ClickCease 80--ADHESIVE (N0010422QNE05) | Closed - MatchAwards

80--ADHESIVE

Status
Closed (archived notice)
Agency
United States Department of the Navy
Office
MECHANICSBURG, USA
Notice type
Solicitation
Solicitation number
N0010422QNE05
NAICS
333999 - All Other Miscellaneous General Purpose Machinery Manufacturing
PSC
8040 - ADHESIVES
Category
Facility Related Materials (4.3)
Posted
2022-05-09
Deadline
2022-05-31

Description

CONTACT INFORMATION|4|N744.8|GDS|717-605-7751|STEVE.SMITHEY@NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|TBD|TBD|TBD|TBD|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2022)|13|325520|500|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1. This solicitation is for the PROCUREMENT of 49 each NSN 8040 01-312-8537 in accordance with Reference number 5808332, (DTNSRDC 2844-1102). The Government does not own the drawings or data rights to this NSN. 2. Government-Source Inspection and Acceptance (G-S I&A) is required. If the G-S I&A will occur at a different CAGE from the Admin Award CAGE, please provide the procurement facility CAGE and/or packaging CAGE with the quote. 3. MIL-STD Packaging is required and it will not be waived. 4. Please provide the following information in the procurement quote: A. Your CAGE (used as the awardee CAGE):___________________ B. the unit procurement price: $____________________________________ (Firm Fixed Price). C. The procurement CAGE _____________ and packaging CAGE___________ (as described in #2). D. Procurement Acquisition Time, delivered in _____ days. PLEASE NOTE THE FOLLOWING WHEN GENERATING YOUR QUOTE: We are requesting that the quote's validity extend for 6 months from the submitted proposal date. 5. Since there is only one business concern capable of procurement on this NSN, the Small Business Set-Aside requirement has been dissolved. 6. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications)related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 7. Please submit a procurement quote to Steve Smithey via email: STEVE.SMITHEY@NAVY.MIL. This is the only submission method authorized. All other delivery methods (i.e., fax, NECO, etc.) will not be accepted. 8. Please read this solicitation in its entirety. Please direct questions regarding this solicitation to the person listed above (#6). 9. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the ADHESIVE . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.1.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.1.3 The "Document Changes" section provides supersessions/changes to referenced documents. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=5808332 |53711| C| |D|0001 | C|49998|0019672 DRAWING DATA=5808332 |53711| C| |D|0002 | C|49998|0022377 DRAWING DATA=5808332 |53711| C| |D|0003 | C|49998|0029310 DRAWING DATA=5808332 |53711| C| |D|0004 | C|49998|0041385 DRAWING DATA=5808332 |53711| C| |D|0005 | C|49998|0041003 DRAWING DATA=5808332 |53711| C| |D|0006 | C|49998|0044961 DRAWING DATA=5808332 |53711| C| |D|0007 | C|49998|0040160 DRAWING DATA=5808332 |53711| C| |D|0008 | C|49998|0026244 DRAWING DATA=5808332 |53711| C| |D|0009 | C|49998|0035660 DRAWING DATA=5808332 |53711| C| |D|0010 | C|49998|0033914 DRAWING DATA=5808332 |53711| C| |D|0011 | C|49998|0047575 DRAWING DATA=5808332 |53711| C| |D|0012 | C|49998|0044347 DRAWING DATA=5808332 |53711| C| |D|0013 | C|49998|0038165 DRAWING DATA=5808332 |53711| C| |D|0014 | C|49998|0043852 DRAWING DATA=5808332 |53711| C| |D|0015 | C|49998|0051377 DRAWING DATA=5808332 |53711| C| |D|0016 | C|49998|0037147 DRAWING DATA=5808332 |53711| C| |D|0017 | C|49998|0033205 DRAWING DATA=5808332 |53711| C| |D|0018 | C|49998|0036052 DRAWING DATA=5808332 |53711| C| |D|0019 | C|49998|0009659 DRAWING DATA=5808332 |53711| C| |D|0020 | C|49998|0012874 DRAWING DATA=5808332 |53711| C| |D|0021 | C|49998|0028488 DRAWING DATA=5808332 |53711| C| |D|0022 | C|49998|0013098 DOCUMENT REF DATA=PPP-C-96 | | |E |921231|A| | | DOCUMENT REF DATA=MIL-STD-129 | | |P |041029|A| |03| DOCUMENT REF DATA=FED-STD-313 | | |D |000321|A| |01| DOCUMENT REF DATA=PPP-P-704 | | |E |870220|A| 2| | DOCUMENT REF DATA=PPP-D-729 | | |E |831230|A| 1| | DOCUMENT REF DATA=ASTM-D845 | | |77 | |A| | | DOCUMENT REF DATA=ASTM-E1131 | | |93 | |A| | | DOCUMENT REF DATA=ASTM-E1252 | | |98 |981003|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |951103|A|2 | | DOCUMENT REF DATA=ASTM-D1141 | | | |900202|A| | | DOCUMENT REF DATA=ASTM-D1210 | | | |910219|A| | | DOCUMENT REF DATA=ASTM-D1475 | | | |901120|A| | | DOCUMENT REF DATA=ASTM-D185 | | | |900622|A| | | DOCUMENT REF DATA=ASTM-D1875 | | | |901130|A| | | DOCUMENT REF DATA=ASTM-D1974 | | | |940301|A| | | DOCUMENT REF DATA=ASTM-D2200 | | | |941003|A| | | DOCUMENT REF DATA=ASTM-D2240 | | | |920622|A| | | DOCUMENT REF DATA=ASTM-D2369 | | | |931215|A| | | DOCUMENT REF DATA=MIL-DTL-24441 | | |C |990519|A| | |1 |Y|38 |990104 DOCUMENT REF DATA=ASTM-D2698 | | | |910227|A| | | DOCUMENT REF DATA=ASTM-D304 | | | |900525|A| | | DOCUMENT REF DATA=ASTM-D3278 | | | |891229|A| | | DOCUMENT REF DATA=ASTM-D5118/D5118M | | | |940301|A| | | DOCUMENT REF DATA=ASTM-C633 | | | |830117|A| | | DOCUMENT REF DATA=MIL-HDBK-774 | | |A |040830|A| | | DOCUMENT REF DATA=ISO9001 | | | |010417|A| | | DOCUMENT REF DATA=MIL-STD-973 | | | |920417|A| | | 3. REQUIREMENTS 3.1 Design, Manufacture, and Performance - Except as modified herein, the ADHESIVE furnished under this contract/purchase order shall meet the design, manufacture, and performance requirements specified on drawing ;5808332,(DTNSRDC 2844-1102), EPOXY ADHESIVE FOR SPECIAL HULL TREATMENT; cage ;53711; . NOTE: 53711 Drawing 5808332 has been revised from Rev "B" to Rev "C". Please note the changes to Rev "C" listed in section 6 (NOTES) of this document. 3.2 ;Material to be supplied as a two (2) component kit consisting of one (1) 1 gallon can of epoxy part marked A (Component A) and one (1) 1 gallon can of polyamide part marked B (Componet B). The quantity of each component in a kit shall be furnished in the proportions as specified on the specification sheet of 53711 Drawing 5808332.; 3.3 ;Ingredients - The ingredients specified in the Specification Sheet of 53711 Drawing 5808332 are approved for use in the manufacture of this compound. The use of alternate ingredients in this formula must have prior approval by the Naval Sea Systems Command. Approval will be based on review of data showing equivalent physical and chemical characteristics to the specified ingredient. It will be necessary to dmonstrate that compound made using the ingredient will conform to all requirements of this specification.; 3.4 Marking - This item shall be physically identified in accordance with ; MIL-STD-129; . 3.5 ;Special Marking - In addition to other marking required on the containers, special marking is required in accordance with paragraph 5.3.1 through 5.3.1.2 of 53711 drawing 5808332.; 3.6 ;Shelf Life - Shelf Life shall be three (3) years from date of manufacture. The material will not be accepted by the Government if less than 85% of the shelf life is remaining at the time of shipment.; 3.7 Qualification Requirements - This item contains components that must be manufactured by a Government Qualified Products List (QPL) supplier. 3.8 ;Material Safety Data Sheet (MSDS) - Material safety data sheet shall be in accordance with the requirements of paragraph 3.7 of 53711 Drawing 5808332.; 3.9 ;Certification and Approval (Contractor)- Certification of Conformance and Approval is required.; 3.10 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required. 3.11 First Article Approval (Government Testing) - First Article Test (FAT) and approval is required. 3.12 ;Lot Acceptance Test Approval (Contractor Testing) - Lot Acceptance Test (LAT) and approval is required.; 3.13 ;Lot Acceptance Test Approval (Government Testing) - Government Lot Acceptance Test (LAT) and approval is required.; 3.14 Configuration Control - MIL-STD-973 entitled "Configuration Management", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973, Paragraph 5.4.8.2 and Appendix D. Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E. Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E. (Original and two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.) 3.14.1 Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until another drawing revision is approved. The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted, the date of the granting of the authorization, and the name of the granting authority. Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below. The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA 17055-0788. Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor. 3.15 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned. These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere. 4. QUALITY ASSURANCE 4.1 Inspection System Requirements - The supplier shall provide and maintain an inspection/quality system acceptable to the Government. The inspection system requirements for this contract/purchase order shall be in accordance with MIL-I-45208. Suppliers certified to perform under ISO 9001 or ISO 9002 are granted permission to utilize the one desired in lieu of MIL-I-45208. 4.2 Records of Inspection - (This requirement is not applicable to Government Purchase Orders) Records of all inspection work performed by the Contractor, as referenced elsewhere in this contract, shall be kept complete and available to the Government during the performance of the contract and for a period of four years after final delivery of supplies. 4.3 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.4 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.5 ;Certification of Conformance - The Contractor shall prepare and submit a Certification of Conformance in accordance with requirements of paragraph 4.5.2 of 53711 Drawing 5808332 and the Contract Data Requirements List (DD Form1423).; 4.6 ;Material Safety Data Sheet (MSDS) - The contractor shall prepare and submit material safety data sheets in accordance with the contract data requirements list (DD Form 1423).; 4.7 ;First Article Test/Inspection (Contractor) - The contractor shall conduct Destructive First Article Tests/Inspections on samples of sufficient size to permit the performance of all the tests and inspections as specified in paragraph 3.1,4.3 and TABLE 1 of 53711 Drawing 5808332.; 4.8 First Article Test/Inspection Report - The Contractor shall prepare and submit a report in accordance with the Contract Data Requirements List (DD Form 1423). The report shall be approved prior to production. 4.9 ;First Article Test/Inspection (Government) - The Contractor shall deliver samples in accordance with the requirements of paragraph 4.3.1 of 53711 Drawing 5808332 to the authorized Government Test Facility for Destructive First Article Test/Inspection in accordance with paragraph 4.3 of (53711) Drawing 5808332. Test samples that are consumed or destroyed in testing will not be returned to the contractor by the Government Test Facility. The Contractors First Article Test Report and Certification of Conformance shall be delivered to the Government Test Facility with the samples to be tested. The authorized Government Test Facility is: Naval Surface Warfare Center Carderock Division, Ships Systems Engineering Station (NSWCCD-SSES) Code 622, Philadelphia Naval Business Center, Philadelphia, Pa. 19112-5083. ; 4.10 ;Lot Acceptance Test (Contractor and Government Destructive) - The contractor shall conduct Lot Acceptance Test on samples of sufficient size to permit the performance of all test/inspections as specified in paragraph 4.4 and to the test marked with asterisks in table 1 of (53711) drawing 5808332. After successful completion of testing by the contractor, samples in accordance with the requirements of paragraph 4.4.3 of (53711) Drawing 5805332 shall be delivered to the authorize Government Test Facility for Government Lot Acceptance Testing. The contractor's Lot Acceptance Test report and Certification of Conformance shall be delivered to the Government Test Facility with the samples to be tested. Test samples that are consumed or destroyed in testing will not be returned to the Contractor by the Government Test Facility. The authorized Government Test Facility is: Naval Surface Warfare Center Carderock Division, Ships Systems Engineering Station (NSWCCD-SSES) Code 622, Philadelphia Naval Business Center, Philadelphia, Pa. 19112-5083. A new lot shall not be produced until the previous lot has passed productionlot test. ; 4.11 ;Lot Acceptance Test Report - The Contractor shall prepare and submit a report in accordance with the Contract Data Requirements List (DDForm 1423).; 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 ;Changes to 53711 Drawing 5808332 REV "C" 1. Page 6 para 4.1.2 line 3 and 4 delete: and method 1031 of FED-STD-141. 2. Page 6 para 4.2 (b) Change Quality Conformance Test to Lot Acceptance Test.

Source notice

More from United States Department of the Navy posted in May 2022

More lists