ClickCease Replace Closed Circuit Evaporative Cooler, Building 350, Dam… | Closed - MatchAwards

Replace Closed Circuit Evaporative Cooler, Building 350, Dam Neck Annex

Status
Closed, the response deadline passed on Mar 7, 2024
Agency
United States Department of the Navy
Office
NORFOLK, USA
Notice type
Solicitation
Solicitation number
N4008524R2587
NAICS
236220 - Commercial and Institutional Building Construction
PSC
Z2JZ - REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
Category
Facility Related Services (4.4)
Set-aside
8(a) Sole Source (FAR 19.8)
Posted
2024-02-20
Deadline
2024-03-07
Place of performance
Virginia Beach, 23460

Description

The work consists of: Demolish the existing closed circuit evaporative cooler and sump (basin) evaporative water treatment systems in their entirety and provide closed circuit evaporative cooler and sump (basin) evaporative water treatment systems in the same general area to provide a complete and operational water source heat pump system for Building 350. The existing water source heat pump equipment and piping systems in Building 350 are existing to remain. Existing Delta direct digital controls (DDC) shall remain and provide modifications for the closed circuit evaporative cooler and unit control panel. Provide electrical work in accordance with manufacturer requirements and latest edition of National Electric Code (NEC) to support the mechanical scope of work. Provide a temporary closed circuit evaporative cooler to provide uninterrupted condenser water service in the water source heat pump system for the duration of this contract.

Source notice

More from United States Department of the Navy posted in February 2024

More lists