59--STUFFING TUBE
- Status
- Closed, the response deadline passed on May 22, 2024
- Agency
- United States Department of the Navy
- Office
- MECHANICSBURG, USA
- Notice type
- Solicitation
- Solicitation number
- N0010424RFC58
- NAICS
- 332710 - Machine Shops
- PSC
- 5975 - ELECTRICAL HARDWARE AND SUPPLIES
- Posted
- 2024-05-08
- Deadline
- 2024-05-22
Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specification section C| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| TIME OF DELIVERY (JUNE 1997)|20|0001AA|4740|600|0001AB|1 Lot|see DD 1423|0001AC|1|180|||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Material - Invoice & Receiving Report (COMBO) Certifications - Stand-Alone Receiving Report|Material - Inspection & Acceptance at SOURCE Certifications - Inspection at DESTINATION & Acceptance at OTHER |TBD|N 00104|TBD|Material-S4306A; Certifications-N39040|N50286|TBD|133.2|NA|NA|Certifications-N39040|NA|NA|See DD Form 1423|PORT_PTNH_WAWF_Notification@navy.mil| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| LIMITATION OF GOVERNMENT LIABILITY (APR 1984)|2|TBD|TBD| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| SUBCONTRACTS (JUN 2020)|2||| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from the date of delivery |one year from the date of delivery ||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (SEP 2023)|4||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (JAN 2023)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|1|0001AC|7|180 |See DD 1423|TBD|0001AC|120|x|| PROGRESS PAYMENTS (NOV 2021)|4||||| CONTRACT DEFINITIZATION (OCT 2010)|9|firm fixed price||TBD||||||| LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)|1|| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA-MODIFICATIONS (NOV 2021))|7|||||||| LIST OF SOLICITATION ATTACHMENTS|5|x|all|x|x|x| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13|||||||||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FEB 2024)|13|332710|500|||||||||||| COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEVIATION 2018-O0015)(MAY 2018))|1|| TYPE OF CONTRACT (APR 1984)|1|firm fixed product| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIEDCOST OR PRICING DATA--BASIC (FEB 2024))|1|| EVALUATION OF FIRST ARTICLE TESTING|3|||x| 1. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 2. Any contract/order awarded as a result of this solicitation will be a "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). See 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use. 3. Unless otherwise stated on the DD1423, submission of DD1423 certification data (CDRLs) will be on or before 20 days prior to the material delivery date. PNSY review/acceptance of CDRLs shall be 6 working days after receipt of CDRLs. Final delivery of material will be on or before 500 days after the effective date of the contract. 4. The proposed contract action is for supplies or services for which the Government intends to solicit and negotiate with only one source under the authority of FAR 6.302-1. The Government does not own the data or the rights to the data needed to purchase this part from additional sources. A determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. 5. Note to distributors/dealers: If you are a distributor, your offer must be accompanied with a letter from the actual manufacturer indicating that you are an "authorized" distributor. If you are a dealer, your offer must be accompanied with a statement clearly identifying your firm as a dealer along with the OEM's name, CAGE, and P/N that you intend on providing. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.2 ;TR-317B transducer elements and receptacle end seal assemblies necessary to conduct the tests required by TR-317 Hull Penetrator First Article and Quality Conformance Test Specifications must be supplied to the successful bidder. The successful bidder must contact the Naval Undersea Warfare Center Division Newport, RI, Transducer In-Service Engineering Agent NUWC_NPT_1535_TransducerISEA@navy.mil, (401) 832-4931 to obtain the required units. After completion of testing the successful bidder will forward the units to the receipt inspection activity.; 1.3 ;TR-317B transducer elements and receptacle end seal assemblies necessary to conduct the tests required by TR-317 Hull Penetrator First Article and Quality Conformance Test Specifications shall be supplied to the successful bidder. The successful bidder shall contact the Naval Undersea Warfare Center Division Newport, RI, Transducer In-Service Engineering Agent NUWC_NPT_1535_TransducerISEA@navy.mil, (401) 832-4931 to obtain the required units. After completion of testing the successful bidder will forward the units to the receipt inspection activity.; 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.3 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. DRAWING DATA=03411001 |88594| -| |D|0001 | -|49998|0172863 DRAWING DATA=03411001 |88594| A|DL |D|0001 | A|49998|0034504 DRAWING DATA=03411002 |88594| H| |D|0001 | H|49998|3673269 DRAWING DATA=03411003 |88594| A| |D|0001 | A|49998|0743103 DRAWING DATA=03411004 |88594| -| |D|0001 | -|49998|0112150 DRAWING DATA=03411005 |88594| -| |D|0001 | -|49998|0070342 DRAWING DATA=03411008 |88594| -| |D|0001 | -|49998|0054085 DRAWING DATA=03411009 |88594| A| |D|0001 | A|49998|0024810 DRAWING DATA=03411010 |88594| A| |D|0001 | A|49998|0026695 DRAWING DATA=03411011 |88594| -| |D|0001 | -|49998|0052217 DRAWING DATA=03411012 |88594| -| |D|0001 | -|49998|0048271 DRAWING DATA=03412001 |88594| -| |D|0001 | -|49998|0059657 DRAWING DATA=03412001 |88594| -|DL |D|0001 | -|49998|0441212 DRAWING DATA=03412003 |88594| -| |D|0001 | -|49998|0059560 DRAWING DATA=8192757 |53711| B|TS |D|0000.COV | B|49998|0079990 DRAWING DATA=8192757 |53711| B|TS |D|0001 | B|49998|0082446 DRAWING DATA=8192757 |53711| B|TS |D|0002 | B|49998|0080672 DRAWING DATA=8192757 |53711| B|TS |D|0003 | B|49998|0080697 DRAWING DATA=8192757 |53711| B|TS |D|0004 | B|49998|0080675 DRAWING DATA=8192757 |53711| B|TS |D|0005 | B|49998|0079861 DRAWING DATA=8192757 |53711| B|TS |D|0006 | B|49998|0080539 DRAWING DATA=8192757 |53711| B|TS |D|0007 | B|49998|0080385 DRAWING DATA=8192757 |53711| B|TS |D|0008 | B|49998|0080652 DRAWING DATA=8192757 |53711| B|TS |D|0009 | B|49998|0080471 DRAWING DATA=8192757 |53711| B|TS |D|0010 | B|49998|0105395 DRAWING DATA=8192757 |53711| B|TS |D|0011 | B|49998|0080821 DRAWING DATA=8192757 |53711| B|TS |D|0012 | B|49998|0080670 DRAWING DATA=8192757 |53711| B|TS |D|0013 | B|49998|0080882 DRAWING DATA=8192757 |53711| B|TS |D|0014 | B|49998|0080863 DRAWING DATA=8192757 |53711| B|TS |D|0015 | B|49998|0080906 DRAWING DATA=8192757 |53711| B|TS |D|0016 | B|49998|0080770 DRAWING DATA=8192757 |53711| B|TS |D|0017 | B|49998|0110761 DRAWING DATA=8192757 |53711| B|TS |D|0018 | B|49998|0085519 DRAWING DATA=8192757 |53711| B|TS |D|0019 | B|49998|0080949 DRAWING DATA=8192757 |53711| B|TS |D|0020 | B|49998|0085664 DRAWING DATA=8192757 |53711| B|TS |D|0021 | B|49998|0080790 DRAWING DATA=8192757 |53711| B|TS |D|0022 | B|49998|0080465 DRAWING DATA=8192757 |53711| B|TS |D|0023 | B|49998|0080674 DRAWING DATA=8192757 |53711| B|TS |D|0024 | B|49998|0108815 DRAWING DATA=8192757 |53711| B|TS |D|0025 | B|49998|0101461 DRAWING DATA=8192757 |53711| B|TS |D|0026 | B|49998|0080632 DRAWING DATA=8192757 |53711| B|TS |D|0027 | B|49998|0080359 DRAWING DATA=8192757 |53711| B|TS |D|0028 | B|49998|0094045 DRAWING DATA=8192757 |53711| B|TS |D|0029 | B|49998|0085804 DRAWING DATA=8192757 |53711| B|TS |D|0030 | B|49998|0080346 DRAWING DATA=8192757 |53711| B|TS |D|0031 | B|49998|0091717 DRAWING DATA=8192757 |53711| B|TS |D|0032 | B|49998|0090964 DRAWING DATA=8192757 |53711| B|TS |D|0033 | B|49998|0096753 DRAWING DATA=8192757 |53711| B|TS |D|0034 | B|49998|0100170 DRAWING DATA=8192757 |53711| B|TS |D|0035 | B|49998|0080892 DRAWING DATA=8192757 |53711| B|TS |D|0036 | B|49998|0080538 DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-B150 | | | |190401|A| | | DOCUMENT REF DATA=QQ-N-281 | | |D |851023|A| 2| | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=A-A-59004 | | |B |181118|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | DOCUMENT REF DATA=S9320-AM-PRO-020/MLDG | | |2 |990801|A| | | DOCUMENT REF DATA=S9320-AM-PRO-030/MLDG | | |3 |050201|A| | | 3. REQUIREMENTS 3.1 ;The complete TR-317B/BQ Hull Penetrator Assembly EBPN 03411001 must be in accordance with Naval Underwater Systems Center Drawing 03411001 (less Find Number 2) and Naval Sea Systems Command Drawing 8192757, except as amplified or modified herein.; 3.1.1 ;Note 6 on Drawing 03411001 must be changed to reflect drawing 8192757, TR-317 Hull Penetrator First Article and Quality Conformance Test Specifications.; 3.1.2 ;NOTE: Prior to application of the Rubber Mold, the surface finish of the Penetrator must be visually inspected. Evidence of adverse reaction between the neoprene primer and phenolic sealer is not acceptable.; 3.1.3 ;The correct material for the set screw per NUSC Drawing 03411010 is to be in accordance with Naval Sea Systems Command Drawing 8192757, paragraph 3.2.9.; 3.1.4 ;The inboard cable assembly per Naval Underwater Systems Center Drawing 03411003, and the hull insert assembly per Naval Underwater Systems Center Drawings 03412001, 03412001-DL, and 03412003 are referenced for first article test equipment as necessary per Naval Sea Systems Command Drawing8192757.; 3.1.5 ;The requirement for hardness testing of molded rubber is not required, only required per the applicable rubber specification per lot/batch by the manufacturer.; 3.1.6 ;Delete references to Material Identification Code (MIC) requirements cited in NUSC Drawing 03411002, notes 11 and 12; NUSC Drawing 03411009, note 8; and NAVSEA Drawing 8192757 paragraph 3.3.15.1. A unique serial number, for material traceability purposes, must be applied to the Penetrator and to the Hex Nut, respectively, in lieu of the MIC.; 3.2 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required. 3.3 ;FAT must be conducted in accordance with NAVSEA Drawing 8192757 requirements. The First Article Test sample(s) must not be delivered against the contract quantity.; 3.4 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Hull Penetrator Body, Find Number 1 on Drawing 03411002; Material - ;QQ-N-281, Class A, Form 1 or Form 2, Condition Hot Finished and Stress Relieved or Cold Drawn and Stress Relieved, and with a minimum yield strength of 40 KSI at 0.2% offset; Part - ;Hex Nut on Drawing 03411009; Material - ;ASTM-B150, Alloy C63200, Temper TQ50; 3.5 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Test - Non-Destructive Tests Item - ;Weld Repair and/or Production Weld (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification Test - ;Dye Penetrant Inspection; Item - ;Hex Nut of Drawing 03411009; Performance - ;T9074-AS-GIB-010/271; Acceptance - ;No Cracks Allowed; Test - ;Dye Penetrant Inspection; Item - ;Each Hull Penetrator Assembly (After Glass Sealing and Molding); Performance - ;Paragraph 4.3.6 of Drawing 8192757; Acceptance - ;Paragraph 3.4.6 of Drawing 8192757; Test - Quality Conformance/Compliance Inspection Item - ;Hull Penetrator Assembly; Performance - ;Paragraph 3.4 and Table 1 of Naval Sea Systems Command Drawing 8192757; Acceptance - ;Paragraph 3.4 and Table 1 of Naval Sea Systems Command Drawing 8192757; 3.6 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.7 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded from the GAC foMore from United States Department of the Navy posted in May 2024