ClickCease Pad-Mounted Transformer (W911S226U3773) | Closed - MatchAwards

Pad-Mounted Transformer

Status
Closed, the response deadline passed on Jul 29, 2026
Agency
United States Department of the Army
Office
FORT DRUM, USA
Notice type
Combined Synopsis/Solicitation
Solicitation number
W911S226U3773
NAICS
335311 - Power, Distribution, and Specialty Transformer Manufacturing
PSC
6120 - TRANSFORMERS: DISTRIBUTION AND POWER STATION
Category
Facility Related Materials (4.3)
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
2026-07-22
Deadline
2026-07-29
Place of performance
00934

Description

Provide one Pad Mounted Transformer 750 kVA, 13.2 kV /208Y/120 V. Salient Characteristics: Furnish one (1) pad mounted, dead front, radial transformer, rated: ? Capacity: 750 kVA ? Phases: 3 ? Primary Voltage: 13,200 V (15 kV class) ?Secondary Voltage: 208Y/120 V ? Frequency: 60 Hz ? Phase: Three phase ? Cooling :ONAN ? Fluid: Mineral oil 2. Mandatory Physical Dimensions: The following dimensions are non negotiable: ? Height: 63?� inches (up to 64?� inches) ? Width: 65 inches ? Depth: May varies (existing is 41 inches) The Contractor shall confirm with proposal the manufacturing dimensions, either in writing or by a shop drawing, for government approval. 3. Mechanical and Construction Requirements: The transformer shall include: ?Stainless steel tank, cabinet and hardware (304) ? Dead front construction ? Pentahead security hardware ? ANSI 61 Grey color to match with existing enclosure ? Welded tank construction, sealed and pressure tested ? 1-inch Oil drain valve located on the primary side with 3/8-inch water sampler (required due to secondary side cable congestion) ? Arc-flash and safety labeling ? Lifting lugs and jacking pads ? Nameplate per ANSI C57.12.00 4.Electrical Requirements: ? Primary bushings: (6) 200 A load break wells with inserts for (3)LV and (3) 10KV arresters ? Secondary bushings: NEMA spade w/ supports terminals 10holes (3) LV and (1) neutral per ANSI ? Configuration: Radial Feed ? Impedance: Standard ANSI values for 750 kVA ? Taps: �2 x 2.5% (standard 5 position no load tap changer) 5.Protection and Monitoring: The transformer shall include: ? Bayonet fuse with isolation link? Current limiting fuses ? Load break switch (2 position minimum) ? Nitrogen pressure gauge, test port and blanket ? Temperature gauge ? Pressure vacuum gauge ? Liquid level indicator ? Schrader valve Note: All gauges must be visible. 6. Compliance Requirements: The transformer must comply with: ? ANSI/IEEE C57.12 series ? DOE 2016 efficiency standards ? National Electrical Safety Code (NESC) ? National Electrical Code (NEC /NFPA 70) ? UFGS 26 12 19 ? Pad Mounted, Liquid Filled, Medium Voltage Transformers ?American Buy Act ? PCB-free oil certification ? UL Listed 002. Provide Factory routine test Reports Results and documentation as minimum: ? Insulation resistance test ? Winding resistance test ? Turns ratio (TTR) ?Polarity and phase-relation test ? No-load and load-loss test ? Dielectric test ? Excitation test ?Impedance test ? Applied and Induced potential tests ? Leak Test ? Oil quality test (dielectric strength, moisture, interfacial tension) ? Certified As-built drawings ? Certified test report signed by manufacturer ? Installation and OM manuals ? Warranty documentation (minimum 1 year) ? Destination to the federal facility Fort Buchanan, Puerto Rico00934 ? ECD: 40 weeks ? Unit must arrive fully assembled and ready for installation ?Packing slip must include contract number, PO number, and serial number? Minimum 1 year manufacturer warranty covering defects in equipment.

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of the Army posted in July 2026

More lists