Amendment 0005 Answer RFIs & Update Solicitation
- Status
- Closed (archived notice)
- Agency
- United States Department of the Navy
- Office
- WASHINGTON NAVY YARD, USA
- Notice type
- Solicitation
- Solicitation number
- N4008022R1007
- NAICS
- 238220 - Plumbing, Heating, and Air-Conditioning Contractors
- PSC
- Z2AZ - REPAIR OR ALTERATION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
- Category
- Facility Related Services (4.4)
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Posted
- 2022-01-27
- Deadline
- 2022-02-02
- Place of performance
- Quantico, 22134
Description
Amendment 0005 is issued to provide (1) Answers to RFIs received; (2) Update Box 11 and 12b of Section 00 10 00 of the Solicitation. **************************************************************************** Amendment 0004 is issued to extend the proposal due date and add a requirement for the bid bond as stated in Section 00 21 13- Instructions to Bidders, Paragraph B. 3)Tab 2 and in FAR Clause 52.228-1 of the RFP. ***************************************************************************** Amendment 0003 is issued to provide (1) Answers to RFIs received; (2) Update Proposal Due Date ***************************************************************************** Amendment 0002 is issued to provide updated Wage Determination, Answers RFIs, add Attachments F & G, and Extending Proposal Due Date. **************************************************************************** Amendment 0001 Issued to provide a corrected Attachment E. ****************************************************************************** The general scope of this project is to provide all labor, material, equipment, transportation and supervision necessary to repair the HVAC systems at Bldg. 2032 aboard MCB Quantico, VA. The contractor shall perform all work as necessary to complete the contract in a satisfactory and acceptable manner; and adhere to all applicable federal, state and local regulations. Work shall include the following, but not limited to: Provide heating, cooling and ventilation rates, heating and cooling load calculations and systems per the latest UFC requirements. Provide new HVAC equipment units for in-kind replacements. Upgrade zoning efficiency by consolidating existing ductwork to meet new equipment manufacturers specifications and load calculation requirements. Provide new wall thermostat(s). Boiler(s) plant MBH output shall be upgraded to accommodate new system configuration and meet equipment manufacturer specifications. Provide vibration isolators/absorbers for new HVAC equipment.Contacts
- TABITHAN PARKS
- Maria P Caceres
Email and phone are in the source notice.
More from United States Department of the Navy posted in January 2022