<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_navy/posts/108549321576750508" -->

---
title: 43--PUMP UNIT,CENTRIFUG, IN REPAIR/MODIFICATION… (N0010422QZB54) | Closed - MatchAwards
description: 43--PUMP UNIT,CENTRIFUG, IN REPAIR/MODIFICATION OF. United States Department of the Navy. Solicitation N0010422QZB54. NAICS 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing. Deadline 2022-06-30. CONTACT...
canonical: https://matchawards.com/dept_of_the_navy/posts/108549321576750508
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: 43--PUMP UNIT,CENTRIFUG, IN REPAIR/MODIFICATION… (N0010422QZB54) | Closed
og:url: https://matchawards.com/dept_of_the_navy/posts/108549321576750508
og:description: 43--PUMP UNIT,CENTRIFUG, IN REPAIR/MODIFICATION OF. United States Department of the Navy. Solicitation N0010422QZB54. NAICS 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing. Deadline 2022-06-30. CONTACT...
og:image: https://matchawards.com/system/accounts/avatars/000/000/085/original/a0262fe00d6c038b.png?1638992122
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# 43--PUMP UNIT,CENTRIFUG, IN REPAIR/MODIFICATION OF

Status

Closed (archived notice)

Agency

[United States Department of the Navy](/dept%5Fof%5Fthe%5Fnavy)

Office

MECHANICSBURG, USA

Notice type

Solicitation

Solicitation number

N0010422QZB54

NAICS

[333999 - All Other Miscellaneous General Purpose Machinery Manufacturing](/groups/500)

PSC

4320 - POWER AND HAND PUMPS

Category

[Machinery & Components (5.1)](/categories/industrial-products-and-services/machinery-and-components)

Posted

2022-06-27

Deadline

2022-06-30

## Description

CONTACT INFORMATION|4|N742.8|WR5DD|717-605-2982|brittany.a.langletz.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| TIME OF DELIVERY (JUNE 1997)|20|CLIN 0001AA|One (1)|600|||||||||||||||||| REPAIR DELIVERY (FIRM FIXED PRICE)|1|600 | WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Certifications - Stand-Alone Receiving Report Material - Receiving Report & Invoices |Material - Inspect & Accept at Source|To Be Determined (TBD)|N00104|TBD|TBD|N60138|TBD|N/A|N/A|N/A|Certifications - N45404|N /A|N/A|See form DD1423|1-866-618-5988 - WAWF Helpdesk| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| FIRM FIXED PRICE REPAIR PURCHASE ORDERS|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|333914|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1\. This is an advanced Equipment Repair Program (AERP) requirement. 2\. This solicitation is for the repair of qty. 1 NSN: 7HH 4320 013053618 A3, PUMP UNIT,CENTRIFUG 3\. All contractual documents (i.e. contracts, purchase orders, taskorders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 4\. Any contract awarded as a result of this solicitation will be DO certified for national defense use under the Defense Priorities and AllocationsSystem (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contract to be awarded will be a rated order. 5.When submitting quotes, specify any exceptions, i.e. MIL-STD packaging, MIL-STD labeling, inspection and acceptance locations, packaging houses, surplus material, etc. If no exceptions are indicated or received, award will be basedupon solicitation requirements. Changes or requests for changes after award will have consideration costs deducted from the unit price. 6.If supplies will be packaged at a location different from the offeror address, the offeror shall provide the name, street address, and cage code of the packaging facility. 7.If you are not the manufacturer of the material you are offering, you must state who the manufacturer is (name and cage code) and be able to provide traceability information if requested. Examples of traceability documentation include but are not limited to: purchase order/invoice between you and the manufacturer identifying the part number, revision level and quantities, manufacturer's packing slip or certification identifying the part number, revision level, and quantities. 8.This requirement is pursuant to the Special Emergency Procurement Authority (SEPA). 9\. Please provide repair price as firm or not-to-exceed. Specify on proposal firm or NTE. If you choose firm repair pricing, consider the following: Include repair price with all costs associated with receipt and complete repairof material that may be in unwhole condition, missing hardware,damaged, handling damage, missing parts, wear damage, and CAV reporting. All transportation to/from repair site will be paid for by US Navy. Also, please provide: Teardown and Evaluation Rate: \_\_\_\_\_\_\_\_\_ RTAT: \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_ Throughput Constraint: \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_ Induction Expiration Date: \_\_\_\_\_\_\_\_\_\_\_\_\_\_ Repair Turnaround Time (RTAT): the resultant contractual deliveryrequirement is measured from asset Return to the date of asset acceptanceunder the terms of the contract. For purposes of this section, Return isdefined as physical receipt of the F-condition asset at the contractor'sfacility as reflected in the Action Date entry in the Commercial AssetVisibility (CAV) system. In accordance with the CAV Statement of Work, thecontractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Requested RTAT: 600 Days 10\. Price Reduction Any assets for which the contractor does not meet the required RTAT will incur a price reduction of XXXX per unit. This adjustment will be implemented via a reconciliation modification at the end of contract performance. Price reductionsmade pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. 11.Reconciliation A reconciliation modification will be issued after final inspection andacceptance of all assets inducted under this contract. The parties haveagreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the contractor meeting the RTAT requirements described within the schedule page. If the contractor does not meet the applicable RTAT requirement, the price adjustment as stated shall be applicable. 12\. Offerors must have a valid U.S. security clearance of CONFIDENTIAL or higher inorder to respond to this RFP N00104-22-R-ZA68, because SOL N0010422QZB54includes and annex (information) classified at the CONFIDENTIAL level which will be released only to the offerors possessing the appropriate clearance. All classified material must be handled in accordance with the National Industrial Security Program Operating Manual (NISPOM) (DoD 5220-22-M)and Industrial Security Regluation (DoD5220.22-R). 13.This requirement will be contracted under Basic Ordering Agreement (BOA)N0010417GAS01\. 1\. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the PUMP UNIT,CENTRIFUG . 1.2 Government Furnished Material - Government furnished material is available. The material and quantities are as follows: ;MOTOR NIIN 013025352, QTY 1; . 2\. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. DRAWING DATA=4456141 |80064| A| |X|0001 | A|00026|0000000 3\. REQUIREMENTS 3.1 Refurbished Material - This item must be inspected and where necessary, refurbished to be in accordance with CAGE ;93232; , drawing ;RW-183760; ,and the applicable SUBMEPP Repair Instruction ;5080-012-0713 Rev D (CSD339); , except as amplified or modified herein. 3.1.1 Parts that are replaced during refurbishment must be in accordance with this TDP (Technical Data Package) and the SUBMEPP Repair Instruction. 3.2 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD339; in ECDS at https://register.nslc.navy.mil/ 3.3 Confidential Hydrostatic Test Pressures - When test pressures are confidential, certification must reference ;4456141 Rev A; and the item number to which the item was tested in lieu of the actual pressures. Any drawing requirement to mark the working pressure on the item does not apply and is strictly prohibited. 4\. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5\. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. 5.1.1 Additional Preservation, Packaging, Packing and Marking requirements are included in the referenced Refurbishment Instruction or Procurement Specification from SUBMEPP. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6\. NOTES - NOT APPLICABLE DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. 

<!-- mobian-agent-ad sponsored="true" id="d602839c-76a6-4adf-9466-d0d307fde297" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/industrial-products-and-services/machinery-and-components?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


[Source notice](https://sam.gov/opp/f509810e15c742e9a526980c33c1894c/view)

[More from United States Department of the Navy posted in June 2022](/dept%5Fof%5Fthe%5Fnavy/archive/2022-06)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"43--PUMP UNIT,CENTRIFUG, IN REPAIR/MODIFICATION OF","description":"CONTACT INFORMATION|4|N742.8|WR5DD|717-605-2982|brittany.a.langletz.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| TIME OF DELIVERY (JUNE 1997)|20|CLIN 0001AA|One (1)|600|||||||||||||||||| REPAIR DELIVERY (FIRM FIXED PRICE)|1|600 | WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Certifications - Stand-Alone Receiving Report Material - Receiving Report \u0026 Invoices |Material - Inspect \u0026 Accept at Source|To Be Determined (TBD)|N00104|TBD|TBD|N60138|TBD|N/A|N/A|N/A|Certifications - N45404|N /A|N/A|See form DD1423|1-866-618-5988 - WAWF Helpdesk| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| FIRM FIXED PRICE REPAIR PURCHASE ORDERS|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|333914|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1. This is an advanced Equipment Repair Program (AERP) requirement. 2. This solicitation is for the repair of qty. 1 NSN: 7HH 4320 013053618 A3, PUMP UNIT,CENTRIFUG 3. All contractual documents (i.e. contracts, purchase orders, taskorders, delivery orders, and modifications) related to the instant procurement are considered to be \"issued\" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to \"issue\" contractual documents as detailed herein. 4. Any contract awarded as a result of this solicitation will be DO certified for national defense use under the Defense Priorities and AllocationsSystem (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contract to be awarded will be a rated order. 5.When submitting quotes, specify any exceptions, i.e. MIL-STD packaging, MIL-STD labeling, inspection and acceptance locations, packaging houses, surplus material, etc. If no exceptions are indicated or received, award will be basedupon solicitation requirements. Changes or requests for changes after award will have consideration costs deducted from the unit price. 6.If supplies will be packaged at a location different from the offeror address, the offeror shall provide the name, street address, and cage code of the packaging facility. 7.If you are not the manufacturer of the material you are offering, you must state who the manufacturer is (name and cage code) and be able to provide traceability information if requested. Examples of traceability documentation include but are not limited to: purchase order/invoice between you and the manufacturer identifying the part number, revision level and quantities, manufacturer's packing slip or certification identifying the part number, revision level, and quantities. 8.This requirement is pursuant to the Special Emergency Procurement Authority (SEPA). 9. Please provide repair price as firm or not-to-exceed. Specify on proposal firm or NTE. If you choose firm repair pricing, consider the following: Include repair price with all costs associated with receipt and complete repairof material that may be in unwhole condition, missing hardware,damaged, handling damage, missing parts, wear damage, and CAV reporting. All transportation to/from repair site will be paid for by US Navy. Also, please provide: Teardown and Evaluation Rate: _________ RTAT: ____________________ Throughput Constraint: ________________ Induction Expiration Date: ______________ Repair Turnaround Time (RTAT): the resultant contractual deliveryrequirement is measured from asset Return to the date of asset acceptanceunder the terms of the contract. For purposes of this section, Return isdefined as physical receipt of the F-condition asset at the contractor'sfacility as reflected in the Action Date entry in the Commercial AssetVisibility (CAV) system. In accordance with the CAV Statement of Work, thecontractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Requested RTAT: 600 Days 10. Price Reduction Any...","url":"https://matchawards.com/dept_of_the_navy/posts/108549321576750508","identifier":"N0010422QZB54","category":"333999 - All Other Miscellaneous General Purpose Machinery Manufacturing","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"4320 - POWER AND HAND PUMPS"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"5.1 Machinery \u0026 Components","url":"https://matchawards.com/categories/industrial-products-and-services/machinery-and-components"}],"availabilityStarts":"2022-06-27","availabilityEnds":"2022-06-30","sameAs":"https://sam.gov/opp/f509810e15c742e9a526980c33c1894c/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Manufacturing","item":"https://matchawards.com/contracts/manufacturing"}]}
```

