ClickCease 59--STUFFING TUBE (N0010421RFB75) | Closed - MatchAwards

59--STUFFING TUBE

Status
Closed (archived notice)
Agency
United States Department of the Navy
Office
MECHANICSBURG, USA
Notice type
Solicitation
Solicitation number
N0010421RFB75
NAICS
333999 - All Other Miscellaneous General Purpose Machinery Manufacturing
PSC
5975 - ELECTRICAL HARDWARE AND SUPPLIES
Posted
2021-07-28
Deadline
2021-08-09

Description

ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specification section C| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| TIME OF DELIVERY (JUNE 1997)|20|0001AA|5000|400|0001AC|1|180 Days||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Material - Invoice & Receiving Report (COMBO) Certifications - Stand-Alone Receiving Report|Material - Inspection & Acceptance at SOURCE Certifications - Inspection at DESTINATION & Acceptance at OTHER |TBD|N00 104|TBD|Certifications - N39040; Material -S4306A|N50286|TBD|133.2|N/A|N/A|Certifications - N39040|N/A|N/A|See DD Form 1423|PORT_PTNH_WAWF_Notification@navy.mil| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (JUN 2020)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from the date of delivery |one year from the date of delivery ||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (JUN 2020)|4||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (FEB 2019)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|1|0001AA|7|180|the NAVSUP WSS POC for the contract (jill.sabol@navy.mil)|TBD|0001AA|120|x|| PROGRESS PAYMENTS (MAR 2020)(DEVIATION 2020-O0010)|4||||| AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)|2||| LIST OF SOLICITATION ATTACHMENTS|5|||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|332710|750|||||||||||| COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEVIATION 2018-O0015)(MAY 2018))|1|| INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (JAN 2004)|2||| TYPE OF CONTRACT (APR 1984)|1|firm fixed price| ALTERATIONS IN SOLICITATION (APR 1984)|3|||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| EVALUATION OF FIRST ARTICLE TESTING|3|||x| 52.209-13 Violation of Arms Control Treaties or Agreements-Certification is added to N0010421RFB75. Violation of Arms Control Treaties or Agreements-Certification (Feb 2021) (a) This provision does not apply to acquisitions at or below the simplified acquisition threshold or to acquisitions of commercial items as defined at FAR 2.101. (b) Certification. ?Offeror shall check either (1) or (2).? __(1) The Offeror certifies that- (i) It does not engage and has not engaged in any activity that contributed to or was a significant factor in the President's or Secretary of state's determination that a foreign country is in violation of its obligations undertaken in any arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. The determinations are described in the most recent unclassified annual report provided to Congress pursuant to section 403 of the Arms Control and Disarmament Act (22 U.S.C. 2593a). The report is available at https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and-international l-security-affairs/bureau-of-arms-control-verification-and-compliance/; and (ii) No entity owned or controlled by the Offeror has engaged in any activity that contributed to or was a significant factor in the President's or Secretary of State's determination that a foreign country is in violation of its obligations undertaken in any arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. The determinations are d described in the most recent unclassified annual report provided to Congress pursuant to section 403 of the Arms Control and Disarmament Act (22 U.S.C. 2593a). The report is available at https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and d-international-security-affairs/bureau-of-arms-control-verification-and-compliance/; or __ (2) The Offeror is providing separate information with its offer in accordance with paragraph (d)(2) of this provision. (c) Procedures for reviewing the annual unclassified report (see paragraph (b)(1) of this provision). For clarity, references to the report in this section refer to the entirety of the annual unclassified report, including any separate reports that are incorporated by reference into the annual unclassified report, including any separate reports that are incorporated by reference into the annual unclassified report. (1) Check the table of contents of the annual unclassified report and the country section headings of the reports incorporated by reference to identify the foreign countries listed there. Determine whether the Offeror or any person owned or controlled by the Offeror may have engaged in any activity related to one or more of such foreign countries. (2) If there may have been such activity, review all findings in the report associated with those foreign countries to determine whether or not each such foreign country was determined to be in violation of its obligations undertaken in an arms control, nonproliferation, or disarmament agreement to which the United States is a party, or to be not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. For clarity, in the annual report an explicit certification of non-compliance is equivalent to a determination of violation. However, the following statements in the annual report are not equivalent to a determination of violation: (i) An inability to certify compliance. (ii) An inability to conclude compliance. (iii) A statement about compliance concerns. (3) If so, determine whether the Offeror or any person owned or controlled by the Offeror has engaged in any activity that contributed to or is a significant factor in the determination in the report that one or more of these foreign countries is in violation of its obligations undertaken in an arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. Review the narrative for any such findings reflecting a determination of violation or non-adherence related to those foreign countries in the report, including the finding itself, and to the extent necessary, the conduct giving rise to the compliance or adherence concerns, the analysis of compliance or adherence concerns, and efforts to resolve compliance or adherence concerns. (4) The Offeror may submit any questions with regard to this report by email to NDAA1290Cert@state.gov. To the extent feasible, the Department of State will respond to such email inquiries within 3 business days. (d) Do not submit an offer unless- (1) A certification is provided in paragraph (b)(1) of this provision and submitted with the offer; or (2) In accordance with paragraph (b)(2) of this provision, the Offeror provides with its offer information that the President of the United States has (i) Waived application under 22 U.S.C. 2593e(d) or (e); or (ii) Determined under 22 U.S.C. 2593e(g)(2) that the entity has ceased all activities for which measures were imposed under 22 U.S.C. 2593e(b). (e) Remedies. The certification in paragraph (b)(1) of this provision is a material representation of fact upon which reliance was placed when making award. If it is later determined that the Offeror knowingly submitted a false certification, in addition to other remedies available to the Government, such as suspension or debarment, the Contracting Officer may terminate any contract resulting from the false certification. (End of provision) There are no changes to the solicitation at this time. Closing date is extended due to a posting issue on SAM.gov. Clauses have been updated 1. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 2. Any contract/order awarded as a result of this solicitation will be a "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). See 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use. 3. DD 1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 4. Consistent with FAR 52.216-18, "All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 5. Available drawings and additional documents can be accessed through SAM.gov. 6. The complete RFP package must be signed and returned prior to the closing date. Email proposals to jill.l.sabol.civ@us.navy.mil. NECO quotes will NOT be accepted and will be determined non-responsive. Due to the max telework environment, please do not fax or snail mail proposals. 7. This procurement has First Article Test requirements. 8. The following delivery schedule will apply: Within 180 days after contract date AND within 30 days after the test completion, submit the test report to the PCO (currently jill.l.sabol.civ@us.navy.mil). The review shall be complete within 120 days from receipt. Submission of ALL other DD form 1423 certification data (CDRLs) will be on orbefore 20 days prior to delivery. PNSY review/acceptance of CDRLs shall be 6 working days after receipt of CDRLs. Final delivery of material will be on or before 400 days after theeffective date of the contract. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.2 ;TR-317B transducer elements and receptacle end seal assemblies necessary to conduct the tests required by TR-317 Hull Penetrator First Article and Quality Conformance Test Specifications must be supplied to the successful bidder. The successful bidder must contact the Naval Undersea Warfare Center Division Newport, RI, Transducer In-Service Engineering Agent NUWC_NPT_1535_TransducerISEA@navy.mil, (401) 832-4931 to obtain the required units. After completion of testing the successful bidder will forward the units to the receipt inspection activity.; 1.3 ;TR-317B transducer elements and receptacle end seal assemblies necessary to conduct the tests required by TR-317 Hull Penetrator First Article and Quality Conformance Test Specifications shall be supplied to the successful bidder. The successful bidder shall contact the Naval Undersea Warfare Center Division Newport, RI, Transducer In-Service Engineering Agent NUWC_NPT_1535_TransducerISEA@navy.mil, (401) 832-4931 to obtain the required units. After completion of testing the successful bidder will forward the units to the receipt inspection activity.; 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.3 Specification Revisions - The specification revisions listed under "Docu ments References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.3.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.3.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. DRAWING DATA=03411001 |88594| -| |D|0001 | -|49998|0172863 DRAWING DATA=03411001 |88594| A|DL |D|0001 | A|49998|0034504 DRAWING DATA=03411002 |88594| F| |D|0001 | |49998|0551091 DRAWING DATA=03411004 |88594| -| |D|0001 | -|49998|0112150 DRAWING DATA=03411005 |88594| -| |D|0001 | -|49998|0070342 DRAWING DATA=03411008 |88594| -| |D|0001 | -|49998|0054085 DRAWING DATA=03411009 |88594| A| |D|0001 | A|49998|0024810 DRAWING DATA=03411010 |88594| A| |D|0001 | A|49998|0026695 DRAWING DATA=03411011 |88594| -| |D|0001 | -|49998|0052217 DRAWING DATA=03411012 |88594| -| |D|0001 | -|49998|0048271 DRAWING DATA=03412001 |88594| -| |D|0001 | -|49998|0059657 DRAWING DATA=03412001 |88594| -|DL |D|0001 | -|49998|0441212 DRAWING DATA=03412003 |88594| -| |D|0001 | -|49998|0059560 DRAWING DATA=8192757 |53711| B|TS |D|0000.COV | B|49998|0079990 DRAWING DATA=8192757 |53711| B|TS |D|0001 | B|49998|0082446 DRAWING DATA=8192757 |53711| B|TS |D|0002 | B|49998|0080672 DRAWING DATA=8192757 |53711| B|TS |D|0003 | B|49998|0080697 DRAWING DATA=8192757 |53711| B|TS |D|0004 | B|49998|0080675 DRAWING DATA=8192757 |53711| B|TS |D|0005 | B|49998|0079861 DRAWING DATA=8192757 |53711| B|TS |D|0006 | B|49998|0080539 DRAWING DATA=8192757 |53711| B|TS |D|0007 | B|49998|0080385 DRAWING DATA=8192757 |53711| B|TS |D|0008 | B|49998|0080652 DRAWING DATA=8192757 |53711| B|TS |D|0009 | B|49998|0080471 DRAWING DATA=8192757 |53711| B|TS |D|0010 | B|49998|0105395 DRAWING DATA=8192757 |53711| B|TS |D|0011 | B|49998|0080821 DRAWING DATA=8192757 |53711| B|TS |D|0012 | B|49998|0080670 DRAWING DATA=8192757 |53711| B|TS |D|0013 | B|49998|0080882 DRAWING DATA=8192757 |53711| B|TS |D|0014 | B|49998|0080863 DRAWING DATA=8192757 |53711| B|TS |D|0015 | B|49998|0080906 DRAWING DATA=8192757 |53711| B|TS |D|0016 | B|49998|0080770 DRAWING DATA=8192757 |53711| B|TS |D|0017 | B|49998|0110761 DRAWING DATA=8192757 |53711| B|TS |D|0018 | B|49998|0085519 DRAWING DATA=8192757 |53711| B|TS |D|0019 | B|49998|0080949 DRAWING DATA=8192757 |53711| B|TS |D|0020 | B|49998|0085664 DRAWING DATA=8192757 |53711| B|TS |D|0021 | B|49998|0080790 DRAWING DATA=8192757 |53711| B|TS |D|0022 | B|49998|0080465 DRAWING DATA=8192757 |53711| B|TS |D|0023 | B|49998|0080674 DRAWING DATA=8192757 |53711| B|TS |D|0024 | B|49998|0108815 DRAWING DATA=8192757 |53711| B|TS |D|0025 | B|49998|0101461 DRAWING DATA=8192757 |53711| B|TS |D|0026 | B|49998|0080632 DRAWING DATA=8192757 |53711| B|TS |D|0027 | B|49998|0080359 DRAWING DATA=8192757 |53711| B|TS |D|0028 | B|49998|0094045 DRAWING DATA=8192757 |53711| B|TS |D|0029 | B|49998|0085804 DRAWING DATA=8192757 |53711| B|TS |D|0030 | B|49998|0080346 DRAWING DATA=8192757 |53711| B|TS |D|0031 | B|49998|0091717 DRAWING DATA=8192757 |53711| B|TS |D|0032 | B|49998|0090964 DRAWING DATA=8192757 |53711| B|TS |D|0033 | B|49998|0096753 DRAWING DATA=8192757 |53711| B|TS |D|0034 | B|49998|0100170 DRAWING DATA=8192757 |53711| B|TS |D|0035 | B|49998|0080892 DRAWING DATA=8192757 |53711| B|TS |D|0036 | B|49998|0080538 DOCUMENT REF DATA=FED-STD-H28 | | |B |940424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-B150 | | | |190401|A| | | DOCUMENT REF DATA=QQ-N-281 | | |D |851023|A| 2| | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-24231 | | |E |130426|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=A-A-59004 | | |B |181118|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | | |950801|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | DOCUMENT REF DATA=S9320-AM-PRO-020/MLDG | | |2 |990801|A| | | DOCUMENT REF DATA=S9320-AM-PRO-030/MLDG | | |3 |050201|A| | | 3. REQUIREMENTS 3.1 ;The complete TR-317B/BQ Hull Penetrator Assembly must be in accordance with Naval Underwater Systems Center Drawing 03411001 (less Find Number 2), Naval Sea Systems Command Drawing 8192757, except as amplified or modified herein.; 3.1.1 ;Note 6 on Drawing 03411001 must be changed to reflect drawing 8192757, TR-317 Hull Penetrator First Article and Quality Conformance Test Specifications.; 3.1.2 ;Drawing 03411002, Zone 4D should be changed to reflect a 125 RHR surface finish for the major outside diameter (1.623/1.619") in lieu of the 63 RHR finish.; 3.1.3 ;NOTE: Prior to application of the Rubber Mold, the surface finish of the Penetrator must be visually inspected. Evidence of adverse reaction between the neoprene primer and phenolic sealer is not acceptable.; 3.2 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required. 3.3 ;The First Article Test sample(s) must not be delivered against the contract quanitity.; 3.4 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Hull Penetrator Body, Find Number 1 on Drawing 03411002; Material - ;QQ-N-281, Class A, form 1 or Form 2 with a minimum yield strength of 40 KSI at .2% offset; Part - ;Hex Nut, on Drawing 03411009; Material - ;ASTM-B150, Alloy C63200, Temper TQ50; 3.5 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below. Test - Quality Conformance/Compliance Inspection Item - ;Hull Penetrator Assembly; Performance - ;Paragraph 3.4 and Table 1 of Naval Sea Systems Command Drawing 8192757; Acceptance - ;Paragraph 3.4 and Table 1 of Naval Sea Systems Command Drawing 8192757; 3.6 ;The requirement for hardness testing of molded

Source notice

More from United States Department of the Navy posted in July 2021

More lists