<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_navy/posts/107852857365437648" -->

---
title: 16--TRUNNION,DRAG BRACE (N0038322QH086) | Closed - MatchAwards
description: 16--TRUNNION,DRAG BRACE. United States Department of the Navy. Solicitation N0038322QH086. NAICS 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing. Deadline 2022-03-04. CONTACT INFORMATION|4|N722.18|B4P|215-697-2558|jose.f.montes@navy.mil| ITEM UNIQUE IDENTIFICATION AND...
canonical: https://matchawards.com/dept_of_the_navy/posts/107852857365437648
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: 16--TRUNNION,DRAG BRACE (N0038322QH086) | Closed
og:url: https://matchawards.com/dept_of_the_navy/posts/107852857365437648
og:description: 16--TRUNNION,DRAG BRACE. United States Department of the Navy. Solicitation N0038322QH086. NAICS 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing. Deadline 2022-03-04. CONTACT INFORMATION|4|N722.18|B4P|215-697-2558|jose.f.montes@navy.mil| ITEM UNIQUE IDENTIFICATION AND...
og:image: https://matchawards.com/system/accounts/avatars/000/000/085/original/a0262fe00d6c038b.png?1638992122
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# 16--TRUNNION,DRAG BRACE

Status

Closed (archived notice)

Agency

[United States Department of the Navy](/dept%5Fof%5Fthe%5Fnavy)

Office

PHILADELPHIA, USA

Notice type

Solicitation

Solicitation number

N0038322QH086

NAICS

[333999 - All Other Miscellaneous General Purpose Machinery Manufacturing](/groups/500)

PSC

1620 - AIRCRAFT LANDING GEAR COMPONENTS

Posted

2022-02-24

Deadline

2022-03-04

## Description

CONTACT INFORMATION|4|N722.18|B4P|215-697-2558|jose.f.montes@navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| FMS DELIVERY AND SHIPPING INSTRUCTIONS|3|||N52211.40 | WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Invoice and receiving Report Combo|Source|TBD|N00383|TBD|TBD| See Schedule|Source||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF DATA - BASIC (MAR 2014)|2||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2021)|13|336413|1250|||||||||||| INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (NOV 2021)|2||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| The purpose of this amendment is as follows: (1) Remove the following language from Page 3 of the solicitation "An offeror failing to provide the Past Performance Information Form or to assert that it has no relevant directly related or similar Past Performance will be considered ineligible for award." (2) Add the following language "A neutral rating will result if no (compliant) PPIF is received." (3) Offerors are required to either submit a revised quote/PPIF, or state in writing that they are standing by their existing quote by 2:00 PM (EST) on 4 March 2022\. All other terms and conditions remain unchanged. Spares Requirement The Government intends to award to the source whose proposal represents the best value to the Government. Offers will be evaluated according to the following factors: 1\. Compliance with the Solicitation Requirements: a. Demonstrating Government Source Approval prior to award. This award is limited to Government approved sources. Only approved sources will be evaluated for past performance. To be acceptable, an offeror must currently be a government approved procurement source. b. Demonstrating an unconditional offer to perform. A proposal that offers alternative terms or takes exceptions to a solicitation requirement will be considered "technically unacceptable." c. Offeror that receives award, except for the OEM/Prime, must pass First Article Testing (FAT)/Production Lot Testing (PLT). Refer to Scope, Quality Assurance Provisions (QAP) in TDP. If recently passed FAT/PLT please submit a waiver and approval letter(s). The PCO will evaluate the offerors' proposals against these requirements to determine whether the technical proposal is acceptable or unacceptable. An unacceptable offeror will not be further evaluated and will be removed from the competition. The Government will evaluate the offeror's past performance: a. Relevancy (past performance to determine its individual scope, complexity, and magnitude relative to the instant requirement.) b. Confidence (quality of the offeror's past performance.) The Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government. Offerors lacking relevant past performance history will receive a neutral rating for past performance. However, the proposal of an offeror with no relevant past performance history, while rated neutral in past performance, may not represent the most advantageous proposal to the Government and thus, maybe an unsuccessful proposal when compared to the p proposals of other offerors. The offerors must provide the information requested in the PAST PERFORMANCE INFORMATION FORM (PPIF) for past performance evaluation or affirmatively state that it possesses no relevant directly related or similar to past performance; Past Performance shall be no more than 5 contracts. Relevant past performance is performance under contracts or efforts (within the past three years) that is of similar scope, magnitude, and complexity to that which is described in the solicitation. The form is an attachment to the solicitation. An offeror failing to provide the past performance information or to assert that it has no relevant directly related or similar past performance will be considered ineligible for award. PAST PERFORMANCE INFORMATION FORM (PPIF) will be submitted with proposal, if PPIF is not available, contact Contracting Officer at jose.f.montesmontiel.civ@us.navy.mil for a copy. 3\. Cost and Pricing. The evaluation of proposals will consider the offerors non-price factors significantly more important than the offerors cost/price factor with an acceptable/unacceptable criterion. Cost and pricing will be evaluated on best value to the Government. The purpose of the price factor is to determine if the proposed price is fair and reasonable. In no event will the Government make an award against an offer that the Government does not find to be fair and reasonably priced." Suplemental Information for CLIN 0001: SHIP TO: BLUE WATER SHIPPING US INC ATTN: FDFLOGCOM 26 NORTHFIELD AVENUE EDISON, NJ., 08837 MARK FOR: DEFENCE FORCES LOGISTICS COMMANDVUOREKSENKATU 20 FIN 33850 TAMPERE FINLAND All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. Early and incremental deliveries accepted and preferred. 1\. SCOPE 1.1 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with McDonnell Douglas Aircraft (MDA) drawing number ( ;76301; ) , ;74A450802-1009; and all details and specifications referenced therein as supplemented by MDA, as of date of contract award. Incorporation of any supplemental changes to the configuration of the item must be approved by the contracting officer. Any successful offeror is required to demonstrate, at time of contract award, a bi-lateral agreement with MDA. A copy of the bilateral agreement must be received by contracting officer by the time of contract award. Contractors are requested to note the estimated date of award in the solicitation remarks under the schedule. If the copy of the bi-lateral agreement with MDA is not received as specified in the solicitation remarks under the schedule, then your offer will not be considered for the instant award. 1.2 The bilateral agreement with MDA shall provide for the following: 1.2.1 MDA Certification in accordance with the appropriate CDRL that the offeror has in its possession complete technical data representing the latest configuration including all engineering orders, changes in design, etc. and that such data are used in manufacture of the part, purchased under this contract. MDA review, disposition and certification of all Material Review Board actions, requests waivers and deviations and any requests for acceptance of material non-conformities. MDA review and approval of Process/Operation Sheets and MDA participation, performance, review and approval of First Article inspection, as detailed in Section C of this solicitation/contract. 1.2.2 Certification is required that all critical processes to include acquisition of forging/castings have been procured from MDA approved source(s) in accordance with the appropriate CDRL. 1.3 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, templates, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 Quality/Inspection Requirements 1.4.1 MIL-Q-9858A/AQAP-1 applies: Refer to contract Section E. 1.4.2 First Article/First Production Lot Inspection: Refer to contract Section C. 1.4.3 Mandatory Inspection applies: Refer to contract Section C. 1.5 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. MIL-W-22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.6 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with MIL-STD-2000A. Personnel performing tasks in accordance with MIL-STD-2000A shall be trained and certified as requried by MIL-STD-2000A paragraph 5.1.4\. 1.7 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995\. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.8 . The contractor shall include on the detailed process/operation sheets developed, (1) all in house manufacturing processes and (2) the identity of all manufacturing sources performing processes/operations outside their facility. These sheets shall not be revised or altered after the successful completion of First Article or Production Lot Testing without approval from the Basic Design Engineering activity, via the PCO. 1.9 . Markings shall be in accordance with MIL-STD-130, revision level "L" or latest revison, and IAW the drawing requirements. 1.10 . Unless otherwise specified, for fabricated parts, the Inspection Method Sheets/ Final Inspection Sheets shall list the characteristics of each item produced under the contract. The manufacturer shall be required to provide certifications of all raw material including castings and forgings. the material source shall be identified and the documentation shall be able to identify the customer and/or contract number. The manufacturer shall maintain all raw material documentation for a minimum of ten (10) years. The contractor is responsible for providing completed Inspection Method Sheets/Final Inspection Sheets showing the actual dimensions taken for ALL Characteristics,in addition, critical characteristics shall be annotated. 2\. APPLICABLE DOCUMENTS DRAWING DATA=74A450802-1009 |76301|^^| |A| | | | 3\. REQUIREMENTS - NOT APPLICABLE 4\. QUALITY ASSURANCE 4.1 During production mandatory inspection is required to be accomplished by the contractor as follows: 4.1.1 Verification that the first piece of each lot run on a machine for a specific part will be checked to 100% dimensions of print. Every sixth piece thereafter shall be checked 100% to print. 4.1.2 All final Inspection Method Sheets (IMS) shall be validated by a government authorized inspector for all sub components and final assembly. This is to be accomplished by random sampling of characteristics. 4.1.3 In cases where functional testing is required, the U.S. Government authorized Inspector shall validate 100% of the final functional tests reports performed to MCAIR acceptance test procedures for FSCM/CAGE ( ;76301; ), part number, ;74A450802-1009; , in accordance with Acceptance Test Plan ;N/A; . 4.1.4 Material verification - the U.S. Government authorized inspector shall verify that the material certification is in accordance with the appropriate drawing. 4.1.5 Verification via random inspection of surface finish. 4.2 The material produced under contract shall be accepted by the cognizant U.S. Government Inspector/CAO/QAR contingent upon the successful completion of these requirements. First Article Testing shall consist of two parts. Part I shall be conducted at the successful offeror's facilities with McDonnell Douglas Aircraft (MDA) and U.S. Government personnel in attendance to witness testing. Part II will be conducted at MDA facility with the successful offeror and U.S. Government personnel in attendance. 4.3 FIRST ARTICLE TESTING REQUIREMENTS PART I (to be performed at the successful offeror's facility) A. The contractor shall perform detailed dimensional inspection of the first piece using the digital data provided by MDA. This data will be used to inspect the first piece with results being compared to results of an inspection of the model provided by MDA using the same testing facilities and equipment. All testing shall be witnessed by U.S. Government personnel, as well as MDA personnel. The PCO shall be provided notification not later than 30 days prior to date that the First Article is scheduled to insure proper U.S. Government personnel availability. B. Compliance with drawing ( ;76301; ) , ;74A450802-1009; latest revision and specifications referenced therein. C. Function - in accordance with MDA Acceptance Test Procedures where applicable per MDA supplied data package D. Dimensional check of detailed parts prior to assembly to include forging prior to machining E. Review of documentation as provided under CDRL (DD1423) requirements. F. Review of the following documentation: Process/Operation Sheets Critical Process Certification Completed Inspection Method Documents Material Certifications: Documentation certifying that the material used in manufacture of the items is in accordance with the applicable drawing and material specification including test results. Forging: Documentation certifying that only the MDA approved sources were used for critical processes including forging/casting(s) for the item and that all test/inspections required in the material specification were complied with, including test reports. G. MDA review of First Article and certification in accordance with the applicable CDRL is required. 4.4 . FIRST ARTICLE TESTING REQUIREMENTS PART II (To be conducted at MDA facilities) A. The contractor shall provide for the first article piece to be inspected by MDA personnel at MDA facilities in order to verify and correlate test results using the digital data provided by MDA. This testing shall be witnessed by U.S. Government personnel. B. Certification/report of findings shall be provided by MDA in accordance with CDRL. 4.5 . PRODUCTION LOT TESTING A. The production lot sample(s) shall be selected at random by the cognizant Government inspector (DCMAO/QAR). The samples shall be identified by contract number, lot number and be clearly marked as follows: PRODUCTION LOT TEST SAMPLES NOT RFI MATERIAL DO NOT TAKE UP IN STOCK B. Such samples shall be tested in sufficient time prior to the delivery date of the production articles to allow a 60 day period for testing and written notification by the contracting officer of the approval or disapproval of the samples. Within 45 days of the receipt of the samples, the CAO shall notify the contracting officer, Naval Inventory Control Point, ATTN: (See Block 10.a. of SF33 for name and code) of the results of the testing, together with a recommendation for approval or disapproval. C. In the event the contractor does not receive written notification of approval, conditional approval, or disapproval of the samples for a particular production lot within 60 days from their submission for such testing, the contract delivery schedule shall be equitably adjusted as necessary. D. If the contractor fails to deliver any production lot samples for testing within the time or times specified, or if the contracting officer disapproves any production lot samples, the contractor shall be deemed to have failed to make delivery within the meaning of the Default Clause of this contract, and this contract shall be subject to termination for default. E. In order for a production lot to be acceptable, all samples representative of the lot must pass all of the contract requirements. In the event a sample fails to pass such requirements, the lot will be rejected. In such event, the Government may, at its option and at no additional cost to the Government, (I) terminate all or any portion of this contract for default, (II) require the manufacture of a new production lot, or a rework of the rejected production lot if the means and procedures proposed by the contractor for rework are acceptable to the Government, or (III) require the submission of additional samples for test. The foregoing procedures shall apply to new or reworked production lots in the same way as they did to the original production lot. F. For each additional sample or each resubmission of a modified sample which the contractor is required to submit for approval hereunder as a result of the failure of a previous sample to conform to the requirements of the specifications, the contractor shall pay to the Government the 

<!-- mobian-agent-ad sponsored="true" id="84e5b78b-4437-4e4c-94e8-ec572da3cbd4" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


[Source notice](https://sam.gov/opp/1d903d25fab046aea0160202ea8f768b/view)

[More from United States Department of the Navy posted in February 2022](/dept%5Fof%5Fthe%5Fnavy/archive/2022-02)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"16--TRUNNION,DRAG BRACE","description":"CONTACT INFORMATION|4|N722.18|B4P|215-697-2558|jose.f.montes@navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| FMS DELIVERY AND SHIPPING INSTRUCTIONS|3|||N52211.40 | WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Invoice and receiving Report Combo|Source|TBD|N00383|TBD|TBD| See Schedule|Source||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF DATA - BASIC (MAR 2014)|2||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2021)|13|336413|1250|||||||||||| INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (NOV 2021)|2||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| The purpose of this amendment is as follows: (1) Remove the following language from Page 3 of the solicitation \"An offeror failing to provide the Past Performance Information Form or to assert that it has no relevant directly related or similar Past Performance will be considered ineligible for award.\" (2) Add the following language \"A neutral rating will result if no (compliant) PPIF is received.\" (3) Offerors are required to either submit a revised quote/PPIF, or state in writing that they are standing by their existing quote by 2:00 PM (EST) on 4 March 2022. All other terms and conditions remain unchanged. Spares Requirement The Government intends to award to the source whose proposal represents the best value to the Government. Offers will be evaluated according to the following factors: 1. Compliance with the Solicitation Requirements: a. Demonstrating Government Source Approval prior to award. This award is limited to Government approved sources. Only approved sources will be evaluated for past performance. To be acceptable, an offeror must currently be a government approved procurement source. b. Demonstrating an unconditional offer to perform. A proposal that offers alternative terms or takes exceptions to a solicitation requirement will be considered \"technically unacceptable.\" c. Offeror that receives award, except for the OEM/Prime, must pass First Article Testing (FAT)/Production Lot Testing (PLT). Refer to Scope, Quality Assurance Provisions (QAP) in TDP. If recently passed FAT/PLT please submit a waiver and approval letter(s). The PCO will evaluate the offerors' proposals against these requirements to determine whether the technical proposal is acceptable or unacceptable. An unacceptable offeror will not be further evaluated and will be removed from the competition. The Government will evaluate the offeror's past performance: a. Relevancy (past performance to determine its individual scope, complexity, and magnitude relative to the instant requirement.) b. Confidence (quality of the offeror's past performance.) The Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government. Offerors lacking relevant past performance history will receive a neutral rating for past performance. However, the proposal of an offeror with no relevant past performance history, while rated neutral in past performance, may not represent the most advantageous proposal to the Government and thus, maybe an unsuccessful proposal when compared to the p proposals of other offerors. The offerors must provide the information requested in the PAST PERFORMANCE INFORMATION FORM (PPIF) for past performance evaluation or affirmatively state that it possesses no relevant directly related or similar to past performance; Past Performance shall be no more than 5 contracts. Relevant past performance is performance under contracts or efforts (within the past three years) that is of similar scope, magnitude, and complexity to that which is described in the solicitation. The form is an attachment to the solicitation. An offeror failing to provide the past performance information or to assert that it has no relevant directly related or similar past performance will be considered ineligible for award. PAST PERFORMANCE INFORMATION FORM (PPIF) will be submitted with proposal, if PPIF is not available, contact Contracting Officer at jose.f.montesmontiel.civ@us.navy.mil...","url":"https://matchawards.com/dept_of_the_navy/posts/107852857365437648","identifier":"N0038322QH086","category":"333999 - All Other Miscellaneous General Purpose Machinery Manufacturing","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"1620 - AIRCRAFT LANDING GEAR COMPONENTS"}],"availabilityStarts":"2022-02-24","availabilityEnds":"2022-03-04","sameAs":"https://sam.gov/opp/1d903d25fab046aea0160202ea8f768b/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Manufacturing","item":"https://matchawards.com/contracts/manufacturing"}]}
```

