<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_navy/posts/112358652848367534" -->

---
title: 15--TANK,FUEL,AIRCRAFT (N0038324RP227) | Closed - MatchAwards
description: 15--TANK,FUEL,AIRCRAFT. United States Department of the Navy. Solicitation N0038324RP227. NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing. Deadline 2024-05-28. ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY...
canonical: https://matchawards.com/dept_of_the_navy/posts/112358652848367534
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: 15--TANK,FUEL,AIRCRAFT (N0038324RP227) | Closed
og:url: https://matchawards.com/dept_of_the_navy/posts/112358652848367534
og:description: 15--TANK,FUEL,AIRCRAFT. United States Department of the Navy. Solicitation N0038324RP227. NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing. Deadline 2024-05-28. ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY...
og:image: https://matchawards.com/system/accounts/avatars/000/000/085/original/a0262fe00d6c038b.png?1638992122
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# 15--TANK,FUEL,AIRCRAFT

Agency

[United States Department of the Navy](/dept%5Fof%5Fthe%5Fnavy)

Office

PHILADELPHIA, USA

Notice type

Solicitation

Solicitation number

N0038324RP227

NAICS

[336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing](/groups/560)

PSC

1560 - AIRFRAME STRUCTURAL COMPONENTS

Posted

2024-04-29

Deadline

2024-05-28

## Description

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|X||||||||||||X|||||||||||||| TIME OF DELIVERY (JUNE 1997)|20||||||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| FMS DELIVERY AND SHIPPING INSTRUCTIONS|3|||N52211.12, N52211.73, N52211.11| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|invoice and receiving report combo type||TBD|N00383|TBD|TBD|See Schedule|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect||||| SMALL BUSINESS SUBCONTRACTING PLAN (SEP 2023)|4||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (JAN 2023)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC (FEB 2024))|11|||||||||||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FEB 2024)|13|336413|1250|||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERSDELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. 1\. SCOPE 1.1 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;320-4-49753-101 OR 62002-5 IAW THE CURRENT REVISON.; drawing number ( ;320-4-49753-101 OR 62002-5 IAW THE CURRENT REVISON.; ) ;320-4-49753-101 OR 62002-5 IAW THE CURRENT REVISON.; , Revision ;320-4-49753-101 OR 62002-5 IAW THE CURRENT REVISON.; and all details and specifications referenced therein. 1.2 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2\. APPLICABLE DOCUMENTS - NOT APPLICABLE 3\. REQUIREMENTS - NOT APPLICABLE 4\. QUALITY ASSURANCE I. First Article Test (FAT) Requirements.The following requirements applyto AMFUEL tank two or tank three. The tests to be performed under the FAT approval clause of the contract are:Conduct all testing required by AMFUEL Report 2122 Rev M:F-18 Acceptance Test Procedure (ATP)non- self-sealing fuel Cells with the exceptions.A Vacuum Bag Method Phenolphthalein Test shall be conducted on the fuel cell once all ATP testing has successfully been completed Folding: In lieu of folding the fuel cell at a temperature not less than 70� folding shall take place at 60-65� Folding: In addition to the test described in the ATP, after fuel cell is confirmed to be folded to the proper size,it shall remain folded for 30min then inspected per MIL-STD-801D.This test must be performed once prior to the final leakage test. Sealant Activation test: In lieu of stand testing the cell for a minimum of seven(7)days when using WK1473 type III fluid or ten(10) days using JP-4/JP-8 fuel, the cell shall be stand tested for minimum of thirty (30) days using JP-4/JP-8 fuel. II. Samples. The contractor shall present one (1) unit(s). At least 45 days before First Article Testing, the contractor shall notify the PCO, in writing, so that the Navy may witness the testing. III. Testing Location and Estimated Lead-Time. No arrangements will be made for inspection of the sample(s) until the DCMA notifies the PCO that the contractor has inspected the sample and is 100% ready for inspectionby the Government team.The DCMA-QAR shall be present during the inspection team's visit to the manufacturing site to perform the FAT.IV. Test Report. The contractor shall prepare a FAT Report, which shall be in accordance withthe requirements of ISO-9012 (Aerospace First Article Inspection Requirement), MIL-HDBK-831 or equivalent, and shall be submitted via the cognizant DCMA Contract Administration Office to the PCO. sposition of First Article Test Sample(s).A. Sample(s) may be considered as production items under the contract provided the sample(s) can be refurbished to Ready for Issue (RFI) condition and provide the sample(s) have inspection approval of the cognizant QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment.B.The QAR shall provide comments on Form DD1222 which shall be forwarded with the FAT Report. The cognizant government inspecting activity shall issue a report accepting or rejecting the FAT sample(s). Final approval of the FAT Report is the responsibility of the PCO. Upon notification of approval/conditional approval the QAR shall provide disposition in the Wide-Area(WAWF) system or Form DD250 to indicate Government acceptance of the test report. 5\. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6\. NOTES - NOT APPLICABLE Procure from AmFuel (05476) 7RE1560-01-152-0846 P/N-62002-5H and Engineered Fabrics (56221) 7RE1560-01-446-7869 P/N-320-4-49753-101 DATE OF FIRST SUBMISSION=ASREQ UPON COMPLETION OF THE FIRST ARTICLE TEST. 

<!-- mobian-agent-ad sponsored="true" id="3ea7509b-6fae-43a5-8e3d-801f5c1dd5a6" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


[Source notice](https://sam.gov/opp/637583c38cb84c21a1ec3ab20e33ad3c/view)

[More from United States Department of the Navy posted in April 2024](/dept%5Fof%5Fthe%5Fnavy/archive/2024-04)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"15--TANK,FUEL,AIRCRAFT","description":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|X||||||||||||X|||||||||||||| TIME OF DELIVERY (JUNE 1997)|20||||||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| FMS DELIVERY AND SHIPPING INSTRUCTIONS|3|||N52211.12, N52211.73, N52211.11| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|invoice and receiving report combo type||TBD|N00383|TBD|TBD|See Schedule|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect||||| SMALL BUSINESS SUBCONTRACTING PLAN (SEP 2023)|4||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (JAN 2023)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC (FEB 2024))|11|||||||||||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FEB 2024)|13|336413|1250|||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERSDELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE \"ISSUED\" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO \"ISSUE\" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. 1. SCOPE 1.1 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;320-4-49753-101 OR 62002-5 IAW THE CURRENT REVISON.; drawing number ( ;320-4-49753-101 OR 62002-5 IAW THE CURRENT REVISON.; ) ;320-4-49753-101 OR 62002-5 IAW THE CURRENT REVISON.; , Revision ;320-4-49753-101 OR 62002-5 IAW THE CURRENT REVISON.; and all details and specifications referenced therein. 1.2 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE I. First Article Test (FAT) Requirements.The following requirements applyto AMFUEL tank two or tank three. The tests to be performed under the FAT approval clause of the contract are:Conduct all testing required by AMFUEL Report 2122 Rev M:F-18 Acceptance Test Procedure (ATP)non- self-sealing fuel Cells with the exceptions.A Vacuum Bag Method Phenolphthalein Test shall be conducted on the fuel cell once all ATP testing has successfully been completed Folding: In lieu of folding the fuel cell at a temperature not less than 70� folding shall take place at 60-65� Folding: In addition to the test described in the ATP, after fuel cell is confirmed to be folded to the proper size,it shall remain folded for 30min then inspected per MIL-STD-801D.This test must be performed once prior to the final leakage test. Sealant Activation test: In lieu of stand testing the cell for a minimum of seven(7)days when using WK1473 type III fluid or ten(10) days using JP-4/JP-8 fuel, the cell shall be stand tested for minimum of thirty (30) days using JP-4/JP-8 fuel. II. Samples. The contractor shall present one (1) unit(s). At least 45 days before First Article Testing, the contractor shall notify the PCO, in writing, so that the Navy may witness the testing. III. Testing Location and Estimated Lead-Time. No arrangements will be made for inspection of the sample(s) until the DCMA notifies the PCO that the contractor has inspected the sample and is 100% ready for inspectionby the Government team.The DCMA-QAR shall be present during the inspection team's visit to the manufacturing site to perform the...","url":"https://matchawards.com/dept_of_the_navy/posts/112358652848367534","identifier":"N0038324RP227","category":"336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing","additionalProperty":[{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"1560 - AIRFRAME STRUCTURAL COMPONENTS"}],"availabilityStarts":"2024-04-29","availabilityEnds":"2024-05-28","sameAs":"https://sam.gov/opp/637583c38cb84c21a1ec3ab20e33ad3c/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Manufacturing","item":"https://matchawards.com/contracts/manufacturing"}]}
```

