ClickCease C.J. Brown Elevator Market Survey | Closed - MatchAwards

C.J. Brown Elevator Market Survey

Status
Closed, the response deadline passed on Jul 28, 2026
Agency
United States Department of the Army
Office
LOUISVILLE, USA
Notice type
Sources Sought
Solicitation number
W912QR26QEMMS
NAICS
333921 - Elevator and Moving Stairway Manufacturing
PSC
J039 - MAINT/REPAIR/REBUILD OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT
Category
Industrial Products Install / Maintenance / Repair (5.5)
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
2026-07-14
Deadline
2026-07-28
Place of performance
Springfield, Ohio 45503, UNITED STATES

Description

A market survey is being conducted to determine if there are a reasonable number of interested small business concerns to set this future project aside for them. If your firm is a Small Business, certified HUBZone, 8A, Woman-Owned Small Business or Service-Disabled Veteran Owned Business and you are interested in this project please respond appropriately.

Project Location: Springfield, Ohio 45503

Project Description: The elevator at C.J. Brown Dam and Reservoir is original to the project and requires modernization due to obsolete components. The contractor will provide all tools, materials, equipment, and labor to remove and replace the control tower elevator’s electrical and mechanical components with modern, non-proprietary parts serviceable by any independent elevator company. All new components must be compatible with the existing cab, rails, and utilities.

Onsite Elevator Information (Existing Specifications)

Note: All measurements and components will be verified by the contractor prior to installation. All new components will be compatible with the present car and rails associated with the elevator.

LINE ITEM 0001: Elevator Mechanical and Electrical Modernization

LINE ITEM 0002: Inspection, Testing, and Project Deliverables

Contract duration is estimated at 180 calendar days. The estimated cost range is between $250,000 and $500,000.  NAICS code is 333921 – Elevator and Moving Stairway Manufacturing, Size Standard – 1,000 Employees.  All interested Small Businesses, certified HUBZONE, 8A, Woman-Owned Small Business or Service Disabled Veteran Owned Business contractors should respond to this survey by Monday, July 28, 2026 by 3:00 PM Eastern Time.

Responses should include:

  1. Identification and verification of the company’s small business status.
  2. Contractor’s Unique Entity Identifier (UEI) and Cage Code.
  3. Documentation from the firm’s bonding company showing current single and aggregate performance and payment bond limits.
  4. Description of Experience – Provide descriptions on up to three (3) projects completed by you as the prime contractor or if the offeror is a Small Business, they can provide Past Performance of affiliates in accordance with DFARS 215.305(a)(2)(C). Submissions of Past Performance from affiliates shall include documentation of the affiliation to the offeror. To be relevant the projects submitted should be greater than 95% construction complete or completed within the last 5 years and are similar to this project in scope and complexity. Demonstrate experience including self-performing 15% of the construction. Provide documentation demonstrating experience for projects of similar type projects.  Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference. References may be used to verify project size, scope, dollar value, percentages and quality of performance.

  1. Projects similar in Scope to this project include: Removal and replacement of control tower elevator’s electrical and mechanical components with modern, non-proprietary parts.

  1. Projects similar in size to this project include: Elevator Mechanical and Electrical Modernization Projects for 1200 LBS and larger capacity Elevators.

  1. Based on definitions above, for each project submitted include:
  1. Current percentage of construction complete and the date when it was/ will be completed.  
  2. Size of the project
  3. Scope of the project
  4. The dollar value of the construction contract
  5. The portion and percentage of work that was self-performed. Describe the work your company self-performed. Must be at least 15% self-performed.
  6. Identify the number of subcontractors by construction trade utilized for each project.

  1. Small Businesses are reminded under Revolutionary Federal Acquisition Regulation Overhaul (RFO) clause 52.219-14, Limitations on Subcontracting (01 Feb2026); they must perform at least 15% of the cost of the contract, not including the cost of materials, with the firm’s own employees for general construction-type procurement. Include the percentage of work that will be self-performed on this project, and how it will be accomplished.

Submission Requirement: The only authorized transmission method of responses is via filling out the survey form. No other transmission method will be accepted. Please limit your capability statement to the space provided within the form.

Attachments

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of the Army posted in July 2026

More lists