20--TILE
- Status
- Closed, the response deadline passed on Apr 8, 2024
- Agency
- United States Department of the Navy
- Office
- MECHANICSBURG, USA
- Notice type
- Solicitation
- Solicitation number
- N0010424QNB88
- NAICS
- 336611 - Ship Building and Repairing
- PSC
- 2090 - MISCELLANEOUS SHIP AND MARINE EQUIPMENT
- Posted
- 2024-03-08
- Deadline
- 2024-04-08
Description
CONTACT INFORMATION|4|N741.2|GDS|717-605-7751|STEVE.SMITHEY@NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)|N/A|TBD|TBD|TBD|TBD|TBD|TBD|N/A|N/A|TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WEAPON SYSTEM SUPPORT| EQUAL OPPORTUNITY (SEP 2016)|2||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC (FEB2024))|11|||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FEB 2024)|13|336611|1,300|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1. This solicitation is for the following PROCUREMENT: A. CLIN 0001; TILE; NSN: 1HS 2090 012244912 ST; Quantity 800 in accordance with Reference number 5808278 TILE AD-79M SHAPE B.This part requires engineering source approval by the design control activity in order to maintain the quality of the part. Existing unique design capability, engineering skills, and manufacturing knowledge by the qualified source(s) require acquisition of the part from the approved source(s). The approved source(s) retain data rights, manufacturing knowledge, or technical data that are not economically available to the Government, and the data or knowledge is essential to maintaining the quality of the part. An alternate source must qualify in accordance with the design control activity's procedures, as approved by the cognizant Government engineering activity. The qualification procedures must be approved by the Government engineering activity having jurisdiction over the part in the intended application. 2. Government-Source Inspection and Acceptance (G-S I&A) is required. If the G-S I&A will occur at a different CAGE from the Admin Award CAGE, please provide the procurement facility CAGE and/or packaging CAGE with the quote. 3. MIL-STD Packaging is required and it will not be waived. 4. Please provide the following information in the procurement quote: A. Your CAGE (used as the awardee CAGE):___________________ B. the unit procurement price: $____________________________________ (Firm Fixed Price). C. The procurement CAGE _____________ and packaging CAGE___________ (as described in #2). D. Procurement Acquisition Time, delivered in _____ days. PLEASE NOTE THE FOLLOWING WHEN GENERATING YOUR QUOTE: We are requesting that the quote's validity extend for 6 months from the submitted proposal date. 5. Since there is only one business concern capable of procurement on this NSN, the Small Business Set-Aside requirement has been dissolved. 6. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 7. Please submit a procurement quote to Steve Smithey via email: STEVE.SMITHEY@NAVY.MIL. This is the only submission method authorized. All other delivery methods (i.e., fax, NECO, etc.) will not be accepted. 8. Please read this solicitation in its entirety. Please direct questions regarding this solicitation to the point of contact (POC): Steve.Smithey@Navy.mil. 9. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 10. This is a rated order certified for national defense use, and the Contract will follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700). 11. This order will be issued pursuant to Emergency Acquisition Authority. 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the TILE , part of the ;Special Hull Treatment program. This specification covers one class of rubber tiles, identified as Type AD-79M SHAPE "B"; . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.1.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.1.3 The "Document Changes" section provides supersessions/changes to referenced documents. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. 2.3 ;Certian documents pertaining to this item are classified. The seller must be cleared to receive these classified documents. A DD Form 254 is required. Vendors require access to Confidential National Security Information. Drawings (53711) 5808344 and 5808346 are classified. Classification is Confidential.; 2.4 Identification of Classified Documents - This contract/purchase order requires the Contractor to have authorized access to classified documents in accordance with the attached Contract Security Classification Specification (DD Form 254). The classified documents and security level are: ;Drawing 5808344 & 5808346 are classified. (confidential); DRAWING DATA=5808278 |53711| I| |D|0001 | I|49998|0055339 DRAWING DATA=5808278 |53711| I| |D|0002 | I|49998|0020045 DRAWING DATA=5808278 |53711| I| |D|0003 | I|49998|0026681 DRAWING DATA=5808278 |53711| I| |D|0004 | I|49998|0035057 DRAWING DATA=5808278 |53711| I| |D|0005 | I|49998|0039263 DRAWING DATA=5808278 |53711| I| |D|0006 | I|49998|0022155 DRAWING DATA=5808278 |53711| I| |D|0007 | I|49998|0017245 DRAWING DATA=5808278 |53711| I| |D|0008 | I|49998|0037926 DRAWING DATA=5808278 |53711| I| |D|0009 | I|49998|0036457 DRAWING DATA=5808278 |53711| I| |D|0010 | I|49998|0027305 DRAWING DATA=5808278 |53711| I| |D|0011 | I|49998|0028560 DRAWING DATA=5808278 |53711| I| |D|0012 | I|49998|0027185 DRAWING DATA=5808278 |53711| I| |D|0013 | I|49998|0024123 DRAWING DATA=5808278 |53711| I| |D|0014 | I|49998|0036564 DRAWING DATA=5808278 |53711| I| |D|0015 | I|49998|0045738 DRAWING DATA=5808278 |53711| I| |D|0016 | I|49998|0042279 DRAWING DATA=5808278 |53711| I| |D|0017 | I|49998|0039438 DRAWING DATA=5808278 |53711| I| |D|0018 | I|49998|0032175 DRAWING DATA=5808278 |53711| I| |D|0019 | I|49998|0034470 DRAWING DATA=5808278 |53711| I| |D|0020 | I|49998|0031465 DRAWING DATA=5808278 |53711| I| |D|0021 | I|49998|0038438 DRAWING DATA=5808278 |53711| I| |D|0022 | I|49998|0039550 DRAWING DATA=5808278 |53711| I| |D|0023 | I|49998|0032985 DRAWING DATA=5808278 |53711| I| |D|0024 | I|49998|0037627 DRAWING DATA=5808278 |53711| I| |D|0025 | I|49998|0020182 DRAWING DATA=5808278 |53711| I| |D|0026 | I|49998|0031199 DRAWING DATA=5808278 |53711| I| |D|0027 | I|49998|0027656 DRAWING DATA=5808278 |53711| I| |D|0028 | I|49998|0032085 DRAWING DATA=5808278 |53711| I| |D|0029 | I|49998|0034677 DRAWING DATA=5808344 |53711| B| |D|0001 | B|00026|0000000 DRAWING DATA=5808346 |53711| E| |D|0001 | E|00026|0000000 DOCUMENT REF DATA=MIL-STD-105 | | |E |950227|A| | | DOCUMENT REF DATA=MIL-STD-129 | | |P |041029|A| |03| DOCUMENT REF DATA=MIL-STD-147 | | |D |960325|A| | | DOCUMENT REF DATA=MIL-STD-177 | | |A |880531|A| | | DOCUMENT REF DATA=FED-STD-313 | | |D |000321|A| |01| DOCUMENT REF DATA=MIL-STD-407 | | | |910321|A| | | DOCUMENT REF DATA=MIL-STD-973 | | | |920417|A| | | DOCUMENT REF DATA=MIL-STD-2073 |0001| |D |020510|A| |01| DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=S6360-AD-HBK-10 | | | |940930|E| | | DOCUMENT REF DATA=ASTM-D1974 | | |92 |940301|A| | | DOCUMENT REF DATA=ASTM-D2240 | | | |920622|A| | | DOCUMENT REF DATA=ASTM-D297 | | | |930915|A| | | DOCUMENT REF DATA=ASTM-D3767 | | | |920417|A| | | DOCUMENT REF DATA=ASTM-D3951 | | | |901221|A| | | DOCUMENT REF DATA=ASTM-D412 | | | |921115|A| | | DOCUMENT REF DATA=ASTM-D4615 | | | |941003|A| | | DOCUMENT REF DATA=ASTM-D471 | | | |980911|A| | | DOCUMENT REF DATA=ASTM-D5118/D5118M | | |90 |940301|A| | | DOCUMENT REF DATA=ASTM-D573 | | | |880527|A| | | DOCUMENT REF DATA=ASTM-D635 | | | |910715|A| | | DOCUMENT REF DATA=ISO9001 | | | |910606|A| | | DOCUMENT REF DATA=ISO9002 | | |94 |940701|A| | | DOCUMENT REF DATA=MIL-STD-973 | | | |950113|A| |03| DOCUMENT CHANGE DATA=DI-E-2121 |DI-MISC-80678 DOCUMENT CHANGE DATA=DI-T-2072 |DI-NDTI-80809 DOCUMENT CHANGE DATA=DI-T-4902 |DI-MISC-80678 DOCUMENT CHANGE DATA=MIL-P-116 |MIL-STD-2073-1 DOCUMENT CHANGE DATA=PP-B-636 |ASTM-D5118 & ASTM-D1974 3. REQUIREMENTS 3.1 ;This part requires engineering source approval by the design control activity in order to maintain the quality of the part. Existing unique design capability, engineering skills, and manufacturing knowledge by the qualified source(s) require acquisition of the part from the approved source(s).The approved source(s) retain data rights, manufacturing knowledge, or technical data that are not economically available to the Government, and the data or knowledge is essential to maintaining the quality of the part. An alternate source must qualify in accordance with the design control activity's procedures, as approved by the cognizant Government engineering activity. The qualification procedures must be approved by the Government engineering activity having jurisdiction over the part in the intended application. Contractors are cautioned that award of this contract/purchase order will not be delayed solely for the purpose of approving additional sources. Contractors desiring to qualify under the Engineering Source Approval Qualification (ESAQ) program are urged to contact the Government design control activity to arrange for test and, if approved, added to the (ESAQ) list of approved sources for subsequent procurements.; 3.2 Manufacturing and Design - The TILE furnished under this contract/purchase order shall meet the material and physical requirements as specified ;on 53711 drawing 5808278, CONFIDENTIAL 53711 DRAWING 5808344 and CONFIDENTIAL 53711 drawing 5808346 except as amplified or modified herein.; . 3.3 Configuration Control - MIL-STD-973 entitled "Configuration Management", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973, Paragraph 5.4.8.2 and Appendix D. Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E. Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E. (Original and two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.) 3.3.1 Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until another drawing revision is approved. The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted, the date of the granting of the authorization, and the name of the granting authority. Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below. The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA 17055-0788. Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor. 3.4 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned. These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere. 3.5 Security Clearance Required - This contract/purchase order requires the Contractor to have a Government Security Clearance in accordance with the attached Contract Security Classification Specification (DD Form 254). 3.6 ;Security - The contractor is responsible to provide security safeguards for all CONFIDENTIAL data, molds, tiles and the controlled area as specified in paragraph 6.9 of 53711 drawing 5808278.; 3.7 ;MOLDS - The contractor is responsible for designing molds to produce the tiles as specified in paragraph 6.3 of 53711 drawing 5808278. The contractor shall certify that all molds are equivalant in critical dimensions and allowable tolerances.The government reserves the right to examine mold drawings or molds and to accept or reject plan tolerances. The molds are UNCLASSIFIED but shall be afforded maximum protection to ensure minimum visibility and prevent access by unauthorized personnel in accordance with paragraph 6.3 and 6.9.1 of 53711 drawing 5808278.; 3.8 ;Material Safety Data Sheets (MSDS) - Material Safety Data Sheets shall be in accordance with paragraph 3.3.2 of 53711 drawing 5808278.; 3.9 ;Responsibility for Inspection - The contractor is responsible for the performance and certification of all inspection requirements as specified in paragraph 4.1 of 53711 drawaing 5808278, unless specified elsewhere in this specification.; 3.10 ;Adhesion of Tiles to Steel - "SHT" Epoxy Paint Hull Preservation DTNSRDC - 2844-1109 (NNVSEA Drawing 53711, 5808333) and Epoxy Adhesive DTNSRDC 2844-1102 (NAVSEA Drawing 53711, 5808332) will be the only paint and adhesive to be used for "SHT" material "Adhesion of Tiles to Steel" testing.; 3.11 Marking - This item shall be physically identified in accordance with ;the requirements of MIL-STD-129, paragraph 3.2.1 and 5.2.3 of drawing 5808277; . 3.12 ;Special Marking - Special Marking shall be in accordance with paragraph 5.2.3 and 5.2.3.1 of 53711 Drawing 5808278 In addition, all outside containers are to be marked with black letters a minimum of one (1) inch high in non-fading, water resistant ink, with the designation "SHT".; 3.13 ;Production Lot Test/Quality Conformance Inspection Approval (Government Testing) - Production Lot Test (PLT)/Quality Conformance Inspection (QCI) and approval is required.; 3.13.1 ;Material submitted for Production Lot Test/Quality Conformance Inspection shall be certified to have the same composition, construction and manufacturing process as the material supplied for the First Article Test/Engineering Source Approval Qualification (ESAQ) Testing.; 3.13.2 ;Production Lot Test/Quality Conformance Inspection - The Test/Inspections to be performed for Production Lot/Quility Conformance Inspection shall be as specified in Table III of 53711 Drawing 5808278.; NOTE: LOT - A lot shall consist of all tiles produced in one plant under essentially the same conditions and offered for inspection at one time. In each case, the number of tiles offered for inspection constitute the lot size. 3.13.3 ;Sampling and Rating for Production Lot Test/Quality Conformance Inspection - Sampling for Production Lot Test/Quality Conformance Inspection (Non Destructive and Destructive) shall be in accordance with the requirements of paragraph 4.3.3.3 and Table IV of 53711 Drawing 5808278.; 3.14 ;Manufacturing Accountability and Control - The contractor shall develop auditable records to account for all tiles molded in accordance with paragraph 6.9.4 of 53711 Drawing 5808278.; 3.15 ;Disposition of Non - Conforming, Excess, or Scrap Material - Disposal of non - conforming or scrap material shall be in accordance with the requirements of paragraph 6.5 of 53711 Drawing 5808278.; 3.16 ;Cleaning Procedure - See section 6 (NOTES) of this specification for Cleaning Procedure.; 3.17 First Article Approval (Government Testing) - First Article Test (FAT) and approval is required. 3.18 Production Lot Approval (Government Testing) - Production Lot Test and approval is required. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified hMore from United States Department of the Navy posted in March 2024