<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_navy/posts/112488910872080039" -->

---
title: 17--CYLINDER ASSEMBLY,T (N0038324QC462) | Closed - MatchAwards
description: 17--CYLINDER ASSEMBLY,T. United States Department of the Navy. Solicitation N0038324QC462. NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing. Deadline 2024-06-10. CONTACT INFORMATION|4|N792.10|T2Q|215-697-9948|KIMBERLY.FLORES12.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION...
canonical: https://matchawards.com/dept_of_the_navy/posts/112488910872080039
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: 17--CYLINDER ASSEMBLY,T (N0038324QC462) | Closed
og:url: https://matchawards.com/dept_of_the_navy/posts/112488910872080039
og:description: 17--CYLINDER ASSEMBLY,T. United States Department of the Navy. Solicitation N0038324QC462. NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing. Deadline 2024-06-10. CONTACT INFORMATION|4|N792.10|T2Q|215-697-9948|KIMBERLY.FLORES12.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION...
og:image: https://matchawards.com/system/accounts/avatars/000/000/085/original/a0262fe00d6c038b.png?1638992122
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# 17--CYLINDER ASSEMBLY,T

Status

Closed, the response deadline passed on Jun 10, 2024

Agency

[United States Department of the Navy](/dept%5Fof%5Fthe%5Fnavy)

Office

PHILADELPHIA, USA

Notice type

Solicitation

Solicitation number

N0038324QC462

NAICS

[336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing](/groups/560)

PSC

1720 - AIRCRAFT LAUNCHING EQUIPMENT

Posted

2024-05-22

Deadline

2024-06-10

## Description

CONTACT INFORMATION|4|N792.10|T2Q|215-697-9948|KIMBERLY.FLORES12.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|X||||||||||||X|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING (COMBO) TYPE||TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF DATA - BASIC (MAR 2014)|2||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC (FEB 2024))|11|||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FEB 2024)|13|336413|1250|||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||DO-A1C| EVALUATION OF FIRST ARTICLE TESTING|3|||| 1\. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130\. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995\. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.4 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.5 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.6 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.8 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.9 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;613665-2; ) ;80020; , Revision ;P; and all details and specifications referenced therein. 1.11 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.12 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2\. APPLICABLE DOCUMENTS DRAWING DATA=A414463 |80020| V| |A| | | | DRAWING DATA=A91477 |80020|23| |A| | | | DRAWING DATA=B414463 |80020| Y| |A| | | | DRAWING DATA=MPR1222 |80020| A| |D| | | | DRAWING DATA=MPR1223 |80020| C| |D| | | | DRAWING DATA=323201 |80020| E| |D| | | | DRAWING DATA=416325 |80020| H| |D| | | | DRAWING DATA=416334 |80020| G| |D| | | | DRAWING DATA=416451 |80020| M| |D| | | | DRAWING DATA=416540 |80020| H| |A| | | | DRAWING DATA=416543 |80020| P| |A| | | | DRAWING DATA=416574 |80020| D| |A| | | | DRAWING DATA=416578 |80020| K| |D| | | | DRAWING DATA=416618 |80020| D| |A| | | | DRAWING DATA=416620 |80020| D| |A| | | | DRAWING DATA=416621 |80020| F| |D| | | | DRAWING DATA=416622 |80020| G| |D| | | | DRAWING DATA=416623 |80020| F| |D| | | | DRAWING DATA=416631 |80020| H| |D| | | | DRAWING DATA=510941 |80020| M| |D| | | | DRAWING DATA=511228 |80020| L| |D| | | | DRAWING DATA=511229 |80020| F| |D| | | | DRAWING DATA=511230 |80020| L| |D| | | | DRAWING DATA=511231 |80020| J| |D| | | | DRAWING DATA=511232 |80020| J| |D| | | | DRAWING DATA=511234 |80020| M| |A| | | | DRAWING DATA=511235 |80020| P| |A| | | | DRAWING DATA=613665 |80020| P| |D| | | | DRAWING DATA=613881 |80020| J| |D| | | | 3\. REQUIREMENTS - NOT APPLICABLE 4\. QUALITY ASSURANCE Unique Requirement: b. All records pertaining to ALRE CAI manufacture and inspection/test shall be provided to the ALRE Cognizant TechnicalAuthority. All records shall be maintained by LKE QA and by the manufacturerfor a period of seven years. QUALITY ASSURANCE REQUIREMENTS: 1\. First Article Testing: The contractor shall conduct First Article testing on this item of ALRE/SE and must address all elements listed below and prepare a First Article Test Report documenting the outcome. Unless otherwise specified, the report and its acceptance shall be per the provisions of the applicable Contract Data Requirements List (CDRL). a. Requirements: i. First Article quantity is one (1); in uncoated condition. ii. The First Article shall be available for Government evaluation per the contract schedule. The Evaluation shall be conducted in the presence of the Government personnel. Accordingly, the contractor shall allow time to arrange for NAWC participation in accordance with the "NAWCADLKE Inspection Witness Option"; iii. The contractor shall provide facilities and personnel sufficient to conduct all necessary tests to establish conformance; iv. The contractor shall have available for review all certifications, test reports, in-process inspection documents needed to substantiate product quality; this same documentation shall also be included in the First Article test report; v. The contractor shall, at the time of First Article, have corrected any problem areas deemed significant and documented as deficient by the Government within his/her Quality Assurance system not previously identified during prior evaluations and/or surveys; any problems identified during the conduct of the test will also require correction. b. Testing and evaluation: i. The contractor shall accomplish 100% inspection and/or testing of all critical, major, and minor dimensions and/or requirements identified in the drawings, drawing notes, and process and fabrication specifications. Results shall consist of actual dimensions, measurements, and test outcomes and shall be recorded and included in the First Article test report. c. Acceptance/reject criteria: i. Satisfactorily meeting all requirements cited in paragraph 7a and satisfactorily demonstrating 100% conformance to the test and evaluation elements cited in paragraph 7.b shall constitute acceptance of the First Article; ii. Failure to meet any of the conditions in paragraph 7.a and 7.b shall be cause for rejection. d. Delivery: i. The accepted First Article exhibit may be delivered and counted along with the contract production quantities providing the item has not been damaged during testing, and has been found to be conforming; ii. The contractor is responsible for preparing the First Article Test Report in accordance with CDRL's. 2\. For purposes of this TDR, the term NDT shall refer to the following methods:MT - Magnetic Particle Testing, PT - Penetrant Inspection, UT - Ultrasonic Testing, RT - Radiographic Testing, and VT - Visual Testing. 3\. Companies performing NDT shall be NADCAP accredited, or a laboratory accredited by one of the organizations listed below as satisfying ISO 17025 (General requirements for the competence of testing and calibration laboratories). NDT certificates shall be bear the symbols of accreditation and the accreditation body. a. American Association for Laboratory Accreditation (A2LA) b. ANSI National Accreditation Board (ANAB) c. International Accreditation Service, Inc. (IAS) d. National Voluntary Laboratory Accreditation Program (NVLAP) e. Perry Johnson Laboratory Accreditation, Inc. (PJLA) f. Canadian Association for Laboratory Accreditation Inc. (CALA) g. Standards Council of Canada (SCC) 4.1 Review documentation as provided under DD 1423 requirements. 4.2 CRITICAL MANUFACTURING PROCESSES ( ;APPLIES; ) HEAT TREAT ( ;APPLIES; ) WELDING ( ;N/A; ) CADMIUM PLATING ( ;N/A; ) ENGINEERING CHROME PLATING ( ;N/A; ) NICKEL CHROME PLATING ( ;N/A; ) CASTING(S) ( ;N/A; ) FORGING(S) ( ;APPLIES ; ) MPR (MATERIAL PROCESSING REQUIREMENTS) 4.3 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below 4.3.1 Dimensional test (special) ;CLOSE MACHINE TOLERANCES; 4.3.2 Requirements of: ;LKE DRAWING PACKAGE; 4.3.3 Form ;APPLIES; 4.3.4 Fit ;N/A; 4.3.5 Function ;APPLIES; 4.3.6 Compliance with drawing ( ;80020; ) ;613665; , Revision ;P; and specifications referenced therein. 4.4 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements 4.5 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection 4.6 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing. 4.6.1 The QAR shall be present to witness all First Article Testing. 4.6.2 The following additional personnel shall witness the First Article Testing: ;Roy Janney NAWCADLKE QA / Tel: (732)-323-2834 E-mail: roy.a.janney.civ@us.navy.mil; 4.7 Disposition of FAT samples 4.7.1 ; ; Sample(s) may be destroyed during testing. 4.7.2 ;APPLIES; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. 4.8 Test Sample Coating Instructions 4.8.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required. 4.9 Notice to Government of Testing at the contractors facility. 4.9.1 FAR 52.209-3 applies (A) The contractor shall present ;ONE; ; unit(s) of the following CAGE( ;80020; ; ), Part Number ;613665-2; ; , Revision ;P; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests. (B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;PCO; ; The contractor shall mark the report "First Article Test Report" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements. (C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional approval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval. (D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. (E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract. (F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for acceptance. (G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. (H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be allocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair of the First Article during any First Article test. (I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article. (J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on Form DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test report. 4.10 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate) (A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article 

<!-- mobian-agent-ad sponsored="true" id="df59305b-989f-42aa-9c64-688cf757076d" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


[Source notice](https://sam.gov/opp/7b204c22acb14904ab84c515864c0b8e/view)

[More from United States Department of the Navy posted in May 2024](/dept%5Fof%5Fthe%5Fnavy/archive/2024-05)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"17--CYLINDER ASSEMBLY,T","description":"CONTACT INFORMATION|4|N792.10|T2Q|215-697-9948|KIMBERLY.FLORES12.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|X||||||||||||X|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING (COMBO) TYPE||TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF DATA - BASIC (MAR 2014)|2||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC (FEB 2024))|11|||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FEB 2024)|13|336413|1250|||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||DO-A1C| EVALUATION OF FIRST ARTICLE TESTING|3|||| 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.4 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.5 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.6 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.8 For minor characteristics, a sampling rate determined by the contractor and...","url":"https://matchawards.com/dept_of_the_navy/posts/112488910872080039","identifier":"N0038324QC462","category":"336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"1720 - AIRCRAFT LAUNCHING EQUIPMENT"}],"availabilityStarts":"2024-05-22","availabilityEnds":"2024-06-10","validThrough":"2024-06-10T23:59:59-04:00","sameAs":"https://sam.gov/opp/7b204c22acb14904ab84c515864c0b8e/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Manufacturing","item":"https://matchawards.com/contracts/manufacturing"}]}
```

