Selma Alabama Flood Risk Management and Bank Stabilization Project
- Status
- Closed, the response deadline passed on Sep 2, 2026
- Agency
- United States Department of the Army
- Office
- MOBILE, USA
- Notice type
- Sources Sought
- Solicitation number
- W9127826RA105
- NAICS
- 237990 - Other Heavy and Civil Engineering Construction
- PSC
- Z2KZ - REPAIR OR ALTERATION OF OTHER CONSERVATION AND DEVELOPMENT FACILITIES
- Category
- Facility Related Services (4.4)
- Posted
- 2026-08-12
- Deadline
- 2026-09-02
- Place of performance
- 36702
Description
The U.S. Army Corps of Engineers, Mobile District, has a need for a contract to design and construct a flood risk management and bank stabilization project in the vicinity of downtown Selma, Alabama. The current design is anticipated to consist of approximately 1,000 linear feet of soldier-pile wall along the Alabama River. The soldier pile wall would be constructed to a top elevation of 100-ft NAVD88, and a secondary retaining wall would be constructed to a top elevation of 110-ft NAVD88. Rip-rap protection would be placed at the toe of the wall to a top elevation of 90-ft NAVD88.Contacts
- Jennifer Suit
Email and phone are in the source notice.
More from United States Department of the Army posted in August 2026