ClickCease DBB Replace Chiller Construction in Building 6 at the Naval… | Closed - MatchAwards

DBB Replace Chiller Construction in Building 6 at the Naval Support Activities (NSA), Philadelphia PA

Status
Closed, the response deadline passed on Jun 10, 2024
Agency
United States Department of the Navy
Office
NORFOLK, USA
Notice type
Sources Sought
Solicitation number
N4008524R2707
NAICS
238220 - Plumbing, Heating, and Air-Conditioning Contractors
PSC
N045 - INSTALLATION OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT
Category
Facility Related Services (4.4)
Set-aside
8(a) Set-Aside (FAR 19.8)
Posted
2024-05-31
Deadline
2024-06-10
Place of performance
Philadelphia, Pennsylvania 19111, UNITED STATES

Description

This project is a Design-Bid-Build contract for the construction to remove and replace the existing chillers currently serving Building 6. This project involves removable and replacement of the existing chillers. The work will require minor piping modification, provide new power and controls. The result of this construction work shall replace the aging chillers that requires constant maintenance to a more efficient and reliable chillers.

The existing Mechanical Room at Building 6 contains multiple piping, ductwork, electrical conduits, cable trays and major HVAC equipment. The existing chillers are located at the back of the Mechanical Room. The rollup door shall remain in place and existing opening to remain as is. The new chillers has to fit thru the existing roll up door opening and will require major rigging for the new chillers to fir thru various existing equipment within the Mechanical Room in order for it to be installed to its previous locations.

The new chillers is a direct fit which matches the existing foot print and nozzle locations with the existing chillers. The new chiller will not require major removal and replacements of the existing piping and valve systems. Due to its matching foot print, the new chillers can utilize the existing concrete pads. This will eliminate the need to jack hammer the existing concrete, removal of existing re-bars in order to provide the new equipment pads. Jack hammering will also create additional unwanted noise which will disturb administrative offices and cubicles located beside the Mechanical Room.

Source notice

More from United States Department of the Navy posted in June 2024

More lists