<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_navy/posts/108430413039586887" -->

---
title: 17--SHUTTLE ASSEMBLY (N0038322RP187) | Closed - MatchAwards
description: 17--SHUTTLE ASSEMBLY. United States Department of the Navy. Solicitation N0038322RP187. NAICS 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing. Deadline 2022-03-11. CONTACT INFORMATION|4|tbd|tbd|tbd|tbd| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR...
canonical: https://matchawards.com/dept_of_the_navy/posts/108430413039586887
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: 17--SHUTTLE ASSEMBLY (N0038322RP187) | Closed
og:url: https://matchawards.com/dept_of_the_navy/posts/108430413039586887
og:description: 17--SHUTTLE ASSEMBLY. United States Department of the Navy. Solicitation N0038322RP187. NAICS 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing. Deadline 2022-03-11. CONTACT INFORMATION|4|tbd|tbd|tbd|tbd| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR...
og:image: https://matchawards.com/system/accounts/avatars/000/000/085/original/a0262fe00d6c038b.png?1638992122
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# 17--SHUTTLE ASSEMBLY

Status

Closed (archived notice)

Agency

[United States Department of the Navy](/dept%5Fof%5Fthe%5Fnavy)

Office

PHILADELPHIA, USA

Notice type

Solicitation

Solicitation number

N0038322RP187

NAICS

[333999 - All Other Miscellaneous General Purpose Machinery Manufacturing](/groups/500)

PSC

1720 - AIRCRAFT LAUNCHING EQUIPMENT

Posted

2022-06-06

Deadline

2022-03-11

## Description

CONTACT INFORMATION|4|tbd|tbd|tbd|tbd| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19||tbd|tbd||||||||||||||||| TIME OF DELIVERY (JUNE 1997)|20||||||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|tbd|tbd|tbd|n00383|tbd|tbd|see schedule |tbd||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months |60 days after discovery of defect ||||| SMALL BUSINESS SUBCONTRACTING PLAN (NOV 2021)|4||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (FEB 2019)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2022)|13|336413|1000|||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2|x|| 1\. SCOPE 1.1 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LKE; drawing number ( ;80020; ) ;622559-4; , Revision ;C; and all details and specifications referenced therein. 1.2 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. MIL-W-22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD 454 is referenced in the drawings or in the specifications, the contractor is expected to show compliance with the latest revision of MIL-STD 2000A. Personnel performing tasks in accordance with MIL-STD-2000A shall be trained and certified as required by MIL-STD-2000A paragraph 5.1.4\. 1.5 All prospective contractors are hereby advised that the Naval Inventory Control Point (NAVICP) has had many difficulties in the past procuring ;Shuttle Assy; in accordance with the contractual specifications. This office has reviewed the data package referenced herein and has concluded that the package is adequate for competitive procurement. These items are extremely difficult to manufacture and require a high level of technical expertise on the part of the contractor in order to manufacture an acceptable item. 1.6 This item's manufacturing process includes a ;Forging; which is machined and heat treated, but not necessarily in that order. Few, if any small businesses are equipped to do the entire job. What has happened in several past instances where NAVICP has attempted to procure these critical items is that a machine shop is awarded the contract, performs the machining and subcontracts the balance of the effort. The contractor undoubtedly receives several vendor quotes and it appears to select the lowest one, and on that basis submits a bid to NAVICP. It is suspected that in many instances, neither the bidder nor the contractor realize the complexity and difficulty of the effort involved in the ;welding; ,and machining processes. A selection of a subcontractor on the basis of price alone without due regard to the high quality of workmanship required may have been the cause of difficulties experienced by many past contractors. 1.7 Responsibility of the prospective contractor. The contracting officer has determined that the contribution of subcontractors in the areas of ;Plating, Heat Treat; and machining is so vital to the performance of the product to be delivered hereunder that their responsibility must be established prior to the award of any contract. Offerors are required to indicate the name and address of their proposed subcontractor for each of the following areas of effort ;Forging, Heat Treat/ Mag. Particle/ Welding/ Plating; . 1.8 Attention is directed to paragraph (i) of FAR 52209.3 of this contract entitled "First Article Approval Contractor Testing". In addition, the successful contractor hereunder will be required to use the subcontractor they have chosen and upon their own responsibility was in part determined in the manufacture of both the first article and all subsequent production articles under this contract. A certification by the contractors as to the subcontractors participating in the manufacture of the above first article in the above areas must accompany each first article which is offered. Any changes or substitution of subcontractor names in the contract without the express written approval of the contracting officer at the Naval Inventory Control Point will be considered to be a deviation from the contract requirement. Such approval cannot be granted by DCMC, NAWC, or any Government activity or person other than the contracting officer of the Naval Inventory Control Point. 1.9 The Naval Air Warfare Center will make no deviations from the contractual specifications nor will NAVICP permit any. 1.10 The fact that the Government has approved or determined a particular proposed subcontractor to be responsible to perform a particular process involved shall not in any way be deemed to excuse the contractor from their obligation to deliver articles which fully meet the specifications and other requirements of the contract 1.11 The Surveillance criticality designator shall be coded ;A; ; due to the critical use of the subject item. The Contract Administration Office shall advise the Procurement Officer of any contract delays. 1.12 . Markings shall be in accordance with MIL-STD-130\. 1.13 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.14 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.15 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.16 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.17 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.18 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.19 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.20 . The contractor shall include on the detailed process/operation sheets developed, (1) all in house manufacturing processes and (2) the identity of all manufacturing sources performing processes/operations outside their facility. These sheets shall not be revised or altered after the successful completion of First Article or Production Lot Testing without approval from the Basic Design Engineering activity, via the PCO. 1.21 . Unless otherwise specified, for fabricated parts, the Inspection Method Sheets/ Final Inspection Sheets shall list the characteristics of each item produced under the contract. The manufacturer shall be required to provide certifications of all raw material including castings and forgings. the material source shall be identified and the documentation shall be able to identify the customer and/or contract number. The manufacturer shall maintain all raw material documentation for a minimum of ten (10) years. The contractor is responsible for providing completed Inspection Method Sheets/Final Inspection Sheets showing the actual dimensions taken for ALL Characteristics,in addition, critical characteristics shall be annotated. 1.22 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;80020; ) ;622559-4; , Revision ;F; and all details and specifications referenced therein. 1.23 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.24 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2\. APPLICABLE DOCUMENTS DRAWING DATA=A410485 |80020| D| |A| | | | DRAWING DATA=E88963 |80020|13| |A| | | | DRAWING DATA=F88963 |80020| U| |A| | | | DRAWING DATA=MPR 10 |80020| D| |A| | | | DRAWING DATA=MPR 1021 |80020| B| |A| | | | DRAWING DATA=MPR 1061 |80020| E| |A| | | | DRAWING DATA=MPR 1221 |80020| R| |A| | | | DRAWING DATA=MPR 1223 |80020| B| |A| | | | DRAWING DATA=NAEC-ENG-6518 |80020|BM| |A| | | | DRAWING DATA=408296 |80020| F| |A| | | | DRAWING DATA=408297 |80020| L| |A| | | | DRAWING DATA=408343 |80020| G| |A| | | | DRAWING DATA=408344 |80020| G| |D| | | | DRAWING DATA=408347 |80020| R| |D| | | | DRAWING DATA=408348 |80020| G| |D| | | | DRAWING DATA=408350 |80020| P| |D| | | | DRAWING DATA=408351 |80020| J| |D| | | | DRAWING DATA=408352 |80020| F| |D| | | | DRAWING DATA=416953 |80020| G| |D| | | | DRAWING DATA=416960 |80020| C| |D| | | | DRAWING DATA=504810 |80020| F| |D| | | | DRAWING DATA=511600 |80020| B| |D| | | | DRAWING DATA=516404 |80020| K| |D| | | | DRAWING DATA=614772 |80020|AB| |D| | | | DRAWING DATA=622559-4 |80020| F| |D| | | | 3\. REQUIREMENTS - NOT APPLICABLE 4\. QUALITY ASSURANCE 4.1 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1\. Critical characteristics: 100% inspection shall apply. 2\. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;The contractor shall accomplish 100% inspection and/or testing of all critical and/or requirements identified in the drawings, drawing notes, and process and Results shall consist of actual dimensions, measurements, and test outcomes and in the First Article test report. CERTIFICATIONS TO BE ON FILE FOR A MINIMUM OF SEVEN YEARS AFTER DELIVERY OF CONTRACT.; C. Major and Minor characteristics 1\. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 4.2 CRITICAL MANUFACTURING PROCESSES ( ;APPLIES; ) HEAT TREAT ( ;APPLIES; ) WELDING ( ; ; ) CADMIUM PLATING ( ; ; ) ENGINEERING CHROME PLATING ( ; ; ) NICKEL CHROME PLATING ( ;APPLIES; ) CASTING(S) ( ;APPLIES; ) FORGING(S) ( ;APPLIES; ) MPR (MATERIAL PROCESSING REQUIREMENTS) 4.3 IN PROCESS INSPECTION REQUIREMENTS: Due to the critical nature of this item it is necessary to conduct in-process inspections on critical component features, attributes, or manufacturing processes. The contractor shall notify the PCO and NAWC via email or TELEFAX PCO and NAWC Lakehurst QA ;ROY JANNEY NAWC QA REP AT FAX (732) 323-4986; to arrange for the in-process inspection. A minimum of 10 days is needed for advance notice for each occurrence. The authority of the QAR shall not be abrogated. The QAR shall verify that timely notification was given all parties listed below. CHARACTERISICS TO BE INSPECTED: ;THE FOLLOWING ITEMS REQUIRES AN INTERIM INSPECTION AT THE CONTRACTORS LOCATION:; ;Interim inspection shall include Hardness Test, Magnetic Particle Inspection, and Dimensional Inspection per Drawing 614772 prior to paint. Contractor Assist and Marking as specified below applies 614772 prior to paint. Contractor Assist and Marking as specified below applies The contractor shall assist on the conduct of the interim inspection(s) as described herein. The contractor shall provide adequate facilities, inspection equipment, and skilled personnel, to support the NAVAIR Inspector in the conduct of the interim inspection(s). The contractor shall provide gauges, tools, fixtures, and jigs necessary to perform the inspections. The contractor shall also provide sufficient rigging/material handling services and manpower to setup/configure/operate equipment & machines used to accomplishthe inspection task. This contractor assist requirement shall be applicable to 100% of the production quantities and as a minimum, include inspection of all (100%) interim of all (100%) interim inspection requirements identified above.; ;NAWCADLKE has the option to witness the interim inspections. i. Interim inspection shall include Hardness Test, Magnetic Particle Inspection 614772 prior to paint. Contractor Assist and Marking as specified below applies; ; ; ; ; ; ; 4.4 SPECIAL INSPECTION REQUIREMENTS ( ;APPLIES; ) MAGNETIC PARTICLE INSPECTION ( ;APPLIES; ) SURFACE INSPECTION ( ;APPLIES; ) PENETRANT INSPECTION ( ; ; ) RADIOGRAPHIC INSPECTION ( ; ; ) ULTRSONIC INSPECTION ( ; ; ) HIGH SHOCK TEST ( ; ; ) MECHANICAL VIBRATION TEST 4.5 The tests to be performed under the First Article approval clause (FAR 52.209-4) of the contract are listed below. 4.5.1 Dimensional test (special) ;CLOSE MACHINE TOLERANCES. HARDNESS TEST; 4.5.2 Requirements of: ;LKE DRAWING PACKAGE; 4.5.3 Form: ;APPLIES; 4.5.4 Fit: ;N/A; 4.5.5 Function ;N/A; 4.5.6 Compliance with drawing ( ;80020; ) ;422559; , Revision ;F; and specifications referenced therein. 4.6 In addition to the above tests, the First Article(s) to be delivered hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with contract requirements requirements. 4.7 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during testing. 4.8 The cost of the Government testing effort set forth in this solicitation is estimated to be $ ;$5000; for the first article testing. This cost factor will be added, for solicitation purposes, to the price of all offerors for whom the government will require such testing. 4.9 Disposition of FAT samples 4.9.1 ; ; Sample(s) shall not be returned to the contractor because they shall be destroyed during testing. 4.9.2 ;APPLIES; Unless otherwise provided for in the contract, sample(s) shall be returned to the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval from the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. ; ; Sample(s) shall be returned to the contractor but shall not be considered as production due. 4.10 Test Sample Coating Instructions 4.10.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative.This paragraph does NOT apply to shipping containers. 4.11 FAT Approval Criteria 4.11.1 FAR 52.209-4 applies (A) The contractors shall deliver ;ONE; ; unit(s) of the following CAGE ( ;80020; ; ) Part Number ;622559-4; ; , Revision ;F; ; within ;200; ; calendar days from the date of this contract to the Government at ;NAVAL AIR WARFARE CENTER BL41600 (ATTN:PAUL CAMPUS) BUILDING 148-2 / HIGHWAY 547 LAKEHURST, NJ 08733-5125; ; Marking of test sample(s) shipping container shall be as follows, citing this contract number: "FOR FIRST ARTICLE TESTING. NOT RFI MATERIAL. DO NOT TAKE UP IN STOCK CONTRACT NUMBER:\_\_\_\_\_\_\_\_\_\_\_\_" For First Article Test, the shipping documentation shall contain this contract number and lot/item identification. The characteristics that the First Article must meet and the testing requirements are specified elsewhere in this contract. (B) Upon shipment of First Article sample(s), two (2) copies of the Material Inspection and Receiving Report (DD Form 250) bearing the QAR's signature and indication of preliminary inspection shall be forwarded to the NAVICP- Philadelphia code cited in Block 10.a of SF33, with duplicate copies to NAVICP code 072 and to the designated test facility. The envelopes shall be clearly marked: "DO NOT OPEN IN MAIL ROOM". Within ;30; ; days after receipt of the samples, the test site shall complete testing/evaluation and submit two (2) copies of their test report with conclusions and recommendations to the NAVICP code cited in Block 10.a of the SF33\. (C) Within ;45; ; calendar days after the Government receives the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional approval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval. (D) If the First Article is disapproved, the contractor, upon Government request, shall submit an additional First Article for testing. After each request, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall furnish any additional First Article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this First Article within the time limit specified in paragraph (B) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. (E) If the contractor fails to deliver 

<!-- mobian-agent-ad sponsored="true" id="87047fe5-1d65-44c0-bf57-0c62f1dbc744" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


[Source notice](https://sam.gov/opp/669038d36fe04bf78a33349156b2ba46/view)

[More from United States Department of the Navy posted in June 2022](/dept%5Fof%5Fthe%5Fnavy/archive/2022-06)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"17--SHUTTLE ASSEMBLY","description":"CONTACT INFORMATION|4|tbd|tbd|tbd|tbd| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19||tbd|tbd||||||||||||||||| TIME OF DELIVERY (JUNE 1997)|20||||||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|tbd|tbd|tbd|n00383|tbd|tbd|see schedule |tbd||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months |60 days after discovery of defect ||||| SMALL BUSINESS SUBCONTRACTING PLAN (NOV 2021)|4||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (FEB 2019)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2022)|13|336413|1000|||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2|x|| 1. SCOPE 1.1 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LKE; drawing number ( ;80020; ) ;622559-4; , Revision ;C; and all details and specifications referenced therein. 1.2 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. MIL-W-22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD 454 is referenced in the drawings or in the specifications, the contractor is expected to show compliance with the latest revision of MIL-STD 2000A. Personnel performing tasks in accordance with MIL-STD-2000A shall be trained and certified as required by MIL-STD-2000A paragraph 5.1.4. 1.5 All prospective contractors are hereby advised that the Naval Inventory Control Point (NAVICP) has had many difficulties in the past procuring ;Shuttle Assy; in accordance with the contractual specifications. This office has reviewed the data package referenced herein and has concluded that the package is adequate for competitive procurement. These items are extremely difficult to manufacture and require a high level of technical expertise on the part of the contractor in order to manufacture an acceptable item. 1.6 This item's manufacturing process includes a ;Forging; which is machined and heat treated, but not necessarily in that order. Few, if any small businesses are equipped to do the entire job. What has happened in several past instances where NAVICP has attempted to procure these critical items is that a machine shop is awarded the contract, performs the machining and subcontracts the balance of the effort. The contractor undoubtedly receives several vendor quotes and it appears to select the lowest one, and on that basis submits a bid to NAVICP. It is suspected that in many instances, neither the bidder nor the contractor realize the complexity and difficulty of the effort involved in the ;welding; ,and machining processes. A selection of a subcontractor on the basis of price alone without due regard to the high quality of workmanship required may have been the cause of difficulties experienced by many past contractors. 1.7 Responsibility of the prospective contractor. The contracting officer has determined that the contribution of subcontractors in the areas of ;Plating, Heat Treat; and machining is so vital to the performance of the product to be delivered hereunder that their responsibility must be established prior to the award of any contract. Offerors are required to indicate the name and address of their...","url":"https://matchawards.com/dept_of_the_navy/posts/108430413039586887","identifier":"N0038322RP187","category":"333999 - All Other Miscellaneous General Purpose Machinery Manufacturing","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"1720 - AIRCRAFT LAUNCHING EQUIPMENT"}],"availabilityStarts":"2022-06-06","availabilityEnds":"2022-03-11","sameAs":"https://sam.gov/opp/669038d36fe04bf78a33349156b2ba46/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Manufacturing","item":"https://matchawards.com/contracts/manufacturing"}]}
```

