<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_navy/posts/106703408340265025" -->

---
title: Cooperative Engagement Capability (CEC) Alteration Installation… | Closed - MatchAwards
description: Cooperative Engagement Capability (CEC) Alteration Installation Team (AIT). United States Department of the Navy. Solicitation N6339421R0504. NAICS 336611 - Ship Building and Repairing. Total small business set-aside. Deadline 2021-08-09. Naval Surface Warfare Center Port Hueneme Division (NSWC...
canonical: https://matchawards.com/dept_of_the_navy/posts/106703408340265025
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Cooperative Engagement Capability (CEC) Alteration Installation… | Closed
og:url: https://matchawards.com/dept_of_the_navy/posts/106703408340265025
og:description: Cooperative Engagement Capability (CEC) Alteration Installation Team (AIT). United States Department of the Navy. Solicitation N6339421R0504. NAICS 336611 - Ship Building and Repairing. Total small business set-aside. Deadline 2021-08-09. Naval Surface Warfare Center Port Hueneme Division (NSWC...
og:image: https://matchawards.com/system/accounts/avatars/000/000/085/original/a0262fe00d6c038b.png?1638992122
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Cooperative Engagement Capability (CEC) Alteration Installation Team (AIT)

Status

Closed (archived notice)

Agency

[United States Department of the Navy](/dept%5Fof%5Fthe%5Fnavy)

Office

PORT HUENEME, USA

Notice type

Solicitation

Solicitation number

N6339421R0504

NAICS

[336611 - Ship Building and Repairing](/groups/565)

PSC

N019 - INSTALLATION OF EQUIPMENT- SHIPS, SMALL CRAFT, PONTOONS, AND FLOATING DOCKS

Set-aside

[Total Small Business Set-Aside (FAR 19.5)](/contracts/small-business)

Posted

2021-08-05

Deadline

2021-08-09

Place of performance

Port Hueneme CBC Base, 93043

## Description

Naval Surface Warfare Center Port Hueneme Division (NSWC PHD) issues a solicitation to provide engineering and technical support services for Alteration Installation Team (AIT). This procurement provides services to the Air Dominance Department (A-Dept.). These services include installation, modification, logistics and upgrade for various Cooperative engagement Capability systems of NSWC PHD. NSWC PHD is a field activity of Naval Sea Systems Command (NAVSEA). NSWC PHD A-Dept. is the In-Service Engineering Agent (ISEA) for the Cooperative Engagement Capability (CEC). The Contractor shall include installation task planning & coordination, procurement of installation material & prefabrication, installation execution, reporting, and closeout. The Contractor shall also include material tracking, inventory management, packing, crating, and handling for shipments and receipt transactions, material shipping, material disposal, inventory database updates, routine inventories, and procurement of incidental materials. The primary work location will be at NSWC PHD in Port Hueneme, California. Based on the market research results, the Government has determined that this requirement will be solicited under the provisions of FAR Subpart 19.5 Small Business Total Set-Aside under NAICS 336611, pursuant to the policies and procedures of FAR Part 15 Contract by Negotiation. The activity small business office concurs with the set aside determination. AMENDMENT 0001: The purpose of this amendment is to (1) add the first conformed and modification copies of the RFP in response to the question and answer's from contractors as follows: QUESTION #1: Contractor respectfully requests the following SIDs and LAR.  Page 118 RE: USG-2B Backfit Installations SIDs  Page 119 RE: USG-2B Fleet Intro Installations SIDs  Page 119/120 RE: AECU to ECSC Back Fit Installations SIDs  Page 120 RE: CET Equipment & Cabling Installations  LAR Answer: Any DoD contractor can make this same request for documents and have them provided. QUESTION #2: Contractor respectfully requests the following information: 1\. WDs for Norfolk and Newport News, VA; Mayport, FL; Bremerton, WA; and Pascagoula, MS 2\. SIDs for: a. USG-2B Back Fit Installations b. USG-2B Fleet Intro Installations c. AECU to ECSC Back Fit Installations 3\. LAR for CET Equipment & Cabling Installations 4\. The following NSWC PHD-specific documents: a. NSWC PHD Instruction 9090.3 (Series), Alteration Installation Team Quality Management System Procedures (current version) b. NSWC PHD 488402-2-006 (Series), NSWC PHD PAAA Antenna Alignment Verification (current version) c. NSWC PHD 48402-2-009 (Series), NSWC PHD Fiber Optical Transmission Line (current version) d. NSWC PHD 48402-2-010 (Series), NSWC PHD Coaxial Transmission Line (current version) e. NSWC PHD 48402-3-005 (Series), NSWC PHD ECSC PAO FILL (current version) ANSWER: Any DoD contractor can make this same request for documents and have them provided. QUESTION 3: Are overtime hours to be included in the Cost Proposal? If yes, how should the overtime man-hours be calculated? ANSWER: No, however bidders can include overtime hours if they choose. QUESTION 4: CDRLs do not appear to be completed since there are notes attached from Michael D. Thompson with recommendations and/or requested corrections. Please advise. ANSWER: This version was added in error. The correct version is now uploaded. QUESTION 5: Some of the CLINs 2001 through 2007 are identified as Option which we believe is incorrect. Please advise. ANSWER: All CLINs are appropriately marked. QUESTION 6: CLINs 2103 and 2107 both are titled CET Cabling Kit. Is it possible to make these into one CLIN with a total of 14 units required? ANSWER: No, they are meant to be separate options. QUESTION 7: Units of kits dont track between the tables in Section L and CLINs for AECU to ECSC Back Fit (no units in the Base year CLINs, 1 less unit in the CLINs than the table for OY1; between the two years, there should be a total of 13 units per the table, but the CLINs have only 11). ANSWER: Below is the correct number of purposed installation per year. In section L AECU to ECSC Back Fit Table there is an error for OY1 it should be 11 purposed installation. The San Diego area should only have two vice three purposed installations for OY1\. Base year  0 purposed installations OY1  11 purposed Installations OY2  12 purposed Installations OY3  15 purposed Installations OY4  8 purposed Installations QUESTION 8: Section L, page 121, paragraph xi  does the Government anticipate six or seven BOMs? ANSWER: 7 BOMs USG-2 - 2B Kit Procurement USG-2B Fleet Intro Kit Procurement ECSC Back-Fit Kit CET Cabling Kit Cable Build and Test Cable Repair and Test CaaS Material Procurement QUESTION 9: On Required Staff Plan\_LOE tab of Attachment JS-8: Unable to locate labor rate for SCA Occupation Code 99100 for the Fire Watch. Located in the SCA DIRECTORY OF OCCUPATIONS but not in the wage determinations. ANSWER: The BLS Percentile section in the JS-8 has the labor rate range we are projecting. AMENDMENT 0002 Q&A QUESTION #1: Paragraph 1.2, on page 110 is silent on the quantity of resumes required for each Key Personnel proposed. How many resumes does the government require for each Key Personnel proposed? Answer: Project Coordinator/Manager - 1 Resume Quality Control Manager - 1 Resume Task Leader - 4 Resumes Electronics Technician Maintenance III - 3 Resumes Welder - 3 Resumes Pipefitter, Maintenance - 3 Resumes QUESTION #2: CET Equipment and Cabling Installations LAR. We received SIDs, not LAR. The solicitation Amendment 0001 Section viii, directly below CET Equipment & Cabling Table states: Offeror shall request LAR from Government for CET Equipment & Cabling Installations. LAR will be provide for all seventy-seven installations due to all others being very similar in scope. Is there a LAR for CET Installs, or do the provided SIDs replace the LAR? Answer: This SID replaces the LAR and the SID the official governing document that shall be used for this estimate. 410-8848733 CEC CET Installation Drawing for DDG takes the place of the LAR. For estimating purposes use this drawing that was provided and estimate one installation per CET. Use DDG 80 Sheet 4 of this drawing for estimating all seventy-seven CET installations. This will be the maximum cable run for the CET installations. All the GFM (5 items) on sheet 14 of the SID will be changed to IAF and will need to be included in your BOM. QUESTION #3: Cable Repair and Test. There is no reference to GFI (SIDs or LAR) in the solicitation. Please provide the technical data which is required to develop the BOM for this item. There is some reference to general cable (fiber, power, copper data) types and quantity in Section C but not specific enough to develop BOM. Answer: See attachment Cable Repair and Test QUESTION #4: Cable Build and Test. There is no reference to GFI (SIDs or LAR) in the solicitation. Please provide the technical data which is required to develop the BOM for this item. There is some reference to general cable (fiber, power, copper data) types and quantity in Section C but not specific enough to develop BOM. Answer: See attachment Build, Connect and Test Cables QUESTION #5: There is an error in paragraph 6.11 it reads as follows: 6.11 The contractor shall repair and test so that they are compliant with general specification NAVSEA S9AA0-AB-GOS-010/030, applicable Standard Items, NSWC PHD 48402-2-009 and NSWC PHD 48402-2-010 on ship thirty cables (4 power, 10 copper data and 10 fiber). Contractor shall have their own test equipment to perform this testing. If cable can not be repaired then contractor shall pull new cable. Data cables are for IFF/C&D/SPY/SPQ-B/SPS-48/NAV/SSDS/PAAA Antenna. It should read: 6.11 The contractor shall repair and test so that they are compliant with general specification NAVSEA S9AA0-AB-GOS-010/030, applicable Standard Items, NSWC PHD 48402-2-009 and NSWC PHD 48402-2-010 on ship thirty cables (5 power, 10 copper data and 15 fiber). Contractor shall have their own test equipment to perform this testing. If cable can not be repaired then contractor shall pull new cable. Data cables are for IFF/C&D/SPY/SPQ-B/SPS-48/NAV/SSDS/PAAA Antenna. QUESTION #6:T he proposal due date in Block 9 of the conformed RFP SF Form states 19 July 2021\. Has the due date changed? This Due date was in error. The Due date has now been extended 09 Aug 2021\. QUESTION #7:410-8848733 CEC Installation Drawing for DDG, Sheet 15, List of Materials contains (5) line items each of which is marked GFM for CET Equipment and Cabling Installations. Should all material identified as GFM in the GFI, be included in each of the (7) BOMs and priced? Answer: All the GFM (5 items) on sheet 14 of the SID will be changed to IAF and will need to be included in your BOM. QUESTION #8: CDRL A023, Condition Deficiency Report (CDR) states that  shall be submitted upon receipt of deficient ship installation drawing (SID) found during installation. Is a CDR developed in circumstances other than deficiencies identified with SIDs? If so, could this be the same as the Condition Found Report (CFR) from the JFFM? Answer: CDR are going to most-likely be SID related finding with deficiencies in the SIDs. You could have an instance where you ask for more guidance/clarification in a CDR and also ask to use mechanical fitting vice brazing fittings. QUESTION #9: Attachment JS-8, Tab Non-Key Personnel Staffing Plan: Is this Table to be submitted in addition to Attachment J-3? Answer: Yes. QUESTION #10: A resume is required for a Lead Welder but no man-hours are provided in Attachment J-8\. There is a Welder LCAT that is wage determined; the rate is insufficient for a Lead Welder which is a working supervisory position. Answer: It is not a separate labor category. The requirement is to have a welder that is a senior/most experience. The contractor is free to propose a reasonable rate. QUESTION #11: If the Offeror does not agree with Government on the non-exempt labor category conformance to the WD (e.g., Laborer/Helper conformed to 23470), may the Offeror change it (e.g., Maintenance Trades Helper, 23580). \[The question is asked since we have learned that minimum compensation rarely provides hard-working, punctual, and reliable (not calling out oftenespecially right after payday) employees.\] Answer: The contractor is free to propose a reasonable rate. QUESTION #12: What is the function of the labor category Marine Chemist? Answer: This is a person that has certification to certify the space is free of any gasses and is ready for hot work. QUESTION #13: What is the function of the labor category Platform Manager? Answer: This is an experienced person that has worked on various platforms such as SSDS, AEGIS and SDTS. QUESTION #14: SOW 5.4: Is the contractor required to accomplish the CAD work to convert redlined drawings into SIDs to be used for the installation? If so, must the offeror add the Drafter/CAD Operator I, II, II, IV, or V? Answer: It is anticipated that the Platform Manager/Project Coordinator/Electronics Technician to be able to develop incidental drawing/minor changes to drawings on an AD HOC basics. QUESTION #15: 410-8848733 CEC Installation Drawing for DDG, Sheet 15, List of Materials contains (5) line items each of which is marked GFM for CET Equipment and Cabling Installations. Should all material identified as GFM in the GFI, be included in each of the (7) BOMs and priced? Answer: All the GFM (5 items) on sheet 14 of the SID will be changed to IAF and will need to be included in your BOM. QUESTION #16: CDRL A023, Condition Deficiency Report (CDR) states that  shall be submitted upon receipt of deficient ship installation drawing (SID) found during installation. Is a CDR developed in circumstances other than deficiencies identified with SIDs? If so, could this be the same as the Condition Found Report (CFR) from the JFFM? Answer: CDR are going to most-likely be SID related finding with deficiencies in the SIDs. You could have an instance where you ask for more guidance/clarification in a CDR and also ask to use mechanical fitting vice brazing fittings. QUESTION #17: # 6 below references a LAR, yet the file that was sent was 410-8848733 CEC CET Installation Drawing for DDG and does not seem to incorporate the LAR, at least that we can see? Answer: 410-8848733 CEC CET Installation Drawing for DDG takes the place of the LAR. For estimating purposes use this drawing that was provided and estimate one installation per CET. Use DDG 80 Sheet 4 of this drawing for estimating all the CET installations. QUESTION #18: Statement of Work, Page 32, Paragraph 6.2 it states, Contractor shall provide all necessary material identified in the SID package as IAF and all consumable materials related to the installation. In Section L, page 121, paragraph ix. it states that The Offeror shall propose the material cost plug numbers for the SHIPALT kits (IAF) needed to complete each installation. Is the Government intending to provide offerors with applicable SIDs for each type of install so that offerors can estimate the costs of each type of kit to be included in Section B? If not, how are offerors intended to estimate the costs of installation kits without knowing what is entailed in each type of install? Answer: SOW, Page 34, Paragraph 7.2 is states Contractor shall request SIDs from the Contracting Officer. Tables on pages 118, 119, 120 and 121 Offeror shall request SIDs from Government for USG-2B Fleet Intro Installations. Only one set of SIDs will be provide for all installations due to all other being very similar in scope. QUESTION #19: Statement of Work, Page 32, Paragraph 5.4 states Contractor shall assist NSWC PHD in the SID development and approval process This would make the assumption that the SIDs are not complete and therefore a list of materials for each IAF is not available? Please confirm. Answer: All SIDs that are provided to Offeror will be final. What this paragraph is requesting is for contractor to assist NSWC PHD in the development effort to draft, review and get approval of SIDs by the planning yards. This is additional SIDs on and above what SIDs will be provided. QUESTION #20: Section B, Pages 4-15, 2001-2407 requires offerors to provide a unit price for each kit. Is the price proposed by offerors a fixed unit price? Please clarify what is meant by Estimate Cost as a proposed total? Answer: This is a cost contract with estimated costs. The contractor can propose the costs they project. QUESTION #21: Attachment J-8, Required Staffing Plan provides labor category descriptions. Please confirm the description Piping, Flush, Clean and Testing should be the labor category Pipefitter Maintenance for proposal purposes. Answer: Yes, this is the correct category. QUESTION #22: Attachment J-8, Required Staffing Plan provides the hours by labor category for each contract year. Can the Government provide the standard hours for each labor category? Based on the calculation of taking the category hours divided by a standard man-year, it seems that there are either portions of a man year or overtime required to support this effort. Can the Government confirm if overtime is required? Answer: The contractor is tasked to find standard hours for their proposal. It is up to the contractor if they believe overtime is required. QUESTION #23: Attachment J-8, Required Staffing Plan provides the Governments estimated hours by labor category. Would the Government accept alternate proposals from offerors for less or more hours and still be considered acceptable? In addition, Section L Page 114, Section 4.0, 2nd paragraph notes "The Government estimated annual hours and costs are provided for proposal and planning purposes. Answer: The Contactor can propose what they believe is necessary to complete the contract tasks. QUESTION #24: Section F, Pages 65-72 - The schedule lists the CLIN and delivery date but does not provide a period of performance for each contract year. Can the government update Schedule F to show the dates of each period of performance? Answer: Section G has the dates of period of performance for each CLIN. QUESTION #25: Section G, Page 82 G-242-H002 Hours of Operation and Holiday Schedule - Request the Government review and confirm the new federal holiday Juneteenth is to be added. Answer: Added Juneteenth on the Holiday Schedule. QUESTION #26: Statement of Work, Page 30, Paragraph 4.2.6 The contractors corrective action shall include: Is this sentence intended to read like this? If not, what is intended to be included at the end of this sentence? Answer: 4.2.6 The contractor shall take prompt action to correct conditions that have resulted, or could result, in data being submitted to the Government that is not in conformance with contractual requirements. The contractors corrective action shall include: 4.2.6.1 Review of existing records indicating the types and number of inspections made, the types and number of deficiencies found, items of data rejected, the corrective actions taken, and the quantities of data items approved. 4.2.6.2 Review and revise, where necessary, existing procedures for conducting follow-up actions to monitor the effectiveness of corrective actions and to prevent the recurrence of discrepancies. QUESTION #27: Section L, Page 108, Paragraph d.i.14  The last sentence An approved purchasing system means a contractors purchasing system that has been reviewed and approved in accordance with FAR P request the remaining part of the sentence be completed. Answer: The sentence finishes with FAR Part 44.3 QUESTION #28: Section L, Page 113 4.0 FACTOR 4: Price/Cost Proposal, Paragraph a.- Please confirm if the Schedule of Total Estimated Price is also the Cost Summary Format. Answer: Confirmed. QUESTION #29: Section L, Page 115, iii, 3rd Paragraph, 4th line: ..shall propose a clause or use the one provided to be incorporated into the resulting contract which enforces the rate cap. Request the Government provide the clause for the indirect rate cap. Answer: FAR Part 52.216-15 QUESTION #30: Section L, Page115 Pre-Award Survey of Prospective Contractor Accounting System: Please confirm if a contractor has an approved accounting system that the completion of a pre award survey is not required. Answer: That is correct. QUESTION #31: Section L, Page 117, (i), Last Sentence: agreement shall be made which would in costs paid by the United States under this contract. Please clarify what would in costs mean? Answer: The sentence now reads as follows: agreement shall be made which would in costs paid by the United States under this contract. QUESTION #32: Section L, Page 118, USG-2B Back Fit Installations and Locations per FY: Offeror shall request SIDs from Government for USG-2B Back Fit Installations Only. Please clarify when this will be provided and to whom the request is to be addressed. Answer: Offeror shall request SIDs from Government for USG-2B Back Fit Installations Only one set of SIDs will be provide for all five installations due to all others being very similar in scope. Request needs to come from Offeror to Contracting Officer as stated in answer to question one. QUESTION #33: Section L, Page 121, Paragraph xi, A SHIPALT kit bill of materials (BOM) shall be provided in Excel format in the format specified in Attachment JS-8. Please confirm where in JS-8 this list is to be provided. Answer: This was in error. Please, provide by creating a new tab in the JS-8 entitled Materials. QUESTION #34: Section M, Page 126, Paragraph c. The Government will also evaluate the degree to which the proposed labor hours demonstrator the Offerors understanding of the requirement Will the Government allow offerors to provide a different mix of labor categories and hours then what is listed in JS-8 Cost Summary Format? Answer: 

<!-- mobian-agent-ad sponsored="true" id="88b00c6d-0993-4b8f-8340-6a3a272c0474" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ef95bd6fc6af460ebbd92beef6bb93df/download)
* [Attachment 2](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/25f562f1d3d7456da21c19f3a02f2d34/download)
* [Attachment 3](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/27e6491319b9457ca6e23d69a88e4ebe/download)
* [Attachment 4](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3f21d9b81dc740d9a30bdefc95ae5802/download)
* [Attachment 5](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b112b3d580f24ff897938df1151d3952/download)
* [Attachment 6](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0787de56d52848008b438bed1fe073b2/download)
* [Attachment 7](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/08e9149de2b64ea9b96486e0f6072156/download)
* [Attachment 8](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fbbd1870d5dd45c8b4303f55485ced16/download)
* [Attachment 9](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b4ec0bfd4f3c4be687a859083b014981/download)
* [Attachment 10](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0ecd3427f398472fba76502a2e3b6bc1/download)
* [Attachment 11](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9fc057a32b42457ab96d7b0f0615cd60/download)
* [Attachment 12](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bcf592cf76b040c88d9ce87a29945ffa/download)
* [Attachment 13](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5568701981db46ce8ec4f5e981e9a4c9/download)
* [Attachment 14](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f6446887788341c18e4f26d3e9987ee5/download)
* [Attachment 15](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e59041065ca1429c96d5257b53ee313c/download)
* [Attachment 16](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b3c5f7286205458cad5ef637acee46e8/download)
* [Attachment 17](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8a5613c5b6ce47119dc8f1f0ee8ff821/download)
* [Attachment 18](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e44c11b509524f02ad3020ceb619385b/download)
* [Attachment 19](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d152abbd91844cd7911f4825c2854846/download)
* [Attachment 20](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8f33bdd9ba304656ad3a5a1aa8cde3b2/download)
* [Attachment 21](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9ae9dcb96f6c42d6abbad912e2a67124/download)

## Contacts

* Shane Schmidt
* Michael W. Kennedy

Email and phone are in the source notice.

[Source notice](https://sam.gov/opp/eeafd4d2f74c4cf8927537beb9174cc2/view)

[More from United States Department of the Navy posted in August 2021](/dept%5Fof%5Fthe%5Fnavy/archive/2021-08)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Small Business Set-Aside Government Contracts Available Now](/contracts/small-business)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Cooperative Engagement Capability (CEC) Alteration Installation Team (AIT)","description":"Naval Surface Warfare Center Port Hueneme Division (NSWC PHD) issues a solicitation to provide engineering and technical support services for Alteration Installation Team (AIT). This procurement provides services to the Air Dominance Department (A-Dept.). These services include installation, modification, logistics and upgrade for various Cooperative engagement Capability systems of NSWC PHD. NSWC PHD is a field activity of Naval Sea Systems Command (NAVSEA). NSWC PHD A-Dept. is the In-Service Engineering Agent (ISEA) for the Cooperative Engagement Capability (CEC). The Contractor shall include installation task planning \u0026 coordination, procurement of installation material \u0026 prefabrication, installation execution, reporting, and closeout. The Contractor shall also include material tracking, inventory management, packing, crating, and handling for shipments and receipt transactions, material shipping, material disposal, inventory database updates, routine inventories, and procurement of incidental materials. The primary work location will be at NSWC PHD in Port Hueneme, California. Based on the market research results, the Government has determined that this requirement will be solicited under the provisions of FAR Subpart 19.5 Small Business Total Set-Aside under NAICS 336611, pursuant to the policies and procedures of FAR Part 15 Contract by Negotiation. The activity small business office concurs with the set aside determination. AMENDMENT 0001: The purpose of this amendment is to (1) add the first conformed and modification copies of the RFP in response to the question and answer's from contractors as follows: QUESTION #1: Contractor respectfully requests the following SIDs and LAR.  Page 118 RE: USG-2B Backfit Installations SIDs  Page 119 RE: USG-2B Fleet Intro Installations SIDs  Page 119/120 RE: AECU to ECSC Back Fit Installations SIDs  Page 120 RE: CET Equipment \u0026 Cabling Installations  LAR Answer: Any DoD contractor can make this same request for documents and have them provided. QUESTION #2: Contractor respectfully requests the following information: 1. WDs for Norfolk and Newport News, VA; Mayport, FL; Bremerton, WA; and Pascagoula, MS 2. SIDs for: a. USG-2B Back Fit Installations b. USG-2B Fleet Intro Installations c. AECU to ECSC Back Fit Installations 3. LAR for CET Equipment \u0026 Cabling Installations 4. The following NSWC PHD-specific documents: a. NSWC PHD Instruction 9090.3 (Series), Alteration Installation Team Quality Management System Procedures (current version) b. NSWC PHD 488402-2-006 (Series), NSWC PHD PAAA Antenna Alignment Verification (current version) c. NSWC PHD 48402-2-009 (Series), NSWC PHD Fiber Optical Transmission Line (current version) d. NSWC PHD 48402-2-010 (Series), NSWC PHD Coaxial Transmission Line (current version) e. NSWC PHD 48402-3-005 (Series), NSWC PHD ECSC PAO FILL (current version) ANSWER: Any DoD contractor can make this same request for documents and have them provided. QUESTION 3: Are overtime hours to be included in the Cost Proposal? If yes, how should the overtime man-hours be calculated? ANSWER: No, however bidders can include overtime hours if they choose. QUESTION 4: CDRLs do not appear to be completed since there are notes attached from Michael D. Thompson with recommendations and/or requested corrections. Please advise. ANSWER: This version was added in error. The correct version is now uploaded. QUESTION 5: Some of the CLINs 2001 through 2007 are identified as Option which we believe is incorrect. Please advise. ANSWER: All CLINs are appropriately marked. QUESTION 6: CLINs 2103 and 2107 both are titled CET Cabling Kit. Is it possible to make these into one CLIN with a total of 14 units required? ANSWER: No, they are meant to be separate options. QUESTION 7: Units of kits dont track between the tables in Section L and CLINs for AECU to ECSC Back Fit (no units in the Base year CLINs, 1 less unit in the CLINs than the table for OY1; between the two years, there should be a total of 13 units per the table, but the CLINs have only 11). ANSWER: Below is the correct number of purposed installation per year. In section L AECU to ECSC Back Fit Table there is an error for OY1 it should be 11 purposed installation. The San Diego area should only have two vice three purposed installations for OY1. Base year  0 purposed installations OY1  11 purposed Installations OY2  12 purposed Installations OY3  15 purposed Installations OY4  8 purposed Installations QUESTION 8: Section L, page 121, paragraph xi  does the Government anticipate six or seven BOMs? ANSWER: 7 BOMs USG-2 - 2B Kit Procurement USG-2B Fleet Intro Kit Procurement ECSC Back-Fit Kit CET Cabling Kit Cable Build and Test Cable Repair and Test CaaS Material Procurement QUESTION 9: On Required Staff Plan_LOE tab of Attachment JS-8: Unable to locate labor rate for SCA Occupation Code 99100 for the Fire Watch. Located in the SCA DIRECTORY OF OCCUPATIONS but not in the wage...","url":"https://matchawards.com/dept_of_the_navy/posts/106703408340265025","identifier":"N6339421R0504","category":"336611 - Ship Building and Repairing","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"N019 - INSTALLATION OF EQUIPMENT- SHIPS, SMALL CRAFT, PONTOONS, AND FLOATING DOCKS"}],"availabilityStarts":"2021-08-05","availabilityEnds":"2021-08-09","areaServed":"Port Hueneme CBC Base, 93043","sameAs":"https://sam.gov/opp/eeafd4d2f74c4cf8927537beb9174cc2/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Small business","item":"https://matchawards.com/contracts/small-business"}]}
```

