CABLE ASSY,INBOARD
- Status
- Closed, the response deadline passed on Jun 11, 2024
- Agency
- United States Department of the Navy
- Office
- MECHANICSBURG, USA
- Notice type
- Solicitation
- Solicitation number
- N0010422QFC63
- NAICS
- 335931 - Current-Carrying Wiring Device Manufacturing
- PSC
- 5935 - CONNECTORS, ELECTRICAL
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Posted
- 2024-08-26
- Deadline
- 2024-06-11
Description
CONTACT INFORMATION|4|N743.7|WVE|717-605-3875|jill.sabol@navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specification section C | INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Material - Invoice & Receiving Report (COMBO) Certifications - Stand-Alone Receiving Report |Material - Inspection & Acceptance at SOURCE Certifications - Inspection at DESTINATION & Acceptance at OTHER| TBD|N00104|TBD|Certifications - N39040; Material -S4306A |N50286|TBD|133.2|N/A|N/A|Certifications - N39040|N/A|N/A|See DD Form 1423|PORT_PTNH_WAWF_Notification@navy.mil| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from the date of delivery |one year from the date of delivery ||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|1|0001AA|7|180|jill.sabol@navy.mil|TBD|0001A|120|x|| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2022)|13|335931|500|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| EVALUATION OF FIRST ARTICLE TESTING|3|||x| EVALUATION CRITERIA AND BASIS FOR AWARD-|1|| 1. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 2. Any contract/order awarded as a result of this solicitation will be a "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). See 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use. 3. Vendors submitting quality manuals shall submit them to jill.sabol@navy.mil instead of 0243.QAMANUAL@navy.mil. Per WSSTERMLZ02, offerors are cautioned that this procurement will not be delayed solely for approving additional sources. DD 1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 4. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 5. NAVSUP WSS Mech will be considering past performance in the evaluation of offers. See Clauses DFARS 252.213-7000 and WSSTERMMZ01. 6. If drawings are included in the solicitation, access needs to be requested on the individual solicitation page on Contract Opportunities on the Government's SAM.gov website. After requesting access, send an email to the Primary POC listed on the solicitation. The following delivery schedule will apply: FAT REPORT 180 DAYS AFTER DATE OR ORDER APPROVAL OF FAT REPORT 120 DAYS AFTER RECEIPT Within 180 Days after Contract Award and within 30 days after Test Completion, forward the Test Report to the PCO. The review shall be accomplished within 120 days.Submission of all other form 1423 certification data (CDRLs) will be on or before 20 days prior to delivery. PNSY review/acceptance of CDRLs shall be 6 working days after receipt of CDRLs. Final delivery of material will be on or before 400 days after the effective date of the contract. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.3 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. DRAWING DATA=EB-4707 |96169| A|SP |D|0001 | A|49998|0034417 DRAWING DATA=EB-4707 |96169| A|SP |D|0002 | A|49998|0010228 DRAWING DATA=EB-4707 |96169| A|SP |D|0003 | A|49998|0009688 DRAWING DATA=EB-4707 |96169| A|SP |D|0004 | A|49998|0015196 DRAWING DATA=EB-4707 |96169| A|SP |D|0005 | A|49998|0042460 DRAWING DATA=EB-4707 |96169| A|SP |D|0006 | A|49998|0013600 DRAWING DATA=EB-4707 |96169| A|SP |D|0007 | A|49998|0025918 DRAWING DATA=EB-4707 |96169| A|SP |D|0008 | A|49998|0027475 DRAWING DATA=EB-4707 |96169| A|SP |D|0009 | A|49998|0035849 DRAWING DATA=EB-4707 |96169| A|SP |D|0010 | A|49998|0026286 DRAWING DATA=EB-4707 |96169| A|SP |D|0011 | A|49998|0027109 DRAWING DATA=EB-4707 |96169| A|SP |D|0012 | A|49998|0040703 DRAWING DATA=EB-4707 |96169| A|SP |D|0013 | A|49998|0040998 DRAWING DATA=EB-4707 |96169| A|SP |D|0014 | A|49998|0043207 DRAWING DATA=EB-4707 |96169| A|SP |D|0015 | A|49998|0037818 DRAWING DATA=EB-4707 |96169| A|SP |D|0016 | A|49998|0020883 DRAWING DATA=PSSSN21C-306 |43689|.5|SP |D|0001 |.5|49998|9999999 DRAWING DATA=5613017 |53711| A| |D|0001 | A|49998|0019951 DRAWING DATA=5613018 |53711| A| |D|0001 | A|49998|0020757 DRAWING DATA=5613022 |53711| A| |D|0001 | A|49998|0024067 DRAWING DATA=5615883 |53711| A| |D|0001 | A|49998|0038074 DRAWING DATA=5615884 |53711| A| |D|0001 | A|49998|0184459 DRAWING DATA=7066213 |53711| G| |D|0000.A | G|49998|0027293 DRAWING DATA=7066213 |53711| G| |D|0000.0A | E|49998|0386749 DRAWING DATA=7066213 |53711| G| |D|0001 | G|49998|9999999 DRAWING DATA=7066213 |53711| G| |D|0002 | E|49998|0540066 DRAWING DATA=7066213 |53711| G| |D|0002.1 | G|49998|0045821 DRAWING DATA=7066213 |53711| G| |D|0002.2 | G|49998|0034633 DRAWING DATA=7066213 |53711| G| |D|0003 | C|49998|0264535 DRAWING DATA=7066213 |53711| G| |D|0004.1 | G|49998|0059812 DRAWING DATA=7066213 |53711| G| |D|0004.10 | G|49998|0078310 DRAWING DATA=7066213 |53711| G| |D|0004.11 | G|49998|0082951 DRAWING DATA=7066213 |53711| G| |D|0004.12 | G|49998|0086449 DRAWING DATA=7066213 |53711| G| |D|0004.13 | G|49998|0036956 DRAWING DATA=7066213 |53711| G| |D|0004.2 | G|49998|0068459 DRAWING DATA=7066213 |53711| G| |D|0004.3 | G|49998|0071461 DRAWING DATA=7066213 |53711| G| |D|0004.4 | G|49998|0068557 DRAWING DATA=7066213 |53711| G| |D|0004.5 | G|49998|0061836 DRAWING DATA=7066213 |53711| G| |D|0004.6 | G|49998|0060836 DRAWING DATA=7066213 |53711| G| |D|0004.7 | G|49998|0066673 DRAWING DATA=7066213 |53711| G| |D|0004.8 | G|49998|0069478 DRAWING DATA=7066213 |53711| G| |D|0004.9 | G|49998|0078787 DRAWING DATA=7066213 |53711| G| |D|0005.1 | G|49998|0048454 DRAWING DATA=7066213 |53711| G| |D|0005.2 | G|49998|0046599 DRAWING DATA=7066213 |53711| G| |D|0005.3 | G|49998|0048007 DRAWING DATA=7066213 |53711| G| |D|0005.4 | G|49998|0047993 DRAWING DATA=7066213 |53711| G| |D|0006.1 | G|49998|0060854 DRAWING DATA=7066213 |53711| G| |D|0006.2 | G|49998|0064253 DRAWING DATA=7066213 |53711| G| |D|0006.3 | G|49998|0053616 DRAWING DATA=7066213 |53711| G| |D|0006.4 | G|49998|0043734 DRAWING DATA=7066213 |53711| G| |D|0006.5 | G|49998|0054556 DRAWING DATA=7066213 |53711| G| |D|0006.6 | G|49998|0051176 DRAWING DATA=7066213 |53711| G| |D|0006.7 | G|49998|0059712 DRAWING DATA=7066213 |53711| G| |D|0006.8 | G|49998|0046241 DRAWING DATA=7066213 |53711| G| |D|0007.1 | G|49998|0026452 DRAWING DATA=7066213 |53711| G| |D|0007.10 | G|49998|0045606 DRAWING DATA=7066213 |53711| G| |D|0007.11 | G|49998|0045291 DRAWING DATA=7066213 |53711| G| |D|0007.12 | G|49998|0044279 DRAWING DATA=7066213 |53711| G| |D|0007.13 | G|49998|0044338 DRAWING DATA=7066213 |53711| G| |D|0007.14 | G|49998|0042833 DRAWING DATA=7066213 |53711| G| |D|0007.15 | G|49998|0043556 DRAWING DATA=7066213 |53711| G| |D|0007.16 | G|49998|0044068 DRAWING DATA=7066213 |53711| G| |D|0007.17 | G|49998|0044285 DRAWING DATA=7066213 |53711| G| |D|0007.18 | G|49998|0043993 DRAWING DATA=7066213 |53711| G| |D|0007.19 | G|49998|0043250 DRAWING DATA=7066213 |53711| G| |D|0007.2 | G|49998|0044549 DRAWING DATA=7066213 |53711| G| |D|0007.20 | G|49998|0042219 DRAWING DATA=7066213 |53711| G| |D|0007.21 | G|49998|0045212 DRAWING DATA=7066213 |53711| G| |D|0007.22 | G|49998|0046027 DRAWING DATA=7066213 |53711| G| |D|0007.23 | G|49998|0043602 DRAWING DATA=7066213 |53711| G| |D|0007.24 | G|49998|0042852 DRAWING DATA=7066213 |53711| G| |D|0007.25 | G|49998|0038801 DRAWING DATA=7066213 |53711| G| |D|0007.26 | G|49998|0024962 DRAWING DATA=7066213 |53711| G| |D|0007.3 | G|49998|0045743 DRAWING DATA=7066213 |53711| G| |D|0007.4 | G|49998|0044250 DRAWING DATA=7066213 |53711| G| |D|0007.5 | G|49998|0043828 DRAWING DATA=7066213 |53711| G| |D|0007.6 | G|49998|0046947 DRAWING DATA=7066213 |53711| G| |D|0007.7 | G|49998|0047703 DRAWING DATA=7066213 |53711| G| |D|0007.8 | G|49998|0050956 DRAWING DATA=7066213 |53711| G| |D|0007.9 | G|49998|0045523 DRAWING DATA=7066213 |53711| G| |D|0008.1 | G|49998|0027996 DRAWING DATA=7066213 |53711| G| |D|0008.10 | G|49998|0054893 DRAWING DATA=7066213 |53711| G| |D|0008.11 | G|49998|0055410 DRAWING DATA=7066213 |53711| G| |D|0008.12 | G|49998|0055162 DRAWING DATA=7066213 |53711| G| |D|0008.13 | G|49998|0055061 DRAWING DATA=7066213 |53711| G| |D|0008.14 | G|49998|0054211 DRAWING DATA=7066213 |53711| G| |D|0008.15 | G|49998|0053424 DRAWING DATA=7066213 |53711| G| |D|0008.16 | G|49998|0053356 DRAWING DATA=7066213 |53711| G| |D|0008.17 | G|49998|0056310 DRAWING DATA=7066213 |53711| G| |D|0008.18 | G|49998|0056136 DRAWING DATA=7066213 |53711| G| |D|0008.19 | G|49998|0054113 DRAWING DATA=7066213 |53711| G| |D|0008.2 | G|49998|0053446 DRAWING DATA=7066213 |53711| G| |D|0008.20 | G|49998|0032469 DRAWING DATA=7066213 |53711| G| |D|0008.3 | G|49998|0051555 DRAWING DATA=7066213 |53711| G| |D|0008.4 | G|49998|0052356 DRAWING DATA=7066213 |53711| G| |D|0008.5 | G|49998|0051357 DRAWING DATA=7066213 |53711| G| |D|0008.6 | G|49998|0051958 DRAWING DATA=7066213 |53711| G| |D|0008.7 | G|49998|0054847 DRAWING DATA=7066213 |53711| G| |D|0008.8 | G|49998|0054832 DRAWING DATA=7066213 |53711| G| |D|0008.9 | G|49998|0053989 DRAWING DATA=7066213 |53711| G| |D|0009.1 | G|49998|0062838 DRAWING DATA=7066213 |53711| G| |D|0009.2 | G|49998|0062044 DRAWING DATA=7066213 |53711| G| |D|0009.3 | G|49998|0062475 DRAWING DATA=7066213 |53711| G| |D|0009.4 | G|49998|0064898 DRAWING DATA=7066213 |53711| G| |D|0009.5 | G|49998|0065634 DRAWING DATA=7066213 |53711| G| |D|0009.6 | G|49998|0065095 DRAWING DATA=7066213 |53711| G| |D|0009.7 | G|49998|0064683 DRAWING DATA=7066213 |53711| G| |D|0009.8 | G|49998|0065648 DRAWING DATA=7066213 |53711| G| |D|0009.9 | G|49998|0042105 DRAWING DATA=7066213 |53711| G| |D|0010 | A|49998|0375877 DRAWING DATA=7066213 |53711| G| |D|0011 | G|49998|0092692 DRAWING DATA=7066213 |53711| G| |D|0012 | G|49998|0227173 DRAWING DATA=7066213 |53711| G| |D|0013 | G|49998|0090766 DRAWING DATA=7066213 |53711| G| |D|0014 | G|49998|0102650 DRAWING DATA=7066213 |53711| G| |D|0015 | G|49998|0124935 DRAWING DATA=7066213 |53711| G| |D|0016 | G|49998|0153611 DRAWING DATA=7066213 |53711| G| |D|0017 | G|49998|0136497 DRAWING DATA=7066213 |53711| G| |D|0018 | G|49998|0023482 DRAWING DATA=7491198 |53711| A| |D|0001 | A|49998|0062651 DRAWING DATA=7491200 |53711| -| |D|0001 | -|49998|0204664 DRAWING DATA=7491201 |53711| -| |D|0001 | -|49998|0027720 DRAWING DATA=7491201 |53711| -| |D|0002 | -|49998|0051607 DRAWING DATA=7491201 |53711| -| |D|0003 | -|49998|0043155 DRAWING DATA=7491201 |53711| -| |D|0004 | -|49998|0068050 DRAWING DATA=7491201 |53711| -| |D|0005 | -|49998|0017950 DRAWING DATA=7491201 |53711| -| |D|0006 | -|49998|0069326 DRAWING DATA=7491201 |53711| -| |D|0007 | -|49998|0047752 DRAWING DATA=7491202 |53711| -| |D|0001 | -|49998|0016034 DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=QQ-N-286 | | |G |001207|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=MIL-STD-2132 | | |D |080310|F| |01| DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=A-A-59004 | | |B |181118|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 ;The Penetrator Assembly must be in accordance with Naval Sea Systems Command Drawing 7066213 Part Number 025, except as amplified or modified herein.; 3.2 ;General Note 4 on NAVSEA Drawing 5615883 which states "Assemble according to LaBarge Document# 5615879w/ 5613012" and General Note 5 on NAVSEA Drawing 5615883 which states "Inspect and test according to LaBarge Document ITI #574" are not applicable.; 3.3 ;Penetrator wiring must be modified per EB Specification 4707. Hook up of the penetrator conductors to the penetrator header assembly must follow the color code convention of EB Specification 4707. Inboard ends of wires and shields extending from the penetrator header assembly must be marked with the pin number to which they are attached.; 3.4 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required. 3.5 ;The FAT sample(s) must not be delivered against the contract quantity.; 3.6 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Body, Part 306/1-001 on drawing PSSSN21C-306; Material - ;QQ-N-286, annealed and Age Hardened (Mechanical properties to be in accordance with PSSSN21C-306 PARA 3.3.2).; Part - ;Nut, Part 306/1-006 on drawing PSSSN21C-306; Material - ;QQ-N-286, Annealed and Age Hardened (Mechanical Properties to be in accordance with PSSSN21C-306 PARA 3.3.2.); Part - ;Inboard cable assembly (header only), Part 306/1-013 on drawing PSSSN21C-306; Material - ;QQ-N-286, Annealed and Age Hardened (Mechanical Properties to be in accordance with PSSSN21C-306 PARA 3.3.2.); Part - ;Washer, Part 306/1-007 on drawing PSSSN21C-306; Material - ;QQ-N-286, Annealed and Age Hardened (Mechanical Properties in accorance with PSSSN21C-306 PARA 3.3.2); 3.7 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below. Test - ;Dye Penetrant Inspection; Item - ;Body, nut, Header, and Washer; Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - Ultrasonic Inspection on Starting Material Item - ;All Items requiring certification made from QQ-N-286 with a diameter or minimum distance between parallel surfaces of 4 inches or greater of the starting material, or when required by a drawing or specification invoked elsewhere in this contract; Performance - T9074-AS-GIB-010/271 or MIL-STD-2132, and QQ-N-286 Acceptance - QQ-N-286 Attribute - Annealing and Age Hardening Item - ;Body, Nut, Washer, and Header; Performance - QQ-N-286 Test - Quality Conformance/Compliance Inspection Item - ;Each Penetrator Assembly; Performance - ;Drawing 7491201 Table 7; Acceptance - ;Drawing 7491201 Table 7; 3.8 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test of QQ-N-286 must be performed by one of the following laboratories: Huntington Alloys, a Special Metals Company Attn: Bill Bolenr 3200 Riverside Drive Huntington, WV 257059 Phone: (304) 526-5889 FAX: (304) 526-5973 Metallurgical Consultants, Inc. Attn: W. M. Buehler 4820 Caroline PO Box 88046 Houston, TX 77288-0046 Phone: (713) 526-6351 FAX: (713) 526-2964 Naval Surface Warfare Center, Carderock Division Attn: Eric Focht Code 614 9500 Macarthur Blvd West Bethesda, MD 20817-5700 Phone: (301) 227-5032 FAX: (301) 227-5576 Teledyne Allvac Attn: Dr. W. D. Cao 2020 Ashcraft Ave. Monroe, NC 28110 Phone: (704) 289-4511 FAX: (704) 289-4269 Westmoreland Mechanical Testing and Research Inc. Attn: Andrew Wisniewski P.O. Box 388 Youngstown, PA 15696-0388 Mannesmann Rohrenwerke Mannesmann Forschungsinstitut (MFI) Attn: Dr. Weiss Postfach 251160 47251 Duisburg Germany Phone: 011-49-0203-9993194 FAX: 011-49-0203-9994415 ThyssenKrupp VDM USA, Inc. Attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 Houston, TX 77065-4939 Phone: (281) 955-6683 3.9 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.9.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.9.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.9.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.10 Thread Lubricant - Thread lubricants containing molybdenum disulfide must not be used on this maMore from United States Department of the Navy posted in August 2024