<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_navy/posts/111967980491458157" -->

---
title: 43--PUMP UNIT,CENTRIFUG, IN REPAIR/MODIFICATION… (N0010422RZB67) | Closed - MatchAwards
description: 43--PUMP UNIT,CENTRIFUG, IN REPAIR/MODIFICATION OF. United States Department of the Navy. Solicitation N0010422RZB67. NAICS 332919 - Other Metal Valve and Pipe Fitting Manufacturing. Deadline 2022-10-31. CONTACT INFORMATION|4|N742.3|WR5DD|(717)605-3261|amber.l.miller.civ@us.navy.mil| ITEM UNIQUE...
canonical: https://matchawards.com/dept_of_the_navy/posts/111967980491458157
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: 43--PUMP UNIT,CENTRIFUG, IN REPAIR/MODIFICATION… (N0010422RZB67) | Closed
og:url: https://matchawards.com/dept_of_the_navy/posts/111967980491458157
og:description: 43--PUMP UNIT,CENTRIFUG, IN REPAIR/MODIFICATION OF. United States Department of the Navy. Solicitation N0010422RZB67. NAICS 332919 - Other Metal Valve and Pipe Fitting Manufacturing. Deadline 2022-10-31. CONTACT INFORMATION|4|N742.3|WR5DD|(717)605-3261|amber.l.miller.civ@us.navy.mil| ITEM UNIQUE...
og:image: https://matchawards.com/system/accounts/avatars/000/000/085/original/a0262fe00d6c038b.png?1638992122
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# 43--PUMP UNIT,CENTRIFUG, IN REPAIR/MODIFICATION OF

Status

Closed, the response deadline passed on Oct 31, 2022

Agency

[United States Department of the Navy](/dept%5Fof%5Fthe%5Fnavy)

Office

MECHANICSBURG, USA

Notice type

Solicitation

Solicitation number

N0010422RZB67

NAICS

[332919 - Other Metal Valve and Pipe Fitting Manufacturing](/groups/455)

PSC

4320 - POWER AND HAND PUMPS

Category

[Machinery & Components (5.1)](/categories/industrial-products-and-services/machinery-and-components)

Posted

2024-02-20

Deadline

2022-10-31

## Description

CONTACT INFORMATION|4|N742.3|WR5DD|(717)605-3261|amber.l.miller.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| TIME OF DELIVERY (JUNE 1997)|20|CLIN 0001|THREE (3)|565|||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Certifications - Stand-Alone Receiving Report Material - Receiving Report & Invoice Combo|Material - Inspect & Accept at Source|HQ0337|N00104|S4306A|Certifications - N45404 Material - S4306A|Certifications - N4 5404 Material - SW3117|0UBG9|N/A|N/A|N/A|Certifications - N45404|N/A|N/A|See DD Form 1423|1-866-618-5988 - WAWF Helpdesk| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (NOV 2021)|4||||| SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (SEP 1999))|9|||||||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| PROGRESS PAYMENTS (NOV 2021)(DEVIATION 2020-O0010)|4||||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS ($100K)(FEB 1997)|1|| WARRANTY OF SUPPLIES OF A COMPLEX NATURE (MAY 2001)|10|One year from date of delivery.|One year from date of delivery.||||||||| LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)|1|| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA-MODIFICATIONS (NOV 2021))|7|||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13||X|||||||||||| SMALL BUSINESS PROGRAM REPRESENTATIONS (SEP 2021)|4||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|333996|1250|||||||||||| COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEVIATION 2018-O0015)(MAY 2018))|1|| TYPE OF CONTRACT (APR 1984)|1|Firm-Fixed Price (FFP)| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIEDCOST OR PRICING DATA--BASIC (JUN 2019))|1|| 1\. This solicitation is for the repair of NIIN 003837939 (PUMP UNIT,CENTRIFUG), quantity 3\. 2\. Proposal is to be submitted as an Estimated, Not-To-Exceed (NTE) price for the full repair of the requirement. Vendor will have 90 days to complete a teardown and evaluation of the carcasses and submit a Firm-Fixed Price proposal. 3\. When submitting a proposal, make sure to specify any exceptions, i.e. MIL-STD packaging, MIL-STD labeling, Inspection & Acceptance locations, Packaging House, Surplus Material, etc. If no exceptions are indicated or received, award will be based upon solicitation requirements. Changes or requests for changes after award shall have consideration costs deducted from unit price. 4\. Include in NTE repair price all costs associated with receipt of material that may be in unwhole condition, missing hardware, damaged, handling damage, missing parts, wear damage, and CAV Reporting. Also, please provide the following: a. Teardown and Evaluation Rate: b. RTAT: c. Throughput Constraint: d. Induction Expiration: Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Requested RTAT: 565 Days Proposals shall reference proposed RTAT and any capacity constraints. Price Reductions: Any asset for which the contractor does not meet the required RTAT will incur a price reduction of XXXX per unit. This adjustment will be implemented via a Reduction Modification at the end of contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's rights to terminate for default. 5\. If supplies will be packaged at a location different from the Offeror's address, the Offeror shall provide the Name, Street Address, and CAGE of the Packaging Facility. 6\. If you are not the manufacturer of the material called out in the requirement, the actual manufacturer must be stated in (Name and CAGE) and be able to provide traceability documentation if requested. Examples of traceability documentation include but are not limited to the following: - Purchase order/invoice between offeror and the manufacturer identifying the part number, revision level and quantities. - Manufacturer's packing slip or certification identifying the part number, revision level and quantities. 7\. Any contract awarded as a result of this solicitation will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for Naitonal Defense, Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contract to be awarded will be a rated order. 8\. Offerors must have a valid U.S. Security Clearance of CONFIDENTIAL or higher in order to respond to this RFP N00104-22-R-ZB67, because N00104-22-R-ZB67 includes an annex (information) classified at the CONFIDENTIAL level which will be released only to the offerors possessing the appropriate clearance. All classified material must be handled in accordance with the National Industrial Security Program Operating Manual (NISPOM)(DoD 5220-22-M) and Industrial Security Regulation (DoD 5220.22-R). 9\. This requirement will be contracted under Basic Ordering Agreement (BOA) N00104-17-G-AS01\. 1\. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2\. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Identification of Classified Documents - This contract/purchase order requires the Contractor to have authorized access to classified documents in accordance with the attached Contract Security Classification Specification (DD Form 254). The classified documents and security level are: ;Drawing 10640-A-18 - CONFIDENTIAL Tech Manual 0947-LP-200-5010 - CONFIDENTIAL; 2.3 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.3.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.3.2 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;10591-H-18 88032 F D PL-10591-H-18 88032 C E 10580-F-18 88032 I B 10560-C-18 88032 B B 10563-B-18 88032 B B 10564-B-18 88032 B B 10565-B-18 88032 C B 10568-B-18 88032 A B 10569-B-18 88032 B B 10576-C-18 88032 B B 10582-C-18 88032 D B 10579-F-18 88032 G B 10632-C-18 88032 D B 10566-B-18 88032 A B 10567-B-18 88032 A B; 2.3.3 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.3.4 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=10640-A-18 |88032| B|CD |D|0001 | B|00026|0000000 DRAWING DATA=3505-20 |95402| | |D|0001 | |49998|0782765 DRAWING DATA=3505-9 |95402| B| |D|0001 | B|49998|2401675 DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-A193 | | | |200515|A| | | DOCUMENT REF DATA=ASTM-A194 | | | |200501|A| | | DOCUMENT REF DATA=ASTM-A285 | | | |030910|A| | | DOCUMENT REF DATA=QQ-N-286 | | |G |001207|A| | | DOCUMENT REF DATA=ASTM-A479 | | | |200701|A| | | DOCUMENT REF DATA=ASTM-A487 | | | |200501|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=MIL-STD-2132 | | |D |080310|F| |01| DOCUMENT REF DATA=ISO\_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-S-24093 | | |A |911105|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=SAE AMS-QQ-S-763 | | |D |150301|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3\. REQUIREMENTS 3.1 REFURBISHED MATERIAL STATEMENT OF WORK (REPAIR SOW) - 3.1.1 INSPECTION - Clean and determine if refurbishment is possible. At disassembly, the Contractor must record all identifying markings found on the parts of each assembly. The Contractor must maintain traceability of these markingsto each unit throughout refurbishment. 3.1.2 RE-USEABLE PARTS - Any parts of the original assembly that are useable (replacement is not necessary), may be utilized as initially supplied. 3.1.3 NON-USEABLE PARTS - Any parts of the original assembly that are not usable (replacement is necessary) must be in accordance with this TDP (Technical Data Package). 3.1.4 REFURBISHMENT - Upon completion of inspection, this item must be refurbished to be in accordance with ;Ingersoll Rand Co. drawings 10591-H-18 and PL-10591-H-18, Maintenance Standard 2550-081-066 Revision B Change 3, SHIPALT SSN3982 Revision 0, Tech Manual 0947-LP-200-5010 Revision 01 dated 3/12/09, Ingersoll Rand Co drawing 10640-A-18, General Dynamics motor drawing 3505-9 with Maintenance Standard 2550-081-062 Revision D Change 3 or General Dynamics motor drawing 3505-20 with Maintenance Standard 2550-081-063 Revision C Change 1, and Refurbishment Instruction 5520-012-0700 (CSD223); , except as amplified or modified herein. This applies to all "Parts Requiring Certification" as identified elsewhere in this Contract/Purchase Order. 3.1.5 Additional SOW Requirements - ;N/A; 3.1.6 ;SMIC Q3 parts for the Pump/Motor assembly which meet RI 5520-012-0700 (CSD223) requirements can be reused.; 3.2 ;No-Forn documents Maintenance Standard 2550-081-066, Maintenance Standard 2550-081-062, Maintenance Standard 2550-081-063, SHIPALT SSN3982 and confidential document Tech Manual 0947-LP-200-5010 will be provided by mail if the bidder does not possess them.; 3.3 ;Replace packing gland assembly with a split mechanical seal assembly in accordance with SHIPALT SSN3982.; 3.4 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD223; in ECDS at https://register.nslc.navy.mil/ 3.5 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;End Cover, Item No. 158 and Shell, Item No. 476; Material - ;MIL-S-24093 Class H; Part - ;Studs, Item No's. 178A, 178B, and 178C; Material - ;ASTM-A193 Grade B7; Part - ;Nuts, Item No's. 179A, 179B, and 179C; Material - ;ASTM-A194 Grade 2H; Part - ;Blind Flange, Item No. 186; Material - ;ASTM-A285 Grade C; Part - ;Nut, Slotted, Item No. 179G; Material - ;QQ-N-286 FORM 2, Hot Finished, Annealed and Age Hardened or Cold Drawn, Annealed and Age Hardened; Part - ;Rod, Tie, Item No. 374; Material - ;QQ-N-286 Form 2, annealed and age hardened; Part - ;Nozzle Head, Item No. 360 on drawing 10580-F-18; Material - ;ASTM-A487 Grade CA-6NM; Part - ;Nipple, Flanged on drawing 10632-C-18; Material - ;SAE-AMS-QQ-S-763 Forging, Class 410, Condition T, Hot Finished; Part - ;Plug, Item 417A; Material - ;ASTM-A479 Type 316 Annealed; Part - ;Shaft, item 42 of drawing 3505-9; Material - ;MIL-S-24093 Class D Type II or AISI 4140 or 4340 Quenched and Tempered and meeting the mechanical properties of note 22 of drawing 3505-9; 3.6 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below. Test - ;Magnetic Particle Inspection; Item - ;Nozzle Head, Item No. 360 on drawing 10580-F-18; Performance - T9074-AS-GIB-010/271 Acceptance - S9074-AR-GIB-010A/278 Test - 5x Visual Magnification or Dye Penetrant Inspection (root layer) Item - Weldments Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - Visual and Dye Penetrant Inspection (final layer) Item - Weldments Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - ;Liquid Penetrant Inspection; Item - ;Nut Slotted, Item No. 179G; Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222 Acceptance - MIL-DTL-1222 Test - ;Liquid Penetrant Inspection or Magnetic Particle Inspection (Wet Method) (Either inspection is acceptable); Item - ;Studs, Item No's 178A, 178B, and 178C and Nuts, Item No's 179A, 179B, and 179C; Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222 Acceptance - MIL-DTL-1222 Test - Ultrasonic Inspection on Starting Material Item - ;All Items requiring certification made from QQ-N-286 with a diameter or minimum distance between parallel surfaces of 4 inches or greater of the starting material, or when required by a drawing or specification invoked elsewhere in this contract; Performance - T9074-AS-GIB-010/271 or MIL-STD-2132, and QQ-N-286 Acceptance - QQ-N-286 Test - ;Insulation Resistance; Item - ;Motor; Performance - ;Refurbishment Instruction 5520-012-0700; Acceptance - ;Refurbishment Instruction 5520-012-0700; Test - ;Structureborne noise test; Item - ;Each Pump/Motor assembly; Performance - ;Refurbishment Instruction 5520-012-0700; Acceptance - ;Refurbishment Instruction 5520-012-0700; Test - ;Operational Test; Item - ;Each Pump/Motor assembly; Performance - ;Refurbishment Instruction 5520-012-0700; Acceptance - ;Refurbishment Instruction 5520-012-0700; Test - ;Hydrostatic test; Item - ;Pump; Performance - ;Paragraph 1.al. of MS 2550-081-066; Acceptance - ;Paragraph 1.al. of MS 2550-081-066; Attribute - ;Maintenance Standard 2550-081-066 inspections requiring a recorded measurement or checked as SAT or UNSAT; Item - ;Each Pump assembly; Performance - ;Maintenance Standard 2550-081-066; Attribute - ;Maintenance Standard inspections requiring a recorded measurement or checked as SAT or UNSAT; Item - ;Each Motor assembly; Performance - ;Maintenance Standard 2550-081-062 for General Dynamics motor drawing 3505-9 or Maintenance Standard 2550-081-063 for General Dynamics motor drawing 3505-20; Test - ;Hydraulic pump curve test; Item - ;Each Pump/Motor assembly; Performance - ;Refurbishment Instruction 5520-012-0700; Acceptance - ;Refurbishment Instruction 5520-012-0700; Test - ;Pump and motor design capacity test; Item - ;Each Pump/Motor assembly; Performance - ;Refurbishment Instruction 5520-012-0700; Acceptance - ;Refurbishment Instruction 5520-012-0700; Test - ;Pump mechanical seal leakage test; Item - ;Each Pump; Performance - ;Refurbishment Instruction 5520-012-0700; Acceptance - ;Refurbishment Instruction 5520-012-0700; Attribute - Annealing and Age Hardening Item - ;Nut, Slotted, Item No. 179G and Rod, Tie, Item No. 374; Performance - QQ-N-286 3.7 Radiography is required on ;Nozzle Head, Item No. 360 on drawing 10580-F-18; . 3.8 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.9 K-MONEL Fasteners - Material must be heat treated per QQ-N-286\. 3.9.1 Fasteners that have been hot or cold headed or roll threaded must be solution annealed followed by age hardening subsequent to all heading and thread rolling operations. The mechanical properties on certifications must be actual properties of the annealed and age hardened material and must meet the requirements of QQ-N-286\. 3.9.2 QQ-N-286 fasteners that have been headed and/or roll threaded must not beage hardened unless the material has been solution annealed subsequent to the heading and threading operations. Threads formed after the final age 

<!-- mobian-agent-ad sponsored="true" id="374a3208-26fe-4405-a134-ad65eeda56e1" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/industrial-products-and-services/machinery-and-components?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


[Source notice](https://sam.gov/opp/09059e8a86af4beea1207f7cf1191c59/view)

[More from United States Department of the Navy posted in February 2024](/dept%5Fof%5Fthe%5Fnavy/archive/2024-02)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"43--PUMP UNIT,CENTRIFUG, IN REPAIR/MODIFICATION OF","description":"CONTACT INFORMATION|4|N742.3|WR5DD|(717)605-3261|amber.l.miller.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| TIME OF DELIVERY (JUNE 1997)|20|CLIN 0001|THREE (3)|565|||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Certifications - Stand-Alone Receiving Report Material - Receiving Report \u0026 Invoice Combo|Material - Inspect \u0026 Accept at Source|HQ0337|N00104|S4306A|Certifications - N45404 Material - S4306A|Certifications - N4 5404 Material - SW3117|0UBG9|N/A|N/A|N/A|Certifications - N45404|N/A|N/A|See DD Form 1423|1-866-618-5988 - WAWF Helpdesk| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (NOV 2021)|4||||| SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (SEP 1999))|9|||||||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| PROGRESS PAYMENTS (NOV 2021)(DEVIATION 2020-O0010)|4||||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS ($100K)(FEB 1997)|1|| WARRANTY OF SUPPLIES OF A COMPLEX NATURE (MAY 2001)|10|One year from date of delivery.|One year from date of delivery.||||||||| LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)|1|| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA-MODIFICATIONS (NOV 2021))|7|||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13||X|||||||||||| SMALL BUSINESS PROGRAM REPRESENTATIONS (SEP 2021)|4||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|333996|1250|||||||||||| COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEVIATION 2018-O0015)(MAY 2018))|1|| TYPE OF CONTRACT (APR 1984)|1|Firm-Fixed Price (FFP)| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIEDCOST OR PRICING DATA--BASIC (JUN 2019))|1|| 1. This solicitation is for the repair of NIIN 003837939 (PUMP UNIT,CENTRIFUG), quantity 3. 2. Proposal is to be submitted as an Estimated, Not-To-Exceed (NTE) price for the full repair of the requirement. Vendor will have 90 days to complete a teardown and evaluation of the carcasses and submit a Firm-Fixed Price proposal. 3. When submitting a proposal, make sure to specify any exceptions, i.e. MIL-STD packaging, MIL-STD labeling, Inspection \u0026 Acceptance locations, Packaging House, Surplus Material, etc. If no exceptions are indicated or received, award will be based upon solicitation requirements. Changes or requests for changes after award shall have consideration costs deducted from unit price. 4. Include in NTE repair price all costs associated with receipt of material that may be in unwhole condition, missing hardware, damaged, handling damage, missing parts, wear damage, and CAV Reporting. Also, please provide the following: a. Teardown and Evaluation Rate: b. RTAT: c. Throughput Constraint: d. Induction Expiration: Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Requested RTAT: 565 Days Proposals shall reference proposed RTAT and any capacity constraints. Price Reductions: Any asset for which the contractor does not meet the required RTAT will incur a price reduction of XXXX per unit. This adjustment will be implemented via a Reduction Modification at the end of contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's rights to terminate for default. 5. If supplies will be packaged at a location different from the Offeror's address,...","url":"https://matchawards.com/dept_of_the_navy/posts/111967980491458157","identifier":"N0010422RZB67","category":"332919 - Other Metal Valve and Pipe Fitting Manufacturing","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"4320 - POWER AND HAND PUMPS"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"5.1 Machinery \u0026 Components","url":"https://matchawards.com/categories/industrial-products-and-services/machinery-and-components"}],"availabilityStarts":"2024-02-20","availabilityEnds":"2022-10-31","validThrough":"2022-10-31T23:59:59-04:00","sameAs":"https://sam.gov/opp/09059e8a86af4beea1207f7cf1191c59/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Manufacturing","item":"https://matchawards.com/contracts/manufacturing"}]}
```

