<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_navy/posts/106222111954776450" -->

---
title: 16--ADAPTER ASSEMBLY,MA (N0038321QH376) | Closed - MatchAwards
description: 16--ADAPTER ASSEMBLY,MA. United States Department of the Navy. Solicitation N0038321QH376. NAICS 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing. Deadline 2021-06-11. CONTACT INFORMATION|4|TBD|TBD|TBD|TBD| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR...
canonical: https://matchawards.com/dept_of_the_navy/posts/106222111954776450
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: 16--ADAPTER ASSEMBLY,MA (N0038321QH376) | Closed
og:url: https://matchawards.com/dept_of_the_navy/posts/106222111954776450
og:description: 16--ADAPTER ASSEMBLY,MA. United States Department of the Navy. Solicitation N0038321QH376. NAICS 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing. Deadline 2021-06-11. CONTACT INFORMATION|4|TBD|TBD|TBD|TBD| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR...
og:image: https://matchawards.com/system/accounts/avatars/000/000/085/original/a0262fe00d6c038b.png?1638992122
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# 16--ADAPTER ASSEMBLY,MA

Status

Closed (archived notice)

Agency

[United States Department of the Navy](/dept%5Fof%5Fthe%5Fnavy)

Office

PHILADELPHIA, USA

Notice type

Solicitation

Solicitation number

N0038321QH376

NAICS

[333999 - All Other Miscellaneous General Purpose Machinery Manufacturing](/groups/500)

PSC

1620 - AIRCRAFT LANDING GEAR COMPONENTS

Posted

2021-05-12

Deadline

2021-06-11

## Description

CONTACT INFORMATION|4|TBD|TBD|TBD|TBD| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|X||||||||||||X|||||||||||||| FMS DELIVERY AND SHIPPING INSTRUCTIONS|3|||N52211.42| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT COMBO TYPE|COMBO DOC SOURCE/SOURCE|TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS|60 DAYS AFTER DISCOVERY OF DEFECT||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|336413|1250|||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| EVALUATION CRITERIA AND BASIS FOR AWARD -|1|| THIS SOLICITATION IS FOR THE FURNISHING OF: NSN: 1620 012502691 PN: 74A410713-1007 QUANTITY: (15) EA PLEASE SUBMIT QUOTE VIA EMAIL TO STEFAN.D.SOOKOO@NAVY.MIL BY THE DUE DATE SPECIFIED ON PAGE 1, BLOCK 10\. THIS IS A LIMITED COMPETITIVE REQUIREMENT AND THE EVALUATION FACTOR IS LOWEST PRICE TECHNICALLY ACCEPTABLE THESE ITEMS REQUIRE GOVERNMENT SOURCE APPROVAL PRIOR TO AWARD. IF YOU ARE NOT AN APPROVED SOURCE, YOU MUST SUBMIT, TOGETHER WITH YOUR PROPOSAL, THE INFORMATION DETAILED IN THE NAVSUP WSS SOURCE APPROVAL BROCHURE WHICH CAN BE OBTAINED ONLINE AT https://www.navsup.navy.mil/public/navsup/wss/business\_opps/ UNDER "COMMODITIES." OFFERS RECEIVED WHICH FAIL TO PROVIDE ALL DATA REQUIRED BY THE SOURCE APPROVAL BROCHURE WILL NOT BE CONSIDERED FOR AWARD UNDER THIS SOLICITATION. PLEASE NOTE, IF EVALUATION OF A SOURCE APPROVAL REQUEST SUBMITTED HEREUNDER CANNOT BE PROCESSED IN TIME AND / OR APPROVAL REQUIREMENTS PRECLUDE THE ABILITY TO OBTAIN SUBJECT ITEMS IN TIME TO MEET GOVERNMENT REQUIREMENTS, AWARD OF REQUIREMENT MAY BE CONTINUED BASED ON FLEET SUPPORT NEEDS. \\ 1\. SCOPE 1.1 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995\. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.2 . The contractor shall include on the detailed process/operation sheets developed, (1) all in house manufacturing processes and (2) the identity of all manufacturing sources performing processes/operations outside their facility. These sheets shall not be revised or altered after the successful completion of First Article or Production Lot Testing without approval from the Basic Design Engineering activity, via the PCO. 1.3 . Unless otherwise specified, for fabricated parts, the Inspection Method Sheets/ Final Inspection Sheets shall list the characteristics of each item produced under the contract. The manufacturer shall be required to provide certifications of all raw material including castings and forgings. the material source shall be identified and the documentation shall be able to identify the customer and/or contract number. The manufacturer shall maintain all raw material documentation for a minimum of ten (10) years. The contractor is responsible for providing completed Inspection Method Sheets/Final Inspection Sheets showing the actual dimensions taken for ALL Characteristics,in addition, critical characteristics shall be annotated. 1.4 . Markings shall be in accordance with MIL-STD-130, revision level "L" or latest revison, and IAW the drawing requirements. 1.5 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with (76301) Boeing drawing number ( ;(76301); ) , ;74A410713-1007; and all details and specifications referenced therein as supplemented by Boeing.Any successful offeror is required to demonstrate, at time of contract award, a bi-lateral agreement with Boeing.A copy of the bilateral agreement must be received by the contracting officer by the time of contract award. Contractors are requested to note the estimated date of award in the solicitation remarks under the schedule. If the copy of the bi-lateral agreement with Boeig is not received as specified in the solicitation remarks under the schedule, then your offer will not be considered for the instant award. 1.6 The bilateral agreement with Boeing must provide for the following: 1.6.1 Boeing Certification in accordance with the appropriate CDRL that the offeror has in its possession complete technical data representing the latest configuration including all engineering orders, changes in design, etc. and that such data are used in manufacture of the part, purchased under this contract. Boeing review, disposition and certification of all Material Review Board actions, requests waivers and deviations and any requests for acceptance of material non-conformities. Boeing review and approval of Process/Operation Sheets and Boeing participation, performance, review and approval of First Article inspection, as detailed in Section C of this solicitation/contract. 1.6.2 Certification is required that all critical processes to include acquisition of forging/castings have been procured from MDA approved source(s) in accordance with the appropriate CDRL. 1.7 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, templates, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.8 Quality/Inspection Requirements 1.8.1 ;MIL-Q-9858A; applies: Refer to contract Section E. 1.8.2 First Article/First Production Lot Inspection: Refer to contract Section C. 1.8.3 Mandatory Inspection applies: Refer to contract Section C. 1.9 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. MIL-W-22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.10 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with MIL-STD-2000A. Personnel performing tasks in accordance with MIL-STD-2000A shall be trained and certified as requried by MIL-STD-2000A paragraph 5.1.4\. 2\. APPLICABLE DOCUMENTS - NOT APPLICABLE 3\. REQUIREMENTS - NOT APPLICABLE 4\. QUALITY ASSURANCE 4.1 During production mandatory inspection is required to be accomplished by the contractor as follows: 4.1.1 Verification that the first piece of each lot run on a machine for a specific part will be checked to 100% dimensions of print. Every sixth piece thereafter shall be checked 100% to print. 4.1.2 All final Inspection Method Sheets (IMS) shall be validated by a government authorized inspector for all sub components and final assembly. This is to be accomplished by random sampling of characteristics. 4.1.3 In cases where functional testing is required, the U.S. Government authorized Inspector shall validate 100% of the final functional tests reports performed to MCAIR acceptance test procedures for FSCM/CAGE ( ;76301; ), part number, ;74A410713-1007; , in accordance with Acceptance Test Plan ;N/A; . 4.1.4 Material verification - the U.S. Government authorized inspector shall verify that the material certification is in accordance with the appropriate drawing. 4.1.5 Verification via random inspection of surface finish. 4.2 The material produced under contract shall be accepted by the cognizant U.S. Government Inspector/CAO/QAR contingent upon the successful completion of these requirements. 4.3 FIRST ARTICLE TESTING REQUIREMENTS (To be performed at the successful offeror's facility) A. Compliance with drawing ( ;76301; ) , ;74A410713-1007; latest revision and specifications referenced therein. B. Function - In accordance with McDonnell Douglas Aircraft (MDA) Acceptance Test Procedures where applicable per MDA supplied data package. C. Dimensional check of detailed parts prior to assembly to include forging prior to machining D. Review of documentation as provided under CDRL (DD1423) requirements E. Review of the following documentation: Process/Operation sheets Critical Process Certification Completed Inspection Method documents Material certifications: Documentation certifying that the material used in manufacture of the items is in accordance with the applicable drawing and material specification including test results. Forging: Documentation certifying that only the MDA approved sources were used for critical processes including forging/casting(s) for the item and that all test/inspections required in the material specification were complied with, including test reports. F. MDA review of First Article and certification in accordance with the applicable CDRL is required. 4.4 PRODUCTION LOT TESTING A. The Production Lot Samples shall be selected at random by the cognizant government inspector. The samples shall be identified by contract number, lot number and be clearly marked as follows: PRODUCTION LOT TEST SAMPLES NOT RFI MATERIAL DO NOT TAKE UP IN STOCK B. Such samples shall be tested in sufficient time prior to the delivery date of the production articles to allow a sixty (60) day period for testing and written notification by the contracting officer of the approval, conditional approval, or disapproval of the samples. Within 45 days of the receipt of the samples, the CAO shall notify the contracting officer, Naval Inventory Control Point, ATTN: (See Block 10.a. of SF33 for name and code) of the results of the testing, together with a recommendation for approval, conditional approval or disapproval. C. In the event the contractor does not receive written notification of approval, conditional approval or disapproval of the samples for a particular production lot within 60 days from their submission for such testing, the contract delivery schedule shall be equitably adjusted as necessary. D. If the contractor fails to deliver any Production Lot Samples for testing within the time or times specified, or if the contracting officer disapproves any Production Lot Samples, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract, and this contract shall be subject to termination for default. E. In order for a Production Lot to be acceptable, all samples representative of the lot must pass all the contract requirements. In the event a sample fails to pass such requirements, the lot will be rejected. In such event, the government may, at its option and at no additional cost to the government, (I) terminate all or any portion of this contract for default, (II) require the manufacture of a new Production Lots, or a rework of the rejected Production Lot if the means and procedures proposed by the contractor for rework are acceptable to the government, or (III) require the submission of additional samples for test. The foregoing procedures shall apply to new or reworked production lots in the same way as they did to the original Production Lot. F. For each additional sample or each resubmission of a modified sample which the contractor is required to submit for approval hereunder as a result of a failure of a previous sample to conform to the requirements of the specification, the contractor shall pay to the government the costs of reinspection, examination and retesting and the contractor and his sureties (if any) shall be liable for the amount of such costs. G. All transportation charges incurred in the submission and return of any production lot sample shall be borne by the contractor. H. Nothing contained in the foregoing provisions of this clause, and no action of the government in accordance herewith, shall in any way prejudice the right of the government under the clasue of this contract entitled Default. I. One each sample from the first production lot shall be subjected to a 100% dimensional inspection at the contractor's facility, witnessed by U.S. Government and MDA personnel. J. The contractor shall perform detailed dimensional inspection of the production lot sample using the data provided by MDA. All testing shall be witnessed by U.S. Government personnel as well as MDA personnel. The PCO shall be provided notification NLT thirty (30) days prior to date Production Lot Testing is scheduled to insure proper U.S. Government personnel availability. K. Compliance with drawing ( ;76301; ), ;74A419713-1007; latest revision and specifications referenced therein. L. Function - In accordance with MDA Acceptance Test Procedures where applicable per MDA supplied data package M. Dimensional check of detailed parts prior to assembly to include forging prior to machining. N. Review of documentation as provide under CDRL (DD1423) requirements. O. Review of the following documentation: Process/Operation Sheets Critical Process Certification Completed Inspection Method Documents Material Certifications: Documentation certifying that the material used in manufacture of the items is in accordance with the applicable drawing and material specification including test results. Forging: Documentation certifying that only the MDA approved sources were used for critical processes including forging/casting(s) for the item and that all test/inspections required in the material specification were complied with, including test reports. P. MDA review of Production Lot and certification in accordance with the applicable CDRL is required. In addition to the above tests, the Production Lot Sample(s) to be delivered hereunder shall also be subjected to those tests which will demonstrate that the sample(s) comply with contract requirements. 4.5 TESTING LOCATION, COST AND ESTIMATED LEADTIME A. All testing is to be accomplished at the contractor's or MDA facilities as facilitated by the successful offeror's agreement with MDA. Cost of contractor testing to be borne by the successful offeror. The contractor shall deliver ;one(1); unit(s) of the following (76301) part number ;74A510713-1007; as specified in this contract ;400; DAC. B. Estimated cost for Government witnessing of Inspection/Test is $ ;$5,000.00; The contractor shall submit the First Article Test report within ;430; calendar days from the date of this contract. Forward copies of report in accordance with the Distribution cited on the DD1423\. Mark reports as follows:"FIRST ARTICLE TEST REPORT: Contract No. \_\_\_\_\_\_\_\_\_\_\_\_\_\_ Lot/item No. \_\_\_\_\_\_\_\_\_\_\_\_\_\_ " Within 30 calendar days after the contracting officer receives the test report, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval or disapproval of the First Article. The notice of conditional approval or approval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for the disapproval. C. If the First Article is disapproved, the contractor, upon government request, shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests. D. If the contractor fails to deliver any First Article report on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract. E. Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for acceptance. F. If the government does not act within the time specified in paragraph B above the contracting officer shall, u 

<!-- mobian-agent-ad sponsored="true" id="6c3df4bc-4eb7-4647-af11-83c876571d7f" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


[Source notice](https://sam.gov/opp/1404be5fbc1241cdbd89b980e48c221c/view)

[More from United States Department of the Navy posted in May 2021](/dept%5Fof%5Fthe%5Fnavy/archive/2021-05)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"16--ADAPTER ASSEMBLY,MA","description":"CONTACT INFORMATION|4|TBD|TBD|TBD|TBD| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|X||||||||||||X|||||||||||||| FMS DELIVERY AND SHIPPING INSTRUCTIONS|3|||N52211.42| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT COMBO TYPE|COMBO DOC SOURCE/SOURCE|TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS|60 DAYS AFTER DISCOVERY OF DEFECT||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|336413|1250|||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| EVALUATION CRITERIA AND BASIS FOR AWARD -|1|| THIS SOLICITATION IS FOR THE FURNISHING OF: NSN: 1620 012502691 PN: 74A410713-1007 QUANTITY: (15) EA PLEASE SUBMIT QUOTE VIA EMAIL TO STEFAN.D.SOOKOO@NAVY.MIL BY THE DUE DATE SPECIFIED ON PAGE 1, BLOCK 10. THIS IS A LIMITED COMPETITIVE REQUIREMENT AND THE EVALUATION FACTOR IS LOWEST PRICE TECHNICALLY ACCEPTABLE THESE ITEMS REQUIRE GOVERNMENT SOURCE APPROVAL PRIOR TO AWARD. IF YOU ARE NOT AN APPROVED SOURCE, YOU MUST SUBMIT, TOGETHER WITH YOUR PROPOSAL, THE INFORMATION DETAILED IN THE NAVSUP WSS SOURCE APPROVAL BROCHURE WHICH CAN BE OBTAINED ONLINE AT https://www.navsup.navy.mil/public/navsup/wss/business_opps/ UNDER \"COMMODITIES.\" OFFERS RECEIVED WHICH FAIL TO PROVIDE ALL DATA REQUIRED BY THE SOURCE APPROVAL BROCHURE WILL NOT BE CONSIDERED FOR AWARD UNDER THIS SOLICITATION. PLEASE NOTE, IF EVALUATION OF A SOURCE APPROVAL REQUEST SUBMITTED HEREUNDER CANNOT BE PROCESSED IN TIME AND / OR APPROVAL REQUIREMENTS PRECLUDE THE ABILITY TO OBTAIN SUBJECT ITEMS IN TIME TO MEET GOVERNMENT REQUIREMENTS, AWARD OF REQUIREMENT MAY BE CONTINUED BASED ON FLEET SUPPORT NEEDS. \\ 1. SCOPE 1.1 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of...","url":"https://matchawards.com/dept_of_the_navy/posts/106222111954776450","identifier":"N0038321QH376","category":"333999 - All Other Miscellaneous General Purpose Machinery Manufacturing","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"1620 - AIRCRAFT LANDING GEAR COMPONENTS"}],"availabilityStarts":"2021-05-12","availabilityEnds":"2021-06-11","sameAs":"https://sam.gov/opp/1404be5fbc1241cdbd89b980e48c221c/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Manufacturing","item":"https://matchawards.com/contracts/manufacturing"}]}
```

