ClickCease MODIFIED CPU CARD (N0010424QFB24) | Closed - MatchAwards

MODIFIED CPU CARD

Status
Closed, the response deadline passed on Jun 14, 2024
Agency
United States Department of the Navy
Office
MECHANICSBURG, USA
Notice type
Solicitation
Solicitation number
N0010424QFB24
NAICS
334412 - Bare Printed Circuit Board Manufacturing
PSC
5998 - ELECTRICAL AND ELECTRONIC ASSEMBLIES, BOARDS, CARDS, AND ASSOCIATED HARDWARE
Posted
2024-05-24
Deadline
2024-06-14

Description

CONTACT INFORMATION|4|N743.49|WYB|7176052147|benjamin.t.spangler.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |N/A|TBD|N00104|TBD|S3306A|SV3216|TBD|FBW-SFCC|N/A|N/A|N39040 - Certifications |N/A|N/A|SEE DD FORM 1423 |Benjamin.t.s pangler.civ@us.navy.mil| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC (NOV2023))|5|||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2023))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)|13|334412|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1.DD1423 Data Item A001 and A002(Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed here in. 3. This is a sole source requirement. 4. Vendor will comply with NAVSUPWSS24LN or NAVSUPWSS25LN, CAV NAVSUP text. 5. Please submit: NOT TO EXCEED (NTE) pricing or FIRM FIXED PRICE (FFP). Pleasealso provide an approximate cost of new item if available. 6. A beyond repair/beyond economical repair price shall also be provided in addition to the repair price at the time of submission of quote. 7. Do not include the cost for shipping material as the government-implemented shipping system or ATAC will be shipping/delivering material. 8. After award, a repair proposal shall be submitted to NAVSUP WSS PCO and order will be definitized for the final repair cost and extend delivery. 9. This order is issued pursuant to Emergency Acquisition Flexibilities (EAF). 10. This requirement includes a confidential drawing. The confidential nature includes a DD254 requirement. 1. SCOPE 1.1 The material identified in this contract/purchase order will be used in a crucial shipboard system; therefore this material has been designated as a Naval Critical Safety Item (CSI) and identified with a Special Material Identification Code (SMIC) which identifies this NIIN as a Fly-By-Wire (FBW) Submarine Flight Critical Component (SFCC). A CSI is any ship part, assembly, or support equipment containing a critical characteristic whose failure, malfunction, or absence may cause a catastrophic or critical failure resulting in loss or serious damage to the ship, or unacceptable risk of personal injury or loss of life. As such, special control procedures are invoked to assure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DOCUMENT REF DATA=MIL-STD-1686 | | |C |951025|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO 9002 | | | |940701|A| | | DOCUMENT REF DATA=MIL-Q-9858 | | |A |950905|A|3 | | DOCUMENT REF DATA=ISO10012 | | | |080415|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | 3. REQUIREMENTS 3.1 REFURBISHED MATERIAL STATEMENT OF WORK (REPAIR SOW) - 3.1.1 INSPECTION - Clean and determine if refurbishment is possible. At disassembly, the Contractor must record all identifying markings found on the parts of each assembly. The Contractor must maintain traceability of these markingsto each unit throughout refurbishment. 3.1.2 RE-USEABLE PARTS - Any parts of the original assembly that are useable (replacement is not necessary), may be utilized as initially supplied. 3.1.3 NON-USEABLE PARTS - Any parts of the original assembly that are not usable (replacement is necessary) must be in accordance with this TDP (Technical Data Package). 3.1.4 REFURBISHMENT - Upon completion of inspection, this item must be refurbished to be in accordance with ;03538 77A122491G1; , except as amplified or modified herein. This applies to all "Parts Requiring Certification" as identified elsewhere in this Contract/Purchase Order. 3.1.5 Additional SOW Requirements - ;N/A; 3.2 Electrostatic Discharge Control - The Contractor must comply with the electrostatic discharge control requirements established in MIL-STD-1686. 3.3 Security Clearance Required - This contract/purchase order requires the Contractor to have a Government Security Clearance in accordance with the attached Contract Security Classification Specification (DD Form 254). 3.4 NAVSEA T9044-AD-MAN-010 REQUIREMENTS MANUAL FOR SUBMARINE FLY-BY-WIRE SHIP CONTROL SYSTEMS - All applicable elements of NAVSEA T9044-AD-MAN-010 for which the contractor must comply, are included in this contract or purchase order. NAVSEA T9044-AD-MAN-010 is for official use only and distribution is to comply with Distribution Statement D. 3.5 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.5.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Major or Minor. The Contractor must provide a copy of this request to the QAR. Requests for Waivers/Deviations must be prepared using form LI/DSS/SFCC WD-1 (Local) or in Contractor format, and must include the following information: a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Major or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. e. All major deviations or waivers (non-conformances) must be submitted to the NAVSEA Submarine Program Manager for disposition. 3.5.2 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.6 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.7 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with MIL-I-45208, MIL-Q-9858, or ISO9001:2008 (except as amplified or modified herein) with the calibration system requirements of MIL-STD-45662, ISO10012, or ANSI-Z540.3. Quality systems in accordance with ISO9001:2000, ISO9001:1994, or ISO9002:1994 are acceptable alternates. 3.7.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/non-acceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.7.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.7.3 See CDRL DI-QCIC-81110 (INSPECTION SYSTEM/QA PROCEDURE) - All suppliersof Fly-By-Wire (FBW) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.7.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.7.5 Any changes made by the Contractor to a qualified quality system will require concurrence by the Government Quality Assurance Representative prior to adoption. 3.8 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected, and the nature of corrective action taken as appropriate. 3.8.1 The supplier's calibrated gages that measure and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.8.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.9 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.10 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.10.1 Visual examination upon receipt to detect damage during transit. 3.10.2 Inspection for completeness and proper type. 3.10.3 Verification of material quality received. 3.10.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.10.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.10.6 Identification and protection from improper use or disposition. 3.10.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.10.8 For GFE material, and as required by the terms of the bailment agreement the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.10.9 Material returned to the contractor must be handled as GFM. 3.11 Traceability and Certification Requirements - To assure that correct materials are installed in FBW SCS SFCC systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3, Section C of this contract/purchase order. 3.11.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-80678 and elsewhere in the contract/purchase order. 3.12 Material Traceability - Material traceability codes must be permanently applied to the material and annotated on test reports for each individual SFCC. Traceability marking must be a unique vendor traceability number/code, or a combination thereof to maintain complete traceability to certification OQE. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.13 Receiving Inspection: 3.13.1 SFCC certifying activities must conduct material receipt inspections of all SFCCs and SFCC components to ensure they meet the form and fit requirements of the invoked specifications. Further, SFCCs must be receipt inspected in accordance with the material specification requirements invoked in this contract/purchase order and all contractually invoked waivers, deviations, and engineering changes. 3.13.2 Receipt inspection processes must be performed using approved formal inspection procedures that specify the SFCC attributes and the inspections and tests that are required. 3.13.3 SFCC certifying activities must conduct functional performance testing on all SFCCs to verify the individual SFCCs meet the invoked system and component performance specification. 3.13.4 SFCC material receipt inspection and functional performance testing procedures must be developed by SFCC certifying activities and submitted to the Submarine Program Manager for approval with the concurrence of NAVSEA 05Z and 07Q. The SFCC Receipt Inspection and Performance Test procedures must specify the applicable accept and reject criteria for each SFCC and provide direction for performing the inspections and testing and recording the results. 3.14 Material Handling: 3.14.1 Material handling and control procedures must provide methods for controlling SFCCs from fabrication and certification through issue, receipt, and inspection. 3.14.2 FBW SCS SFCCs that are awaiting or undergoing manufacture, inspection, or awaiting or undergoing certification, must be physically segregated from accepted, rejected, or non-SFCCs to prevent commingling and unauthorized use. Segregation may be accomplished by use of separate cages, racks, bins, shelves, boxes, or roped-off areas that are distinctly marked for FBW SCS SFCCs. 3.14.3 Material control tags must be used to positively identify FBW SCS SFCCin transit to avoid unauthorized movement, commingling, and improper use. 3.14.4 Staging of FBW SCS SFCCs with other electronic components is acceptable for a specific job or fabrication process involving more than one component, provided the component is clearly marked as required and the component for the specific job or fabrication process is grouped together, identified by the job or process number, and segregated from components grouped for other processes or jobs. 3.14.5 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability. 3.14.6 W

Source notice

More from United States Department of the Navy posted in May 2024

More lists