48--VALVE ASSEMBLY,MANI
- Status
- Closed, the response deadline passed on Feb 9, 2024
- Agency
- United States Department of the Navy
- Office
- MECHANICSBURG, USA
- Notice type
- Solicitation
- Solicitation number
- N0010423RFF31
- NAICS
- 332919 - Other Metal Valve and Pipe Fitting Manufacturing
- PSC
- 4820 - VALVES, NONPOWERED
- Category
- Machinery & Components (5.1)
- Posted
- 2024-01-04
- Deadline
- 2024-02-09
Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specification sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| TIME OF DELIVERY (JUNE 1997)|20|0001|15|tbd|||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report- Certifications Combo- Receiving Report & Invoice- Material |N/A|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material |N50286|TBD|133.2|N/A|N/A|N39040 - Certifications |N/A|N/ A|SEE DD FORM 1423 |PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL | NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery|one year from date of delivery||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (OCT 2022)|4||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (JAN 2023)|2||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC (JAN2023))|3|||| LIST OF AWARD ATTACHMENTS|5|||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (DEC 2022))|3|||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)|13|332919|750|||||||||||| TYPE OF CONTRACT (APR 1984)|1|Firm Fixed Price| ALTERATIONS IN SOLICITATION (APR 1984)|3|||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| This RFP closing date is hereby extended out until 09 Feb 2024. All other terms and conditions remain the same. DD1423 Data Item A001 may be waived if already on file atNAVSUP WSS Mechanicsburg. Any contract awarded as a result of this solicitation will be DO rated order certified for national defense use under the Defense Priorities and AllocationsSystem (DPAS). 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.3 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;S1E10205 99517 H B S3C10054 99517 E B S3C10053 99517 E B V3D10431 99517 J B V3D10436 99517 E B V3D10435 99517 E B V3D10434 99517 C B V3D10437 99517 G B F3C10321 99517 D B PTP-S1E10205-01 99517 C B WI-S1E10205 99517 ^ B; DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-B138 | | | |110101|A| | | DOCUMENT REF DATA=ASTM-B150 | | | |190401|A| | | DOCUMENT REF DATA=ASTM-A182 | | | |211101|A| | | DOCUMENT REF DATA=ASTM-A182 | | |A |191101|A| | | DOCUMENT REF DATA=ASTM-A240 | | |A |201115|A| | | DOCUMENT REF DATA=ASTM-A262 | | | |150901|A| | | DOCUMENT REF DATA=ASTM-A574 | | | |211201|A| | | DOCUMENT REF DATA=ASTM-A581 | | | |950910|A| | | DOCUMENT REF DATA=ASTM-F606 | | | |191115|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=SAE AMS 5643 | | |V |180101|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=MIL-DTL-15024 | | |G |180303|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-18240 | | |F |000313|A|1 | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=SAE AMS-QQ-S-763 | | |D |150301|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | | 1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 ;Pressure reducing manifold assembly to be in accordance with Vacco drawing S1E10205, part number S1E10205-01, with Vacco document WI-S1E10205, except as amplified or modified herein.; 3.2 ;NOTE: Vacco document WI-S1E10205 must be Revision D (R/C).; 3.3 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: ;Vacco drawing S1E10205, part number S1E10205-01 (Manifold Assembly); Part - ;BODY, Item 1; Material - ;SAE-AMS-QQ-S-763, class 304, condition A or ASTM-A182, class 304, condition A or ASTM-A240, class 304, condition A; Part - ;FILTER CAP, Item 2; Material - ;ASTM-A582, Type 303; Part - ;PORT ADAPTER, Item 3; INLET PORT, Item 12; and OUTLET PORT, Item 13; Material - ;SAE-AMS-5643, condition H-1025; Part - ;PLUG, Item 6; Material - ;SAE-AMS-QQ-S-763, class 304, condition A; Part - ;PLUG, Item 23; Material - ;ASTM-A582, Type 303; Part - ;SOCKET HEAD CAP SCREW, Items 27, 28, 29, 30, 31, 32, 33, and 35; Material - ;SAE-AMS-5643, condition H-1025 with self locking element per MIL-DTL-18240 Type L; ;Vacco drawing S3C10054, part number S3C10054-01 (Bleed Block Assembly); Part - ;BODY, Item 1; Material - ;ASTM-A582, 300 series or SAE-AMS-QQ-S-763, 300 series; Part - ;STEM, Item 2; Material - ;SAE-AMS-5643, condition H-1025 with self-locking element to meet the intent of MIL-DTL-18240 Type N; ;Vacco drawing S3C10053, part number S3C10053-01 (Gauge Connection Assembly); Part - ;BODY, Item 1; Material - ;ASTM-A582, 300 series or SAE-AMS-QQ-S-763, 300 series; Part - ;STEM, Item 2; Material - ;SAE-AMS-5643, condition H-1025 with self-locking element to meet the intent of MIL-DTL-18240 Type N; ;Vacco drawing V3D10431, part numbers V3D10431-02 and V3D10431-01 (Regulator Assemblies); Part - ;POPPET, Item 2; STEM, Item 3; PISTON, Item 6; and STEM GUIDE, Item 16; Material - ;SAE-AMS-5643, condition H-1025; Part - ;DISC COMPRESSOR, Item 4 and BODY, Item 5; Material - ;SAE-AMS-QQ-S-763, class 304, condition A; Part - ;DOME CAP, Item 7; Material - ;ASTM-A582, Type 303; Part - ;SEAL TUBE, Item 12; Material - ;ASTM-A581, Type 303, Condition A or ASTM-A582, Type 303, Condition A; Part - ;ORIFICE BLOCK, Item 15; Material - ;SAE-AMS-5643, condition H-1150; Part - ;SOCKET HEAD CAP SCREWS, SELF LOCKING, Item 24; Material - ;SAE-AMS-5643, condition H-1025, with self locking element per MIL-DTL-18240 Type L; ;Vacco drawing V3D10436, part number V3D10436-01 (Regulator Control Block Assembly); Part - ;BODY, Item 1, and ORIFICE BLOCK, Item 2; Material - ;SAE-AMS-QQ-S-763, condition A, class 304; Part - ;SEAT, Item 3; Material - ;ASTM-B138, Alloy C67500 or ASTM-B150, Alloy C62400 or Alloy C63200; Part - ;STEM, Item 5; Material - ;SAE-AMS-5643, condition H-1025; Part - ;GLAND, Item 6; Material - ;ASTM-B138, Alloy C67500, Half Hard; ;Vacco drawing V3D10435, part number V3D10435-01 (Inlet/By-Pass Valve); Part - ;ORIFICE BLOCK, Item 1; Material - ;ASTM-A582, Type 303, Condition A; Part - ;BONNET, Item 2; Material - ;SAE-AMS-QQ-S-763, class 304, condition A; Part - ;POPPET, Item 3; Material - ;SAE-AMS-5643, condition H-1025; ;Vacco drawing V3D10434, part number V3D10434-01 (Outlet Valve); Part - ;ORIFICE BLOCK, Item 1 and BONNET, Item 2; Material - ;ASTM-A582, Type 303, Condition A; Part - ;POPPET, Item 3; Material - ;SAE AMS 5643, condition H-1025; ;Vacco drawing V3D10437, part number V3D10437-01 (Relief Valve); Part - ;BODY, Item 1; Material - ;SAE-AMS-5643, condition H-1025; ;Vacco drawing F3C10321, part number F3C10321-225 (DP Indicator); Part - ;BODY, Item 1, BONNET, Item 4; Material - ;ASTM-A582, Type 303, Condition A; Part - ;PISTON, item 2; Material - ;SAE-AMS-5643, condition H-1025; Part - ;ADJUSTING SCREW, Item 9; Material - ;ASTM-A582, Type 303 with self-locking element to meet the intent of MIL-DTL-18240 Type N; 3.4 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below. Test - 5x Visual Magnification or Dye Penetrant Inspection (root layer) Item - Weldments Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - Visual and Dye Penetrant Inspection (final layer) Item - Weldments Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - ;Liquid Penetrant Inspection; Item - ;Items 27, 28, 29, 30, 31, 32, 33, and 35 of drawing S1E10205 and Item 24 of drawing V3D10431; Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222 Acceptance - MIL-DTL-1222 Test - ;Production Testing; Item - ;Each Manifold Assembly; Performance - ;PTP-S1E10205-01; Acceptance - ;PTP-S1E10205-01; Test - Intergranular Corrosion Test (Only for SAE-AMS-QQ-S-763, Classes 304-condition A, 304L, 316-condition A, 316L, 317-condition A, 321 and 347 material. Test must be performed prior to fabrication/machining) Item - ;Items 1 and 6 of drawing S1E10205; Item 1 of drawing S3C10054; Item 1 of drawing S3C10053; Items 4 and 5 of drawing V3D10431; Items 1 and 2 of drawing V3D10436; and Item 2 of drawing V3D10435; Performance - SAE-AMS-QQ-S-763 Acceptance - SAE-AMS-QQ-S-763 Test - Intergranular Corrosion Testing Item - ;Item 1 of drawing S1E10205 (Only for ASTM-A240 material); Performance - ASTM-A262, Practice E Acceptance - ASTM-A262 Test - Non-Destructive Tests Item - ;Weld Repair (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification 3.5 Heat Treat Requirements - Mechanical properties (via tension testing and hardness testing if hardness is required by the applicable material specification) are required for each heat in each heat treat charge for ASTM-A234, ASTM-A403, ASTM-A182, and ASTM-A105 material. 3.5.1 If heat treatment is performed in continuous-type furnaces with suitable temperature control and equipped with recording pyrometers so that complete heat-treatment records are available, a heat-treatment charge must be considered as any continuous run not exceeding an 8-hr duration. One tension test must be taken from one forging per heat in each heat treatment charge at a minimum of every 8 hours. 3.5.2 Certification of Mechanical Properties (Mechanical Analysis, Tension Testing) must include the condition furnished. The contractor must maintain a complete record on file of the heat treatment given each piece, including stress relief. The contractor must provide either the record of the final heat treatment or a heat treatment certification statement. The certification statement must be signed by the heat-treater and include the date of heat treatment, duration and temperature of heat treatment operations and quenching medium (if required). 3.6 Wedge Tensile Test Specimens (Headed fasteners) - A wedge tensile test must be conducted on a Full Size Fastener for each production lot and reported aspart of the Mechanical Properties. The required specimens for the Wedge Tensile Test must be separate fasteners from those required for the Yield Test. 3.6.1 Testing for Socket Head Cap Screws must be in accordance MIL-DTL-1222, paragraphs 4.5.2.3 and 4.5.2.3.1. 3.6.2 Testing for all other Headed Fasteners with a nominal diameter greater than 1/4-inch must be in accordance with ASTM-F606 for grades 5, 8, B7, and B16.For all other grades, the following wedge angles must be used. a. Except as specified in item c below, fasteners with a nominal diameter of 1/4-inch through 1-inch (inclusive) must be tested with a ten degree wedge. b. Except as specified in item c below, fasteners with a nominal diameter over 1-inch must be tested with a six degree wedge. c. Fasteners that are of grades 8, B7, B16, 410, 416, 416Se, 431, and 630 and are threaded within one diameter to the underside of the head must be tested as follows: Sizes 1/4 inch through 3/4 inch (inclusive) Use a six degree wedgeSizes over 3/4 inch Use a four degree wedge d. Fasteners which have passed testing with wedge angles greater than those specified should be considered acceptable. 3.6.3 For fasteners having a length less than the minimum specified in Table 1 of ASTM-F606, one "test specimen fastener" must be manufactured from each lot of fasteners and tested to represent that lot. The length of these test specimen fasteners must meet the minimum specified in table 1 of ASTM-F606 but must not exceed it by more than 1/4 inch. Test specimen fasteners must be the same type, style, and diameter as the production lot and must be manufactured from the same starting material, using the same manufacturing techniques as the production lot, and must be heat treated (if required) along with the production lot. 3.7 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.8 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria. The GAC document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/ 3.9 Component Identification Description (CID) - When applicable drawing(s) and/or specification(s) specify that a nameplate or identification plate is required, the CID number ( ;CID 887355431; ) must be added. When no plate is specified, an identification plate in accordance with MIL-DTL-15024, Type "C" on brass or Type "H" on aluminum must be securely attached to each assembly showing the above CID number. No assembly must be shipped without the CID number attached. 3.10 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.11 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.11.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.11.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.11.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.12 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.13 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in tMore from United States Department of the Navy posted in January 2024