ClickCease 48--VALVE,BALL, IN REPAIR/MODIFICATION OF (N0010421QFB51) | Closed - MatchAwards

48--VALVE,BALL, IN REPAIR/MODIFICATION OF

Status
Closed (archived notice)
Agency
United States Department of the Navy
Office
MECHANICSBURG, USA
Notice type
Solicitation
Solicitation number
N0010421QFB51
NAICS
332919 - Other Metal Valve and Pipe Fitting Manufacturing
PSC
4820 - VALVES, NONPOWERED
Category
Machinery & Components (5.1)
Posted
2021-08-09
Deadline
2021-08-06

Description

CONTACT INFORMATION|4|N743.45|WVW|717-605-3353|sylvia.sentz@navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specification sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION/ACCEPTANCE POINT|6|x||x|||| TIME OF DELIVERY (JUNE 1997)|20|0001|2|318|||||||||||||||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Stand-Alone Receiving Report - Certifications Combo-Receiving Report & Invoice - Material |n/a|tbd|N00104|tbd|N39040 - Certifications, S4306A - Material|N50286|tbd|133.2|n/a|n/a|S4306A - Material|n/a|n/a|See dd 1423|PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery|one year from date of delivery||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|332919|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| EVALUATION CRITERIA AND BASIS FOR AWARD-|1|| The purpose of this amendment is to add the following remark: This repair effort is issued pursuant to Special Emergency Procurement Authority. This amendment is issued to add the following remark: The sucessful offeror must become at least provisionally qualified perNAVSEAINST 4855.34C. 1. Data Item A001 (inspection and Test Plan) may be waived if already on fileat NAVSUP WSS Mech. 2. Drawings associated with this solicitation will be made available on the new beta.SAM website but will be restricted access, which needs to be approved.Once access has been requested, interested vendors should email the POC listedon the solicitation to inform them of the request. 3. NAVSUP WSS Mech will be considering past performance in the evaluation ofoffers. See Clause 252.213-7000. 4. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders, and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either depositedin the mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to "issue" contractual documents asdetailed here in. 5. The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS 6 working days after receipt (290 actual days to manufacture part) Final delivery of material (318 days) Delivery days and past performance will be evaluation factors in determining awardee. 6. This requirement requires access to confidential drawings. These drawings are not required to provide a quotation for the RFQ/RFP. However, in the eventof an award, a facility security clearance is/maybe required. 7. This contract utilizes Commercial Asset Visibility (CAV). See clause NAVSUPWSSFA24 for further details." \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.3 Specification Revisions - The specification revisions listed under "Docu ments References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.3.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. DRAWING DATA=255123 |43689| J| |D|0001 | J|49998|0237878 DRAWING DATA=255582 |43689| M| |D|0001 | M|49998|0127790 DRAWING DATA=255583 |43689| L| |D|0001 | L|49998|0365060 DRAWING DATA=255584 |43689| J| |D|0001 | J|49998|0383474 DRAWING DATA=255588 |43689| M| |D|0001 | M|49998|0402200 DRAWING DATA=255589 |43689| F| |D|0001 | F|49998|0189761 DRAWING DATA=255590 |43689| G| |D|0001 | G|49998|0418515 DRAWING DATA=256348 |43689| R| |D|0001 | R|49998|0310252 DRAWING DATA=4384678 |80064| C| |D|0001 | C|49998|1136401 DRAWING DATA=4456141 |80064| A| |X|0001 | A|00026|0000000 DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=QQ-N-281 | | |D |851023|A| 2| | DOCUMENT REF DATA=QQ-N-286 | | |G |001207|A| | | DOCUMENT REF DATA=ASTM-B367 | | | |130701|A| | | DOCUMENT REF DATA=ASTM-B369 | | | |090401|A| | | DOCUMENT REF DATA=ASTM-A494 | | |A |141001|A| | | DOCUMENT REF DATA=ASTM-B505 | | | |140401|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | | DOCUMENT REF DATA=ASTM-E1417 | | | |130601|A| | | DOCUMENT REF DATA=ASTM-E1444 | | | |160616|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=SAE AMS 2631 | | |E |171201|A| | | DOCUMENT REF DATA=ASTM-D4066 | | | |130701|A| | | DOCUMENT REF DATA=ASTM-D5363 | | | |160401|A| | | DOCUMENT REF DATA=SAE AMS 6931 | | |D |171201|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=MIL-DTL-15024 | | |G |180303|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-C-24723 | | | |890607|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=AIA/NAS NASM 25027 | | |1 |121221|A| | | DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | | |950801|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.0.1 INSPECTION - Clean and determine if refurbishment is possible. At disassembly, the Contractor must record all identifying markings found on the parts of each assembly. The Contractor must maintain traceability of these markingsto each unit throughout refurbishment. 3.0.2 IDENTIFYING MARKINGS - Part must have a MIC (Material Identification and Control) code, heat/heat lot code, or unique Contractor traceability number/code that is visible on the part. See Material Traceability in paragraph 3 (Quality Assurance Provisions) of this contract for traceability requirements. The MIC code can consist of a 2, 3, or 4 letter material identifier, 4 or 5 digit Julian date, 3 digit lot serial number, and Certifying Activity Designator (CAD) which will be 1 or 2 letters; the 4 parts are normally separated by hyphens; examples: TIA-3089-30-QQ and ST-06262-506-A. 3.0.3 RE-USEABLE PARTS - - Any parts of the original assembly that are useable (replacement is not necessary), that are properly marked as identified above, and that have material certifications available may be utilized as initially supplied. Certifications arenot required to be resubmitted by the contractor. - Any parts of the original assembly that are useable (replacement is not necessary), are properly marked as identified above, but material certifications arenot available at the contractor's facility, a waiver must be submitted in accordance with Waiver/Deviation (Configuration Control) requirements specified elsewhere in the Contract. 3.0.4 NON-USEABLE PARTS - -Any parts of the original assembly that are not properly marked as identifie d above must be replaced and the required certifications must be submitted. - Any parts of the original assembly that are not usable (replacement is necessary) must be replaced and the required certifications must be submitted. 3.0.5 REFURBISHMENT - Upon completion of inspection, this item must be refurbished to be in accordance with ;Newport News drawing 256348, Assembly "RCT" and MS NO. 3420-081-021 REV E CHG-2 CSD197, less manual operators; , except as amplified or modified herein. This applies to all "Parts Requiring Certification" as identified elsewhere in this Contract/Purchase Order. 3.0.6 Additional SOW Requirements - ;N/A; 3.1 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Body, piece 1 on drawing 256348; Material - MIL-C-24723, alloy M30C (with the applicable requirements of ASTM-A494) or ASTM-B369, UNS C96400. Part - ;Cover, Access (suction), piece 2 on drawing 256348.; Material - ;ASTM-B369, Alloy C96400; Part - ;Stems, pieces 8 and 9 on drawing 256348; Material - ;QQ-N-286, form 2, annealed (hot finished or cold drawn) and age hardened; Part - ;Stem Retaining Nut, piece 10 and 11 on drawing 256348.; Material - ;ASTM-B505, Alloy C90300; Part - ;Stud, piece 22 on drawing 256348; Material - ;MIL-DTL-1222, Type IV, Grade 500 (QQ-N-286) Annealed and Age Hardened and marked .K.; Part - ;Retainer, Seal, piece 16 on drawing 256348; Material - ;QQ-N-281, Class A; Part - ;Nut, Self-Locking, piece 25 on drawing 256348; Material - ;QQ-N-281, Class A or B QQ-N-281, Class A or B and meeting the mechanical properties of note 9 of drawing 256348; Part - ;Ball, piece 4 and 40 on drawing 256348; Material - SAE-AMS-6931 OR Centrifugally cast 6AL-4V, ASTM-B367, Grade C-5, with mechanical properties as listed in supplementary Requirement S6. Note: Mechanical properties for bars, forgings and forging stock over 10" must be as specified in the applicable drawing. If the mechanical properties are not provided in the drawing, the mechanical properties specified in SAE-AMS-6931 Table 2 for material 6" to 10", must be applied. Part - ;Seat - (Q3), pieces 6 and 7 on drawing 256348; Material - MD71-GG Mearthane (Graphite Filled Urethane). Material must be manufactured by Mearthane Products Inc. Cranston, RI. (Properties Specified Below Only) ITEM PROPERTY ASTM TEST METHOD VALUE (A) Hardness D2240 70 +/- 5 Shore D (B) Specific Gravity D792 1.18 +/- 0.02 (C) Tensile Strength D412 (DIEC) 5000 PSI MIN (D) Compression-Defl D575 700 PSI MIN @ 2% DEF. (E) Tensile Impact D1822 300 FT-LB/SQ IN (Note 1) (TYPE L SPECIMEN) (F) Water Absorption D570 1.5% MAX (1 Week at R.T.) Note 1: These values are minimum averages. Separate specimen values may not vary more than 25% under the specified minimum. 3.2 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below. Test - ;Ultrasonic Inspection; Item - ;Ball, Piece 4 and 40 on drawing 256348 (when made from SAE AMS 6931); Performance - ;In accordance with SAE AMS 6931 and AMS 2631; Acceptance - ;In Accordance With AMS 2631; Test - Weldability Test of ASTM-B369 material Item - ;Body, Piece 1 and Cover,access (suction), Piece 2 on Drawing 256348 (NOTE: Only required if Body, Piece 1 or cover, assess (suction, Piece 2 is made of ASTM-B369) Performance - ASTM-B369 Acceptance - ASTM-B369 Test - Weldability Test of MIL-C-24723 material Item - ;Body, Piece 1 on drawing 256348 (NOTE: only required for Body, Piece 1, if material is MIL-C- 24723 Performance - ASTM-A494 Acceptance - ASTM-A494 Test - ;Liquid Penetrant Inspection; Item - ;Stud, Piece 22 on drawing 256348; Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222 Acceptance - MIL-DTL-1222 Test - ;Dye Penetrant Inspection for Non-Magnetic Grades; Item - ;Nut, Self-locking, Piece 25 on Drawing 256348; Performance - T9074-AS-GIB-010/271 or ASTM-E1417/ASTM-E1444 (Method C solvent removal techniques must not be used on thread) Acceptance - ;NASM25027; Test - Quality Conformance Tests Item - Self-Locking Nuts Performance - ;NASM25027; Acceptance - ;NASM25027; Attribute - Certificate of Completion Item - Self-Locking Nut Nonmetallic Insert Performance - ASTM-D4066, Group 01, Class 1 or 2, Grade 1 Attribute - Certificate of Compliance Item - Self-Locking Nuts Performance - This Certificate must state that self-locking nuts were manufactured by an approved source. Approved sources are those listed on QPL-25027 for the appropriate fastener. This QPL may also be considered as approved sources for Heavy Hex self-locking nuts. Attribute - Annealing and Age Hardening Item - ;Studs, Piece 22 on drawing 256384 and Stems, pieces 8 and 9 on drawing 256348; Performance - QQ-N-286 Test - ;Pressure and Operational Tests; Item - ;Each Assembly; Performance - ;MS NO. 3420-081-021 steps 1.u ad 1.v; Acceptance - ;MS NO. 3420-081-021 steps 1.u ad 1.v; 3.3 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG/-0PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of thesmallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. 30 minutes / - 0 minutes. above 2500 PSIG, the pressure tolerance must be +2%/-0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be + 60 minutes/- 0 minutes. 3.4 A visual inspection shall be performed on the finished seat with acceptance criteria on critical surfaces per CSD167 in the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/. 3.5 Ball Spherical Surface Waviness - Unless otherwise specified on drawing, all sealing area surfaces must have a spherical surface waviness which does not exceed 0.0005 inches of height per inch of spherical surface. Roughness and waviness ratings must apply in a direction which yields the maximum rating, normally perpendicular to the lay. 3.6 ;Surface waviness must be verified prior to Teflon coating; 3.7 ; Ball outside diameter may be reworked to a minimum of 5.112" for hull valve and 5.861" for backup valve to refurbish the ball surface to meet drawing requirements and represents a relaxation below the drawing dimension. All other dimensions apply.; 3.8 Dupont Teflon Coating 850G-204 and 852G-201. Use of Dupont Teflon Coating 851N-204 and 852N-201 is acceptable until exhausted - Teflon coating of ball(s) must be in accordance with general note ;4F; of drawing ;4384678; . 3.9 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD099; in ECDS at https://register.nslc.navy.mil/ 3.9.1 CSD099 provides guidance for acceptance/rejection of teflon-coated valve balls after valve assembly production testing. 3.10 Seat Stack Height Measurement - To ensure that each seat is within tolerance, check each seat singularly by measuring the seat height over the ball. This measurement is calculated by adding one-half ball diameter to the half stack height dimension on the drawing. Limits are determined by the ball diameter tolerance and the half stack height tolerance. Check dimensions by measuring from the seat back face to top of ball. Manufacturers of seats that do not have a ball of the required size available will be required to manufacture a dummy ball or segment of a ball with sufficient spherical surface to check the above dimension. 3.11 ; Seats are to be manufactured and must meet the drawing stack height requirements when mated with the refurbished ball. All non metallic parts must be newly manufactured.; 3.12 Radiography is required on ;the Body, piece 1 and Cover, Access (suction) piece 2 on drawing 25634; . 3.13 Specification Change - For QQ-N-281, Class B material: 1 - Footnote 9 to Table II of QQ-N-281 does not apply. 2 - When starting material is Round Bar greater than 3" dia, the mechanical properties of Hex Bar apply. 3.14 K-MONEL Fasteners - Material must be heat treated per QQ-N-286. 3.14.1 Fasteners that have been hot or cold headed or roll threaded must be solution annealed followed by age hardening subsequent to all heading and thread rolling operations. The mechanical properties on certifications must be actual properties of the annealed and age hardened material and must meet the requirements of QQ-N-286. 3.14.2 QQ-N-286 fasteners that have been headed and/or roll threaded must not beage hardened unless the material has been solution annealed subsequent to the heading and threading operations. Threads formed after the final age hardening heat treatment must be cut or ground only. 3.15 K-MONEL Fasteners - K-MONEL externally threaded fasteners must have mechanical properties determined in accordance with MIL-DTL-1222. Test results must include Tensile, Yield, Elongation and Hardness as required by MIL-DTL-1222. (The Hardness tests must be performed on a full size fastener.) 3.15.1 Studs require an Axial Tensile test in accordance with MIL-DTL-1222. 3.15.2 Headed fasteners require a Wedge Tensile test as specified elsewhere in this contract/purchase order. 3.16 Nylon Plug Dimensions - Dimensions for plug, ;Piece 10 on Drawing 256348; to be 1/8 inch diameter and 3/32 inch long +1/64 / -0. Note: The plug m

Attachments

Source notice

More from United States Department of the Navy posted in August 2021

More lists