ClickCease 48--FIRING VALVE ASSY, IN REPAIR/MODIFICATION OF (N0010424RZC09) | Closed - MatchAwards

48--FIRING VALVE ASSY, IN REPAIR/MODIFICATION OF

Status
Closed, the response deadline passed on Sep 23, 2024
Agency
United States Department of the Navy
Office
MECHANICSBURG, USA
Notice type
Solicitation
Solicitation number
N0010424RZC09
NAICS
332919 - Other Metal Valve and Pipe Fitting Manufacturing
PSC
4820 - VALVES, NONPOWERED
Category
Machinery & Components (5.1)
Posted
2024-08-27
Deadline
2024-09-23

Description

CONTACT INFORMATION|4|N742.10|WV4CC|N/A|madison.m.gray4.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|ISO9001| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION/ACCEPTANCE POINT|6||||||| TIME OF DELIVERY (JUNE 1997)|20|CLIN 0001|EIGHTEEN (18)|121|||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| REPAIR DELIVERY (FIRM FIXED PRICE)|1|121| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Material - Invoice and Receiving Report (COMBO) Certifications - Stand-Alone Receiving Report|Material - Inspect & Accept at Source|TBD|N00104|TBD|TBD|N50286|TBD|N/A|N/A|N/A|N/A|N/A|N/A|See DD Form 1423|PORT_PT NH_WAWF_NOTIFICATION@NAVY.MIL| NOTE FOR CONTRACTOR/ADMINISTRATIVE CONTRACTING OFFICER|3|||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| FIRM FIXED PRICE REPAIR PURCHASE ORDERS|1|TBD| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery|one year from date of delivery||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (SEP 2023)|4||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (JAN 2023)|2||| PROGRESS PAYMENTS (NOV 2021)|4||||| LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13|||||||||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)|13|332911|750 (# of employees)|||||||||||| COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEVIATION 2018-O0015)(MAY 2018))|1|| TYPE OF CONTRACT (APR 1984)|1|Firm-Fixed Price| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1. This is a Submarine Corporate Component Repairs Program (CCRP) sole source repair requirement. 2. Please provide a Firm-Fixed Price (FFP) qualifying proposal for the full repair effort of the requirement. Please include the cost of new, or estimated cost of new, with the submitted proposal. 3. When submitting a proposal, specify any exceptions (i.e., MIL-STD Packaging, MIL-STD Labeling, Inspection & Acceptance locations, Packaging House, surplus material, etc.). If no exceptions are indicated or received, award shall be based upon solicitation requirements. Changes or requests for changes after award shall be subject to consideration costs deducted from the unit price. 4. In repair price, include all costs associated with receipt and complete repair of the material that may be in unwhole condition, missing hardware, damaged, handling damage, missing parts, wear damage, and CAV Reporting. Also provide the following information: 4.1. Teardown & Evaluation Rate: 4.2. Repair Turn Around Time (RTAT): 4.3. Throughput Constraint: 4.4. Induction Expiration Date: 5. Repair Turn Around Time (RTAT) - the resultant contractual delivery requirement is measured from the asset return to the asset acceptance under the terms of the contract. For purposes of this section, return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt, and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The contractor must obtain final inspection and acceptance by the Government for all assets within the RTAT established in the contract. 5.1. Requested RTAT: 121 Days 5.2. Proposals shall reference the proposed RTAT and any capacity constraints. 6. Price Reductions - Any asset for which the contractor does not meet the required RTAT will incur a price reduction of (TBD Price) per unit. This adjustment will be implemented via a Reduction Modification at the end of contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. 7. If requirement will be packaged at a location different from the Offeror's address, the Offeror shall provide the Company Name, Street Address and CAGE of the Packaging Facility. 8. If the Offeror is not the Original End Manufacturer (OEM) of the material called out in the requirement, the OEM must be stated (Company Name and CAGE), and the Offeror must be able to provide a signed letter of authorization to perform repairs from the OEM on the company's letterhead. 9. All contractual documents (i.e., contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 10. The contractor must obtain final inspection and acceptance by the Government for all assets within the RTAT established in the resulting contract. 11. Any contract awarded as a result of this solicitation will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contract to be awarded will be a rated order. 12. Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.2 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.3 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;280912-0004 99657 B B 233985-0001 99657 M B 236001-0003 99657 F B 281015-0001 99657 G B 235445-0002 99657 C B 283538 99657 J B 284031-0001 99657 C B 236463 99657 A B 236461 99657 C B 233029 99657 L B ATP280912-0004 99657 L B 233985-0003 99657 A B; DRAWING DATA=5950-081-091 |53711| -|ST |D|0001 | -|49998|1955052 DOCUMENT REF DATA=ASTM-B21 | | | |200401|A| | | DOCUMENT REF DATA=ASTM-B21 | | |A |191001|A| | | DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=FF-S-86 | | |G |210127|A| | | DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-B171 | | | |040501|A| | | DOCUMENT REF DATA=ASTM-A276 | | | |170315|A| | | DOCUMENT REF DATA=QQ-N-281 | | |D |851023|A| 2| | DOCUMENT REF DATA=ASTM-B283 | | |A |191001|A| | | DOCUMENT REF DATA=ASTM-A574 | | | |211201|A| | | DOCUMENT REF DATA=ASTM-A581 | | |B |950910|A| | | DOCUMENT REF DATA=ASTM-A582 | | | |211101|A| | | DOCUMENT REF DATA=ASTM-F606 | | | |191115|A| | | DOCUMENT REF DATA=QQ-B-639 | | |C |160219|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | | DOCUMENT REF DATA=SAE AMS 5640 | | |V |160201|A| | | DOCUMENT REF DATA=SAE AMS-S-7720 | | | |970901|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=MIL-DTL-15024 | | |G |180303|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=SAE AMS-QQ-S-763 | | |D |150301|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 REFURBISHED MATERIAL STATEMENT OF WORK (REPAIR SOW) - 3.1.1 INSPECTION - Clean and determine if refurbishment is possible. At disassembly, the Contractor must record all identifying markings found on the parts of each assembly. The Contractor must maintain traceability of these markings to each unit throughout refurbishment. 3.1.2 IDENTIFYING MARKINGS - Part must have a MIC (Material Identification a and Control) code, heat/heat lot code, or unique Contractor traceability number/code that is visible on the part. See Material Traceability in paragraph 3 (Quality Assurance Provisions) of this contract for traceability requirements. The MIC code can consist of a 2, 3, or 4 letter material identifier, 4 or 5 digit Julian date, 3 digit lot serial number, and Certifying Activity Designator (CAD) which will be 1 or 2 letters; the 4 parts are normally separated by hyphens; examples: TIA-3089-30-QQ and ST-06262-506-A. 3.1.3 RE-USEABLE PARTS - - Any parts of the original assembly that are useable (replacement is not necessary), that are properly marked as identified above, and that have material certifications available may be utilized as initially supplied. Certifications are not required to be resubmitted by the contractor. - Any parts of the original assembly that are useable (replacement is not necessary), are properly marked as identified above, but material certifications are not available at the contractor's facility, a waiver must be submitted in accordance with Waiver/Deviation (Configuration Control) requirements specified elsewhere in the Contract. 3.1.4 NON-USEABLE PARTS - -Any parts of the original assembly that are not properly marked as identified above must be replaced and the required certifications must be submitted. - Any parts of the original assembly that are not usable (replacement is necessary) must be replaced and the required certifications must be submitted. 3.1.5 REFURBISHMENT - Upon completion of inspection, this item must be refurbished to be in accordance with ;Marotta Drawing 280912-0004, Part Number 280912-0004, Assembly Model SPV83 and MS NO. 5950-081-091 REV - CHG 15; , except as amplified or modified herein. This applies to all "Parts Requiring Certification" as identified elsewhere in this Contract/Purchase Order. 3.1.6 ADDITIONAL SOW REQUIREMENTS - ;N/A; 3.2 ;For the potting compound, Item 93 on Marotta drawing 284031-0001, the use of Dow SILASTIC RTV-3110 in lieu of RTV 751 or 501 is acceptable.; 3.3 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: ;Drawing 280912-0004 (Firing Valve Assembly); Part - ;Body, Item 13; Cover, Item 14; and Fitting, Item 15; Material - ;CRES 300 Series per SAE-AMS-QQ-S-763 or SAE-AMS 5640 or ASTM-A581 or ASTM-A582; Part - ;Socket Head Cap Screws, Items 86 and 87; Material - ;CRES 300 Series per FF-S-86 (Mechanical Properties as modified by General Note 13 of Drawing 280912-0004); ;Drawing 233985-0001, Part Number 233985-0001 or Drawing 233985-0003, Part Number 233985-0003 (Differential Pressure Indicator); Part - ;Body, Part Number 233985-0001 on Drawing 233985-0001 or Body, Part Number 233985-0003 on Drawing 233985-0003; Material - ;QQ-N-281 or CRES 300 Series per ASTM-A581 or ASTM-A582 or SAE-AMS-QQ-S-763 or SAE-AMS-5640; ;Drawing 236001-0003 (Dome System Assembly); Part - ;Retainer, Item 25; Body, Item 36; and Plug, Item 81; Material - ;CRES 300 Series per SAE-AMS-QQ-S-763 or SAE-AMS 5640 or ASTM-A581 or ASTM-A582; Part - ;Housing, Item 28; Material - ;ASTM-B21, Alloy C46400, Temper H02; Part - ;Socket Head Cap Screw, Item 83; Material - ;CRES per FF-S-86; ;Drawing 281015-0001 (Relief Valve Assembly); Part - ;Retainer, Item 17 and Body, Item 18; Material - ;CRES 300 Series per SAE-AMS-QQ-S-763 or SAE-AMS 5640 or ASTM-A581 or ASTM-A582; ;Drawing 235445-0002 (Compensator Assembly); Part - ;Housing, Item 12 and Cover, Item 13; Material - ;QQ-N-281; Part - ;Socket Head Cap Screw, Item 60; Material - ;CRES 300 Series per SAE-AMS-S-7720 or SAE-AMS-QQ-S-763 or ASTM-A276 or FF-S-86; ;Drawing 283538, Part Number 283538-1344 (Hand Valve Assembly); Part - ;Retainer Screw, Item 13; Material - ;CRES 300 Series per SAE-AMS-QQ-S-763 or SAE-AMS 5640 or ASTM-A581 or ASTM-A582; Part - ;Stem, Item 15; Material - ;SAE-AMS-QQ-S-763, Class 316, Condition A; ;Drawing 284031-0001 (Pilot Valve Assembly); Part - ;Nut, Item 25; Material - ;ASTM B21, UNS C46400, Temper H04 or H02 with the following minimum properties: Yield Strength: 30,000 PSI Tensile Strength: 58,000 PSI Elongation: per ASTM B21 for the starting material size and temper; Part - ;Body, Item 32; Material - ;SAE-AMS-QQ-S-763, Class 316; ;Drawing 236463 (Interlock Assembly); Part - ;Adapters, Items 20 and 25; Material - ;CRES 300 Series per SAE-AMS-QQ-S-763 or SAE-AMS 5640 or ASTM-A581 or ASTM-A582; Part - ;Body, Item 22; Material - ;QQ-B-639, Alloy 464 or ASTM-B171, Alloy C46400 or ASTM-B21, Alloy C46400, Temper H02; ;Drawing 236461 (Regulator Assembly); Part - ;Guide, Item 15; Body, Item 26; Cover, Item 28; and Plug, Item 85; Material - ;CRES 300 Series per SAE-AMS-QQ-S-763 or SAE-AMS 5640 or ASTM-A581 or ASTM-A582; Part - ;Socket Head Cap Screw, Item 82; Material - ;CRES per FF-S-86 (Mechanical Properties as modified by Note 12 of Drawing 236461); ;Drawing 233029, Part Number 233029-0001 (Screw Assembly); Part - ;Screw, Item 12; Material - ;CRES 300 Series per SAE-AMS-QQ-S-763 or SAE-AMS 5640 or ASTM-A581 or ASTM-A582; 3.4 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Test - Non-Destructive Tests Item - ;Weld Repair and/or Production Weld (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification Test - Intergranular Corrosion Test (Only for SAE-AMS-QQ-S-763, Classes 304-condition A, 304L, 316-condition A, 316L, 317-condition A, 321 and 347 material. Test must be performed prior to fabrication/machining) Item - ;Body, Item 13, Cover, Item 14, and Fitting, Item 15 on Drawing 280912-0004; Body on Drawing 233985-0001 or 233985-0003; Retainer, Item 25, Body, Item 36, and Plug, Item 81 on Drawing 236001-0003; Retainer, Item 17 and Body, Item 18 on Drawing 281015-0001; Socket Head Cap Screw , Item 60 on Drawing 235445-0002; Retainer Screw, Item 13 and Stem, Item 15 on Drawing 283538; Body, Item 32 on Drawing 284031-0001; Adapters, Items 20 and 25 on Drawing 236463; Guide, Item 15, Body, Item 26, Cover, Item 28, and Plug, Item 85 on Drawing 236461; and Screw, Item 12 on Drawing 233029; Performance - SAE-AMS-QQ-S-763 Acceptance - SAE-AMS-QQ-S-763 Test - ;Liquid Penetrant Inspection; Item - ;Items 86 and 87 of drawing 280912-0004, item 83 of drawing 236001-0003, item 82 of drawing 236461, and item 60 of drawing 235445-0002; Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222 Acceptance - MIL-DTL-1222 Test - ;Acceptance Test; Item - ;Each Assembly; Performance - ;ATP280912-0004; Acceptance - ;ATP280912-0004; 3.5 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification o

Source notice

More from United States Department of the Navy posted in August 2024

More lists