paragraph 4.3 of 53711 Drawing 5808330. Material submitted for Production Lot Test/Quality Conformance Inspection shall be certified to have the same composition, construction and manufacturing process as the material supplied for First Article Test. 3.14 ;Sampling and Rating for Lot Acceptance - Sampling and Rating for Lot Acceptance shall be in accordance with the requirements of paragraph 4.3.2.3 and Table IV of 53711 Drawing 5808330. NOTE: LOT Acceptance Test shall be in accordancewith the requirements of paragraph 4.3.2.2. of 53711 Drawing 5808331. A LOT shall be as specified in paragraph 4.3.2.1 of 53711 Drawing 5808331.; 3.15 ;Cleaning Procedure - See section 6 (NOTES) of this specification for cleaning procedures.; 3.16 ;The supplMore from United States Department of the Navy posted in August 2024