ClickCease 48--PARTS KIT,VALVE (N0010421QFC60) | Closed - MatchAwards

48--PARTS KIT,VALVE

Status
Closed (archived notice)
Agency
United States Department of the Navy
Office
MECHANICSBURG, USA
Notice type
Solicitation
Solicitation number
N0010421QFC60
NAICS
332919 - Other Metal Valve and Pipe Fitting Manufacturing
PSC
4820 - VALVES, NONPOWERED
Category
Machinery & Components (5.1)
Posted
2021-07-22
Deadline
2021-08-10

Description

CONTACT INFORMATION|4|N743.7|WVN|717-605-3875|jill.sabol@navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specification section C | INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| TIME OF DELIVERY (JUNE 1997)|20|0001AA|5|220|||||||||||||||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Material - Invoice & Receiving Report (COMBO) Certifications - Stand-Alone Receiving Report|Material - Inspection & Acceptance at SOURCE Certifications - Inspection at DESTINATION & Acceptance at OTHER |TBD|N00 104|TBD|Certifications - N39040; Material -S4306A |N50286|TBD|133.2|NA|NA|Certifications - N39040|NA|NA|See DD Form 1423|PORT_PTNH_WAWF_Notification@navy.mil| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from the date of delivery |one year from the date of delivery ||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)|2||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|332919|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| EVALUATION CRITERIA AND BASIS FOR AWARD-|1|| 1. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 2. Any contract/order awarded as a result of this solicitation will be a "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). See 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use. 3. DD 1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. See WSSTERMLZ02 for details. Quality Manuals shall be submitted to the NAVSUP WSS POC for this RFQ, currently Jill Sabol, at jill.sabol@navy.mil 4. Consistent with FAR 52.216-18, "All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 5. NAVSUP WSS Mech will be considering past performance in the evaluation of offers. See Clauses DFARS 252.213-7000 and WSSTERMMZ01. 6. Available drawings and additional documents can be accessed through SAM.gov. 7. Submission of ALL DD form 1423 certification data (CDRLs) will be on or before 20 days prior to the material (line item 0001AA) delivery date. PNSY review/acceptance of CDRLs shall be 6 working days after receipt of CDRLs. Final delivery of material will be on or before 220 days after the effective date of the order. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.1.1 LI-SOC ITEM - It has been determined that this item falls within both the Level I boundary and the Scope of Certification (SOC) boundary. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.3 Specification Revisions - The specification revisions listed under "Docu ments References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.3.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. DRAWING DATA=2640-801X1E1 |53711| A|ER |D|0001 | A|49998|6353077 DRAWING DATA=7285198 |53711| | |D|0001 | |49998|1247552 DRAWING DATA=7285297 |53711| E| |D|0001 | E|49998|0862180 DRAWING DATA=7285297 |53711| E| |D|0002 | E|49998|0392982 DRAWING DATA=7285297 |53711| E| |D|0003 | E|49998|0280881 DRAWING DATA=7285297 |53711| E| |D|0004 | E|49998|0204692 DRAWING DATA=7286650 |53711| A| |D|0001 | A|49998|0069575 DRAWING DATA=7286650 |53711| A| |D|0002 | A|49998|0049390 DRAWING DATA=7286650 |53711| A| |D|0003 | A|49998|0010138 DRAWING DATA=7286650 |53711| A| |D|0004 | A|49998|0012272 DRAWING DATA=7286650 |53711| A| |D|0005 | A|49998|0028995 DRAWING DATA=7286650 |53711| A| |D|0006.1 | A|49998|0059919 DRAWING DATA=7286650 |53711| A| |D|0006.2 | A|49998|0061259 DRAWING DATA=7286650 |53711| A| |D|0006.3 | A|49998|0060786 DRAWING DATA=7286650 |53711| A| |D|0006.4 | A|49998|0062725 DRAWING DATA=7286650 |53711| A| |D|0006.5 | A|49998|0019314 DRAWING DATA=7286650 |53711| A| |D|0006.6 | A|49998|0024236 DRAWING DATA=7286650 |53711| A| |D|0007.1 | A|49998|0029451 DRAWING DATA=7286650 |53711| A| |D|0007.2 | A|49998|0047234 DRAWING DATA=7286650 |53711| A| |D|0007.3 | A|49998|0039145 DRAWING DATA=7286650 |53711| A| |D|0007.4 | A|49998|0041373 DRAWING DATA=7286650 |53711| A| |D|0007.5 | A|49998|0030782 DRAWING DATA=7286650 |53711| A| |D|0007.6 | A|49998|0035521 DRAWING DATA=7286650 |53711| A| |D|0008.1 | A|49998|0040246 DRAWING DATA=7286650 |53711| A| |D|0009.1 | A|49998|0026292 DRAWING DATA=7286650 |53711| A| |D|0009.2 | A|49998|0032137 DRAWING DATA=7286650 |53711| A| |D|0009.3 | A|49998|0010142 DRAWING DATA=7286650 |53711| A| |D|0010 | A|49998|0043180 DRAWING DATA=7286650 |53711| A| |D|0011 | A|49998|0225667 DRAWING DATA=7286650 |53711| A| |D|0012 | A|49998|0106504 DRAWING DATA=7286650 |53711| A| |D|0013 | A|49998|0100453 DRAWING DATA=7286650 |53711| A| |D|0014 | A|49998|0154485 DRAWING DATA=7286650 |53711| A| |D|0015 | A|49998|0075800 DRAWING DATA=7286650 |53711| A| |D|0016 | A|49998|0098686 DRAWING DATA=7286650 |53711| A| |D|0017 | A|49998|0103785 DRAWING DATA=7286650 |53711| A| |D|0018 | A|49998|0063605 DRAWING DATA=7286650 |53711| A| |D|0019 | A|49998|0089960 DRAWING DATA=7286650 |53711| A| |D|0020 | A|49998|0095580 DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-B367 | | | |130701|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=SAE AMS 2631 | | |E |171201|A| | | DOCUMENT REF DATA=SAE AMS 6931 | | |D |171201|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | | |950801|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 ;Parts kit for size 4" inch Hull and Backup valve, consisting of one ball and two mating seats to be in accordance with NAVSEA drawing 7286650 (Ball) piece 18 and (Seats) piece 20 with details on NAVSEA drawing 7285198 piece 73 (Ball) and NAVSEA drawing 7285297 with ER2640-801X1E1 piece 15 (Seats), except as amplified or modified herein.; 3.1.1 ;The 3 o'clock keyway orientation in the stem slot of the valve ball applies to all 6-3/4 x 3-15/16 inch balls (Pieces 60, 61, 63, 64, 66, 67, 69, 71, 73, 83, 90, and 98) from NAVSEA drawing 7285198.; 3.1.2 ;The "H" dimension to locate the keyway pilot hole for all 6-3/4 x 3-15/16 inch balls (Pieces 60, 61, 63, 64, 66, 67, 69, 71, 73, 83, 90, and 98) from NAVSEA drawing 7285198 is .625 inches. Note: This does not correspond with the detail view of the valve ball where the "H" dimension is shown to be half the stem slot width; 3.2 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: For Boilerplate R00375, Part - ;Ball; Material - SAE-AMS-6931 OR Centrifugally cast 6AL-4V, ASTM-B367, Grade C-5, with mechanical properties as listed in supplementary Requirement S6. Note: Mechanical properties for bars, forgings and forging stock over 10" must be as specified in the applicable drawing. If the mechanical properties are not provided in the drawing, the mechanical properties specified in SAE-AMS-6931 Table 2 for material 6" to 10", must be applied. Part - ;Seats (Q3); Material - MD71-GG Mearthane (Graphite Filled Urethane). Material must be manufactured by Mearthane Products Inc. Cranston, RI. (Properties Specified Below Only) ITEM PROPERTY ASTM TEST METHOD VALUE (A) Hardness D2240 70 +/- 5 Shore D (B) Specific Gravity D792 1.18 +/- 0.02 (C) Tensile Strength D412 (DIEC) 5000 PSI MIN (D) Compression-Defl D575 700 PSI MIN @ 2% DEF. (E) Tensile Impact D1822 300 FT-LB/SQ IN (Note 1) (TYPE L SPECIMEN) (F) Water Absorption D570 1.5% MAX (1 Week at R.T.) Note 1: These values are minimum averages. Separate specimen values may not vary more than 25% under the specified minimum. 3.3 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below. Test - Hydrostatic Test Item - Each Ball Performance - 30 minutes at ;1050 PSI; with stem hole plugged Acceptance - No weeping, leakage, or permanent deformation. The following may be substituted by manufacturers who do not posess a hydrostatic test fixture: Test - Dye Penetrant Inspection Item - Each Ball Performance - T9074-AS-GIB-010/271 Acceptance - S9074-AR-GIB-010A/278 (Castings) / MIL-STD-2035 (Wrought) 3.4 Seat Stack Height Measurement - To ensure that each seat is within tolerance, check each seat singularly by measuring the seat height over the ball. This measurement is calculated by adding one-half ball diameter to the half stack height dimension on the drawing. Limits are determined by the ball diameter tolerance and the half stack height tolerance. Check dimensions by measuring from the seat back face to top of ball. Manufacturers of seats that do not have a ball of the required size available will be required to manufacture a dummy ball or segment of a ball with sufficient spherical surface to check the above dimension. 3.5 A visual inspection shall be performed on the finished seat with acceptance criteria on critical surfaces per CSD167 in the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/. 3.6 Dupont Teflon Coating 850G-204 and 852G-201. Use of Dupont Teflon Coating 851N-204 and 852N-201 is acceptable until exhausted - Teflon coating of ball(s) must be in accordance with general note ;5; of drawing ;7285198; . 3.7 ;Surface waviness must be verified prior to Teflon coating.; 3.8 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.8.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. 3.9 Welding or Brazing - When welding, brazing, and allied processes are required, they must be in accordance with S9074-AR-GIB-010A/278, (S9074-AQ-GIB-010/248 for brazing) by personnel and procedures qualified under S9074-AQ-GIB-010/248 for all production and repair welding and brazing. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.10 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.10.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.10.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic Contractor Data Submission) system at https://register.nslc.navy.mil/ 3.10.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.11 Mercury Free - Mercury and mercury containing compounds shall not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.12 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor shall prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.13 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested shall be furnished along with a copy of the test results. Certification shall include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments shall be identified to weld joint and layer. 3.14 Welding Requirements - When production or repair welding is required, the applicable welding procedure(s) and qualification data shall be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below shall be submitted as part of the certification OQE package submitted by the Contractor. Note: These requirements do not apply to tack/spot welds. 3.14.1 Approval of the Contractor's qualification data shall be obtained prior to performing any welding (production or repair). 3.14.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract shall be submitted at the same time. Welding procedures and qualification data shall be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor shall state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. "WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC." " WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ."). Authority for the repair of Special Repairs in castings and authority for the repair of wrought or forged material material shall be obtained from the Procurement Contracting Officer. This request shall describe the defect; including size, depth, location, and a description of the proposed repair. This request for NAVSUP-WSS Contracts shall be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.14.3 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 48 hour notification to DCMA with an offer to observe the welding of the test assemb

Source notice

More from United States Department of the Navy posted in July 2021

More lists